| 1 | Transportation, Erection, Dismantling of Rig Machine and its T&P |
| 2 | Transportation, Erection, Dismantling of Compressor 250/350 PSI |
| 3 | Transportation, Erection, Dismantling of 2 Cusec/3cusec O.P Unit and Yield test |
| 4 | Supply of Tubewell AssemblyM.S.Tubewell assembly with all required parts like plain pipe, Slotted pipe (as required upto 50% of plain pipes) rings, well cap bail plug, clamp reducer, central guide, suport structure etc. as required & as per typed design complete in all respect.(Note- Axial Length of Reducer without Ring shall be measured with casing pipe) |
| 5 | 200 mm dia M.S. Pipe 7.1 thikness |
| 6 | 150 mm dia M.S. Plain/slotted 7.1 thikness |
| 7 | PEA-GRAVEL (As per IS:4097) |
| 8 | 1.65 mm to 4.50 mm size Pea gravel of Lalkuwan quarry duly screened, washed and properly stacked at site for Tubewell |
| 9 | Drilling of bore by rig machine As Per IS :2800(Part I & II): |
| 10 | Drilling of bore by 500 mm dia bit GL to 100 mt. BGL. |
| 11 | Drilling of bore by 500 mm dia bit GL to 101 mt. BGL. To 120 mt. BGL. |
| 12 | Lowering of tube well assembly With M.S. rings, Bail Plug, Reducer Including welding: |
| 13 | Lowering of 200 mm dia M.S. Housing pipe from GL to 48 m.BGL |
| 14 | Lowering of 150 mm dia M.S. Plain/slotted pipe 49 m. BGL to 100 m. BGL |
| 15 | Lowering of 150 mm dia M.S. Plain/slotted pipe 101 m. BGL to 110 m. BGL |
| 16 | Development of tube well by 250 PSI air compressor and 3 cusec O.P. Unit to yield sand free discharge. |
| 17 | Development and testing of tube well by Air Compressor. |
| 18 | Development and testing of tube Well O.P.Unit to yield sand free Discharge. |
| 19 | Chemical and Bacteriological |
| 20 | test (Analysis of water sample) |
| 21 | Bentonite (per bag 40kg) |
| 22 | NEW PUMPING PLANT & VOLTAGE STABILIZER |
| 23 | Supply, Installation, testing and Commissioning of 900 lpm , 45 mtr Head Pumping Plant including 15 Hp Submserible Moter Pump set (CRI/KSB) 20 Hp Panal (Bantex/ L&T Make) 24 met coloumn pipe (5.4mm thikness), NRV,CI D/F Bend 90 deg., CI A/F Tee, D/F pipe (1.5 met long-2 Nos and 1 met long- 1 No ), Painting, wiring of pump house (with internal & external electrification), etc. |
| 24 | SITC of 100 mm dia size metal sheeted sluice valves |
| 25 | SITC of Star Delta starter for above pumpset with RS 485 Port-400V Class for above pumpset |
| 26 | SITC of 25 kva servo voltage stabilizer for above pumset |
| 27 | Pressure Gauge |
| 28 | Supply, Fabrication and fitting of MS Canopy suitable for fiiting of Starter Panel, Doser and Stabilizer with proper Base of RCC lift upto 3 feet and fitted with exhaust fan,protected from flood and rain. |
| 29 | S/L of 100mm Ø M.S pipe B-Class up to 15mtr. and making Inter connection of this new line with 15 Hp. Tubewell side and exisiting old pipe line side i/e all T&P C.I.D Joint and labour charge etc. complete. |