| 1 | Item No.1 :- Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 etc.complete. |
| 2 | Item No.2 :- Excavation for foundation / pipe trenches by all means in hard murum including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. |
| 3 | Item No.3 :- Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metresbeyond the area and lifts as below, stackingas directed by Engineer-in-charge, normaldewatering, excluding backfilling, etc.complete by all means |
| 4 | Item No.4:- Providing, constructing coffer dam in river basin / dam storages as per type design including excavation, filling, the middle portion with B. C. soil (in gunny bags if requried). Providing impervious / semipervious materials on both side of B.C. soil (in gunny bags if required) including ramming, compacting to the satisfaction of Engineer-in-charge, till the complction of work including dismantling coffer dam after completion of works and disposing off the material as directed by the Engineer-in-charge. |
| 5 | Item No.5 :- Providing dry trap/ granite/ quartzite/ gneiss, rubble stone soling in 15 cm to 20 cm thick layers including hand packing and compacting, etc. complete. (Bd-A-12/264) |
| 6 | Item No.6 :-Providing & laying in situ. C.C of trap granite/ quartzite / gneiss/ metal for foundation & bedding including dewatering , from work,compacting, curing, finishing etc. complete. PCC M-150 |
| 7 | Item No.7 :- Providing & costing in constructing in situ. C.C of trap granite/ quartzite / gneiss/ metal of approved quality of R.C.C. work as per detailed drawing & design or as directed by Engg. in charge including dewatering , ceterind from work,compacting, finishing the formed surface with C.M. 1:3 of sufficient minimum etc.complete. RCC M-200 for Protection Wall |
| 8 | Item No.8 :- Providing & fixing in position steel bar reinforcement of various diameters for R.C.C. Pipes,caps,footing, foundation,slab,beams,columns,canopies, staircase, newels,chajjas, lintels,pardies,coping,fine arches etc. as per detailed designs, drawing & schedule s including cutting,bending,hooking the bars,bindingwith wires or tack welding & supporting as required etc. complete (including cost of binding wire). With Lebour Rate Tor Steel |
| 9 | Itemno 9 :- Providing & fixing 80 mm dia. AC/PVC pipe weep holes at 1.5 m c/c straggererd including cost of all materials and labours involved with all leads and lifts etc. complete. |
| 10 | Itemno 10 :- Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete. (Bd-A-10/263) |
| 11 | Item No.11 :- Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. |
| 12 | Add 18% GST Please Enable Macros to View BoQ information |