| 1 | Earthwork in excavation for bridge works in all kinds of soil, by mechanical means utilising the surplus earth locally for road work where ever required, back filling the excavated earth to the extent required complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 301 & 304 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of the Engineer-in-Charge. |
| 2 | Earthwork in cutting in hard soil within the initial lead and lift including rough dressing and breaking the clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth etc complete and utilising the surplus earth locally for road work where ever required, back filling the excavated earth to the extent required complete in all respect as per approved drawing and technical specifications Section 900 and Clause 301 & 304 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of the Engineer-in-Charge. |
| 3 | Supplying & filling good clean river sand inside the well/approach road including watering to complete saturation & ramming complete with all leads & lifts including cost. Conveyance royality & taxes of all materials & cost of all labour & T&P required for the work complete ( measurement will be taken for compacted section as per direction of Engineer-in-Charge. |
| 4 | Cement concrete (1:3:6) in foundation & plinth with 4cm. crusher broken granite metal of approved quality from approved quarry including hoisting lowering & laying in layers not exceeding 150mm. thick with proper packing & ramming each layer of concrete by means of vibrator ,providing groove & beads where necessary including curing, dewatering, shoring, shuttering if necessary at the time of laying concrete with cost, conveyance royality & taxes of all material required for the work including supplying & working pumps, T&P articles finishing the exposed surface smooth as per specific ation & direction of the Engineer-in Charge. |
| 5 | Plain cement concrete M-15 grade In Sub-Structure with 12mm size crusher broken hard granite broken metal of approved quality from approved quarry including hoisting lowering & laying in layers not exceeding 150mm. thick with proper packing & ramming each layer of concrete by means of vibrator providing groove & beads where necessary including curing, dewatering, shoring, shuttering if necessary at the time of laying concrete with cost, conveyance royality & taxes of all material required for the work including supplying & working pumps, T&P articles finishing the exposed surface smooth as per specific ation & direction of the Engineer-in Charge. |
| 6 | Providing, supplying, driving, and installing hot rolled interlocking steel Z-type Sheet Piles of approved make and section conforming to relevant IS/EN standards, including lifting, pitching, driving to required depth, cutting, welding, joint sealing, alignment, anchorage, bracing, extraction (if required), and all incidental works complete as per drawing and direction of Engineer-in-Charge. |
| 7 | Reinforced Cement Concrete M 30 Grade using 20mm down graded chips of approved quality from approved quarry including hoisting lowering & laying in layers with proper packing & ramming each layer of concrete by means of vibrator providing groove & beads where necessary including curing, dewatering, shoring, shuttering if necessary at the time of laying concrete with cost, conveyance royality & taxes of all material required for the work including supplying & working pumps, T&P articles finishing the exposed surface smooth as per specific ation & direction of the Engineer-in Charge.Foundation / Raft |
| 8 | Abutment & Pier Shaft |
| 9 | Column, Tie Beam, Retaining Wall / Wing Wall |
| 10 | Abutment & Pier Cap |
| 11 | DIRT Wall |
| 12 | Approach Slab |
| 13 | Reinforced Cement Concrete M-25 Grade using 20mm down graded chips of approved quality from approved quarry including hoisting lowering & laying in layers with proper packing & ramming each layer of concrete by means of vibrator providing groove & beads where necessary including curing, dewatering, shoring, shuttering if necessary at the time of laying concrete with cost, conveyance royality & taxes of all material required for the work including supplying & working pumps, T&P articles finishing the exposed surface smooth as per specific ation & direction of the Engineer-in Charge.Deck slab |
| 14 | Road Kerb |
| 15 | Providing and laying R.C.C M-25 Railing with cement, coarse sand, graded stone aggregate, including cost of reinforcement steel, centering & shuttering, mixing, hoisting, placing, compacting by vibrator, curing, finishing, and all incidental charges complete as per approved design and direction of Engineer-in-Charge.R.C.C Railing |
