| 1 | for (A) repairing of 40 HP VT Pump set no-1, 30 HP C/F Pump set no-1 control panel etc and other allied work at Rural W/S scheme Kairo Under D.W. & S. Mech. Division Gumla. |
| 2 | Raw Water pumping plant |
| 3 | Cost of dismantling the motor and taking out bowl assembly from the intake well by supplying all labour, tools and tackles etc at site. |
| 4 | Supply all labour tools and tackles for complete dismantling & opening 40 HP 3 phase VT motor, cutting burnt wire and rewinding supper enameled copper wire, insulating paper, tape bamboo stick etc. Heating Varnishing and testing on full load at site including transportation charge after deducting the cost of scrap materials. |
| 5 | Cost of repairing of 40 HP VT pump set no-1 supplying fitting of pump shaft 1 No top and bottom bush 2-No. Intermediate bush 4 Nos. lock 4-nos. GM impeller etc. all required materials as per requirement including dismantling and refitting all complete with all labour and tools after deducting the cost of scrap materials. |
| 6 | Making and fitting shaft coupling of sleeve muff |
| 7 | Supplying and fitting intermediate rising main shaft bearing |
| 8 | Cost for S/F of head shaft of S.S. non-magnetic materials as per sample. |
| 9 | Cost for S/F of C.I. spider bearing with cut less rubber bush for suitable of 6” dia column pipe. |
| 10 | Cost for repairing with new making and fitting of stuffing box bush with gland packing tightner of in discharge head 10 HP VT p/sets with all labour and materials. |
| 11 | Cost for S/F of line shaft of S.S. non-magnetic materials as per sample. |
| 12 | Cost of consumable materials for above mentioned work such as grease, gland packing, packing paper, cotton waste, bulb, rubber insertion, nut bolt etc required for jointing all suction and delivery pipe etc at site |
| 13 | Cost for S/F of FASD starter suitable for 40 HP vt pump set. |
| 14 | Cost towards dismantling 200 amp, 3 phase industrial type floor mounted L.T. distribution control panel board repairing and fitting with new copper cable for internal jointing/connection, lugs, selector switch, CT coils- 3 nos, voltmeter (0-500)-01,amperemeter(0-100)-01 , MCCB(100A)-1 no, ICTP main switch -1 no,contactor-01,relay-01, control transformer-01, 3 phase indicating lamps-3 nos, 4 strip 200 A copper bus bar- 4 nos. included hardware etc all complete at site. |
| 15 | Cost for supplying and erecting of chemical earthing station as per IE rule including the cost of earth pit, 8 SWG copper wire, G.I. pipe all complete with sand, charcoal and salt etc to all electrical in double way wire connection. |
| 16 | Cost for supplying and laying of 35 mm² x 3 core copper cable PVC insulated and sheathed from panel to starter to motor. |
| 17 | Cost for supplying and laying of 50 mm² x 3.5 core Aluminum cable PVC insulated armoured and sheathed from Transformer to control panel |
| 18 | Supplying and fitting 45 w led street light at pumping plant. Including its accessories labour, tools and technicians at site etc. all complete . |
| 19 | Clear water pumping plant |
| 20 | Supplying all labour tools and tackles for complete dismantling and opening of 30 HP 3 phase inducting motors, cutting burnt wire and rewinding supper enameled copper wire, insulating paper, tape bamboo stick etc. Heating Varnishing and testing on full load at site including transportation charge after deducting the cost of scrap materials (burnt wire Wt. 22 Kg approx.) for set No-1 |
| 21 | Cost for supplying labour, tools and tackles for repairing of C/F pump of 30 HP pump set No-1 with opening and refitting after repairing with S/F of new rotating unit complete having bronze impeller, shaft, neck ring, bearing, bearing housing, etc. all complete with transportation charge. |
| 22 | Supply and fitting of sluice valve (80mm dia)-02nos.NR valve(80mm dia)-02nos. at delivery side of both pump set |
| 23 | Supply and fitting of coupling unit suitable for 30HP motor pump set. |
| 24 | Cost for S/F of FASD starter suitable for 30 HP c/f pump set. |
| 25 | Cost towards dismantling 200 amp, 3 phase L.T. distribution control panel board repairing and fitting with new copper cable for internal jointing/connection, lugs, selector switch, CT coils- 3 nos, voltmeter (0-500)-01,amperemeter(0-100)-01 , MCCB(100A)-1 no, ICTP main switch -1 no,contactor-01,relay-01, control transformer-01, 3 phase indicating lamps-3 nos, 4 strip 200 A copper bus bar- 4 nos. included hardware etc all complete at site. |
| 26 | Cost for supplying and laying of 35 mm² x 3 core copper cable PVC insulated and sheathed from panel to starter to motor. |
| 27 | Cost for supplying and laying of 50 mm² x 3.5 core Aluminum cable PVC insulated armoured and sheathed from Transformer to control panel |
| 28 | Cost of consumable materials for above mentioned work such as grease, gland packing, packing paper, cotton waste, bulb, rubber insertion, nut bolt etc required for jointing all suction and delivery pipe etc at site. |
| 29 | Cost for supplying and erecting of chemical earthing station as per IE rule including the cost of earth pit, 8 SWG copper wire, G.I. pipe all complete with sand, charcoal and salt etc to all electrical in double way wire connection. |
| 30 | Supplying and fitting 45 w led street light at pumping plant. Including its accessories labour, tools and technicians at site etc. all complete |
