| 1 | E/W in foundation in dry soil including lift upto 1.5 M and lead upto 30 M including back filling, watering and ramming of excavated earth into the structure and the sides of foundation. |
| 2 | Plain Cement Concrete 1:3:6 in cement coarse sand and stone grit in back sides of abutment and wings i/c all cost of material, labour,T&P,etc complete. |
| 3 | Laying C.C. in 1:2:4 mix in Cement Coarse sand and Stonr grit in foundation i/c all cost of material, labour,T&P,etc complete. |
| 4 | Class - 150 ( Non modular ) brick work in 1:3 cement and coarse sand of FM not less than 1.25 mortar in foundation including supply of all material, labour and T&P etc. required for proper completion of the work. |
| 5 | Providing Brick on edge pitching including cost of all labour and T&P etc. Complete./Sqm. |
| 6 | Reinforced Cement Concrete work for Super structure of M20 A20 (1:1.5:3) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc .required for proper completion of the work in all conditions. |
| 7 | Reinforced RCC Cement Concrete work for Super structure of M20 A20 (1:1:2) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc .required for proper completion of the work in all conditions. |
| 8 | Centering and Shuttering in of R.C.C. work including all labour , T&P, etc. |
| 9 | Supplying and laying TMT Steel bar reinforcement as per approved drawing, including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding T&P etc. required for proper completion of the required work. |
| 10 | Struck deep cement pointing 1:2 Cement sand mortar.including cost of all labour and T&P etc. Complete. / Sqm |
| 11 | Providing 12mm thick Cement Plaster (1:4) with cement and coarse sand not less than 1.25 FM including all cost of materials, Scaffolding, T&P, and lab our etc. required for proper completion of work up to 3.00 M height. |
| 12 | S/f tar paper bearing over bed block.including cost of all labour and T&P etc. Complete. |
| 13 | Earth work in making Ramp or Diversion and with compaction in 20.00 cm layers and dressing and also including labour T&Petc required for completion of work |
| 14 | Laying BOE Soling on diversion road dry filled with sand including cost of material, Taxes, labour T&P etc Complete. |
| 15 | Dismentaling of BOE Soling from diversion road including cost of material, Taxes, labour T&P etc Complete. |
| 16 | Disposal of earth from Diversion away from site beyond 600 mtr including cost of material, Taxes, labour T&P etc Complete. |
| 17 | S/F of wheel guard stoneincluding cost of all labour and T&P etc. Complete. |
| 18 | Supplying & fixing 75mm.dia PVC pipe for rain spout.including cost of all labour and T&P etc. Complete. |
| 19 | Supply and Fixing of M.S. Angle Sign Board 60x90 including cost of material,Taxes, labour T&P etc Complete,But excluding of G.S.T.per Nos.: Please Enable Macros to View BoQ information |