| 16 | Providing ,Cutting, Bending, Binding, Straightening & Placing in position of HYSD bars of grade Fe 500 D confirming to I.S.1786-2008 in bridge works and other structural works etc as per drawing and technical specification and as per Section.900, 1000, 1100 1200, 1600,2100, 2200, 2300 & 2700 of specifications for Road and Bridge works of MORT & H (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. |
| 17 | Providing & laying of wearing course of 56 mm thick consisting of 6 mm thick mastic asphalt and 50 mm thick asphaltic concrete on top of the Deck slab. The mastic asphalt shall be of paving grade bitumen meeting the requirement given in the table 500-39, prepared by using mastic cooker and laid to required level & slope after cleaning the surface, applying prime coat including providing antiskid surface with bitumen precoated fine grained hard stone chipping all complete as per clause 501, 502, 503 & 516 of MoRT&H Specification for road & bridge works (5th revision), followed by asphaltic concrete to be laid in two layers of 25mm thick each over tack coat etc complete as per approved drawing & technical specification Clause No 503 & 507 of MoRT&H specifications for road & Bridge work (5th revision) and as per direction of the Engineer-in-charge. |
| 18 | Providing and laying of Filter media with stone crushed aggregates of 45 mm size satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment , wingwall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specifications. |
| 19 | Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. |
| 20 | Providing Rough stone dry packing in aprons and revetments, stone pitching in slopes and boulder apron of CD works etc with hard granite stone of size 30cm (minimum) and above weighing not less than 40 kg/each as per approved drawing and section 2500 (clause-2504) of specifications for road and bridge works of Ministry of Road Transport & Highways (5th revision) & including cost of all materials, labour, T&P, Royality etc complete in all respect and as per direction of the Engineer In Charge |
| 21 | Grouting approns & revertments 2.3 cm deep with (1:3:6) cement concrete motar with 40 mm down graded size H.G.metal etc. complete as per direction of Engineer - in - charge |
| 22 | Back filling behind abutment, wing wall and return wall complete as per drawing and technical specificationGRANULAR MATERIAL |
| 23 | SANDY MATERIAL |
| 24 | Supplying, Transporting and fixing Reinforced cement concrete (1:2:4) Circular Guard Posts (Size 0.15m dia at bottom & 0.10 M dia at Top of 1.20 m long) of standard design fixed in position including finishing and painting etc all complete as per direction of the Engineer-in-charge. |
| 25 | Providing, fitting and fixing Madular strip seal expansion joints as per approved drawing and technical specifications Section 2600 of MORT & H Specifications for Road & Bridge works (5th Revision) and as per direction of the Engineer-in-charge. |
| 26 | Providing and laying Tar paper bearing etc all complete as per direction of the Engineer-in-charge. |
| 27 | Providing ,fitting, fixing C.I. grating to holes in deck slab including cost & taxes etc. all complete as per direction of the Engineer-in-charge. |
| 28 | Providing and applying two coats of Synthetic Enamel paint over a coat of primer to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescense and applying paint @ 1 litre per 02 Sqm including cost of painting , all materials, T&P required for the work complete for the finished item of work as per technical specifications as per Section 800 of MoRT&H Specifications for Road & Bridge works (5th Revision) and as per direction of the Engineer-in-Charge. |
| 29 | Providing and applying two coats of Water based Cement Paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescense and applying paint @ .25kg per 01 Sqm including cost of painting , all materials, T&P required for the work complete for the finished item of work as per technical specifications as per Section 800 of MoRT&H Specifications for Road & Bridge works (5th Revision) and as per direction of the Engineer-in-Charge. |
| 30 | Dismetalling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonary, cement concrete, wood work, steel work, including T&P and scaffolding whereever necessary, sorting the dismentalled material, disposal of unserviceable material and stacking the serviciable material with all lifts and lead of 1000 m etc complete as per direction of engineer in charge |
| 31 | Clearing and grubbing road land including rank vegitation, grass, bushes, shrubs, sapplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness etc. all complete as per direction of the Engineer-in-charge. |
