| 1 | Item No. 1 - Excavation for foundation/pipe trenches in Soft murum, road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in charge, normaldewatering, preparing the bed for foundation and excluding backfilling, etc.complete |
| 2 | Item No. 2 - Excavation for foundation/pipe trenches by all means in hard murum including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc, complete. |
| 3 | Item No.3 - Providing & laying in situ. C.C of trap granite/quartzite /gneiss/metal for foundation & bedding including dewatering, from work,compacting, curing, finishing etc. complete. M 150 |
| 4 | Item No.4:- Providing and casting in situ C.C. of trap/granite/quartzite / gneiss metal of approved quality for RCC works as per detailed drawings and designs or as directed by Engineer-in-charge including normal dewatering, centering, form work, compaction, finishing the formed surfaces with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface wherevermecessary or roughening if special finish is to be provided and curing, etc. complete. (By weigh batching and mix design for M-250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S.orTorreinforcement) R.C.C. M-150 for protection wall |
| 5 | Item no 5 - Providing & fixing in position steel bar reinforcement of various diameters for R.C.C. Pipes caps,footing, foundation, slab,beams,columns, canopies, staircase, newels, chajjas, lintels,pardies, coping, fine arches etc.-as per detailed designs, drawing & schedule s including cutting,bending, hooking the bars, bindingwith wires or tack welding & supporting as required etc. complete (including cost of binding wire). Tor steel |
| 6 | Item no - 6 Providing & fixing 80 mm dia. AC/PVC pipe weep holes at 1.5 m c/c straggererd including cost of all materials and labours involved with all leads and lifts etc. complete. |
| 7 | Item No 7 - Dewatering the excavated trenches and pools of water in the building trenches/pipeline. trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. |
| 8 | Item no - 8 Providing and fixing board displaying information such as'Nameofwork, Tendercost, Nameof Contractor, Workcompletion and liability period etc having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild |
| 9 | Item no.9-Compressive Strength OF C.C. Cube |
| 10 | Add 18% GST Please Enable Macros to View BoQ information |