| 32 | Loosening of the ground upto a level of 500mm below the sub-grade level, watered, graded and compacted in layers to meet requriement of table 300-2 for sub-grade construction and clause 305 of MoRT&H Specifications for Road & Bridge works (4th Revision) |
| 33 | Construction of embankment with approved material obtained from borrow pits with 5 extra lead lifts and leads, transporting to site by mechanical means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoSRT&H Specifications for Road & Bridge works (4th Revision)and as per the direction of engineer in charge. |
| 34 | Providing & construction of Granular Sub Base by providing crushed stone close graded materials of Grading-III as per table 400-1, spreading in uniform layers on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory power roller to achieve the desired density complete as per Clause-401 of MoRTH specifications for Roads & Bridge works (5th Revision) and as per direction of the Engineer-in-Charge. ) |
| 35 | Providin, laying, spreading & compacting graded stone aggregate to Wet Mix Macadam specification including pre mixing the material with water at OMC in mechanical mix plant/pugmill, carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on well prepared surface & compacting with vibratory roller to acieve the desired density as per clause 406 of MoRTH specifications for road & bridge works (5th Revision) and as per direction of Engineer-in-Charge. |
| 36 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.6 kg/sqm using mechanical means as per approved drawing and technical specifications Section 900 and Clause 501.5.2 & 502 of MoRT&H Specifications for Road & Bridge works (5th Revision) and as per direction of the Engineer-in-Charge. |
| 37 | Providing and applying tack coat on the prepared bituminous surface including cleaning with mechanical broom spraying @ 0.20kg/sqm with rapid setting bitumen emulsion (Grade R.S.-1) as per approved drawing and technical specifications as per Section 900 and Clause 501.5.2 & 503 of MoRT&H Specifications for Road & Bridge works (5th Revision) and as per direction of the Engineer-in-Charge. |
| 38 | Providin & laying Bituminous Macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder of viscosity grade bitumen of VG-30, transported to site, laid over previously prepared surface with hydrostatic paver finisher (with sensore control) to the required grade, level & alingment & roling with smooth wheeled,vibratory & tandem rollers to achieve the desired compaction as per clause 501.5.2 & 504 of MoRT&H Specifications for road and bridge works (5th Revision) as per direction of the Engineer-in-Charge. |
| 39 | Providing and laying compacted Semi Dense Bituminous Concrete (Grading-2) with Batch type Hot Mix Plant using crushed stone aggregates of specified grading, premixed with bituminous binder of viscocity grade of bitumen VG-30, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibtratory and tandem rollers to achieve the desired compaction as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501 & 507 of MoRT&H Specifications for Road & Bridge works (4th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of the Engineer-in-Charge. |
| 40 | Providing & laying admisture of Moorum & Sand admixture in Berm / Shoulder in layers not exceding 22.5 cm watering and compaction including hire and running charges of PRR etc complete MoRTH specifications for Roads & Bridge works (5th Revision) and as per direction of the Engineer-in-Charge. ) |
| 41 | Providing & erecting SBY Informatory retro-reflectorised sign as per IRC-67-2012 made of class-B retro reflective sheeting of high intensity prismatic grade sheeting as per ASTM D 4956-09 type-III and IV strictly conforming to clause 6.7 of IRC 67-2012 and vide clause 801.3, fixed over aluminium sheeting, 2.00 mm thick as per clause 6.5.2 of IRC 67-2012 or A.C.P. (Aluminum composite panel) used for sign boards with a thermoplastic core of low density polyethylene (LDPE) between two thick sheets of aluminum with over all thickness of 4mm and aluminum thickness of 0.5mm on both sides supported on mild steel square post 80m x 80mm x 3mm,2 nos and 3 nos horizontal and 1 no vertical extra supporting members of M.S angle of size 50mm x50 mmx6 mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 45 cm x 45 cm x75 cm,60 cm belowground level as per approved drawing including cost, conveyance, royalty, taxes of all materials, labour, T & P, excavation, curing etc. complete, under supervision of Engineer-in-Charge. (3600 mm x 2400 mm Rectangle)SBY Informatory retro-reflectorised Board Please Enable Macros to View BoQ information |