| 31 | (B) Supply, installation and commissioning of 63 KVA power transformer and cable termination etc. at Raw water pumping Plant for Rural Water supply scheme Kairo Under D.W. & S. Mech. Division Gumla. |
| 32 | Supplying, installation, testing and commissioning of outdoor type 63 KVA 11/ 0.433 KVA copper wound distribution transformer with offload tap changer -12.5% to 2.5% in step of 2.5% continuously rated for three phase, 50 Hz. full load and temperature rise not exceeding 45˚C by transformer in oil and 50˚C by the resistance in winding after continuous run at full load rating, the transformer should have oil immersed winding having vector group of DY11, HT side connect in delta and LT side connect in star with neutral brought out connected. The transformer should have power terminal bushing arrangement on HT side and cable box in LT side with standard fitting for mounting of transformer with first filling of transformer oil including all accessories etc. Transformer shall be latest manufacturing standard and as per amended I.S specification and the load and no losses shall be limited to the values given or as per I.S or norms issued by JSEB all complete with all materials. Make Kirloskar/ Synergy/ Servocon. |
| 33 | Electric Sub Station:- Cost of construction of DP structure for transformer, supplying and erecting steel tubular pole, top bracket, channel, back clamp,11 KV disc insulator with hardware, earthling set complete. MS nut and bolt, MS angle, GI wire, clamp for transformer base, top channel, D.O fuse angle, stay set complete 11 KV lightning arrestor etc. complete as per the site requirement and as per the direction of E/I all complete. |
| 34 | .(c) repairing of 50 HP C/F motor pump set No-2, 10 HP VT pump set No-1&2,Control panel etc. and other allied works at Rural W/S scheme Kuru under D.W. & .S. Mech. Division Gumla. |
| 35 | Clear Water Pumping Plant |
| 36 | Supplying all labour tools and tackles for complete dismantling and opening of 50 HP 3 phase inducting motor, cutting burnt wire and rewinding super enameled copper wire , insulating paper, tape bamboo stick etc. Heating Varnishing and testing on full load at site including transportation charge after deducting the cost of scrap materials (burnt wire wt. 22 Kg approx) for set No-1. |
| 37 | Cost for supplying labour, tools and tackles for repairing of C/F pump of 50 HP pump set No.-1 with opening and refitting after repairing with S/F of new rotating unit complete having bronze impeller, shaft, neck ring, bearing, bearing housing etc. all complete with transportation charge. |
| 38 | Cost of consumable materials for above mentioned work such as grease, gland packing, packing paper, cotton waste, bulb etc required for jointing all suction and delivery pipe etc at site including repairing of sluice valve-2nos and NR valves-2nos. |
| 39 | Renovation of motor control panel with supplying and fitting of following electrical items suitable for 50HP X2 Pump sets.(A)Incoming feeder –(i) 150 amp MCCB – 01 No.(ii) 160 amp copper bus bar arrangement (4pole).(iii) Phase indication lamp – 03 Nos.(B)Out going feeder –(i) 63 amp MCCB – 2 Nos.(ii) Volt meter – 2 Nos.(iii) Amp meter – 2 Nos.(iv) Pilot lamp – 6 Nos.(v) Selector Switch – 4 Nos.(vi) Single phase preventor – 2 nos.Complete internal wiring with suitable size of copper wire and testing on load. |
| 40 | Cost towards repairing of 50 H.P.(CF) FASD starter by replacing its contactor, relay & Timer and socketing Cu lugs etc . |
| 41 | Cost for S/F of FASD starter suitable for 50 HP c/f pump set. |
| 42 | Raw Water Pumping Plant |
| 43 | Cost of dismantling the motor and taking out bowl assembly from the intake well by supplying all labour, tools and tackles etc at site. |
| 44 | Supplying all labour tools and tackles for complete dismantling and opening of 10 HP 3 phase VT motor, cutting burnt wire and rewinding super enameled copper wire , insulating paper, tape bamboo stick etc. Heating Varnishing and testing on full load at site including transportation charge after deducting the cost of scrap materials. |
| 45 | Cost for repairing of 10 HP VT pump make mather and platt supplying and fitting of pump shaft 1 no. top and bottom bush 2 no. intermediate bush 4 nos. lock 4 nos. CI impeller etc. all required materials as per requirement including dismantling and refitting all complete with all labour and tools after deducting the cost of scrap materials. |
| 46 | Cost for S/F of C.I. spider bearing with cut less rubber bush for suitable of 6” dia column pipe. |
| 47 | Making and fitting shaft coupling of sleeve muff |
| 48 | Supplying and fitting intermediate rising main shaft bearing |
| 49 | Cost for S/F of head shaft of S.S. non-magnetic materials as per sample. |
| 50 | Cost for repairing with new making and fitting of stuffing box bush with gland packing tightner of in discharge head 10 HP VT p/sets with all labour and materials. |
| 51 | Cost for S/F of line shaft of S.S. non-magnetic materials as per sample. |
| 52 | Cost of consumable materials such as grease, gland packing, packing paper, cotton waste, bulb, rubber insertion, nut bolt etc required for jointing all suction and delivery pipe etc at site . |
| 53 | Renovation of motor control panel with supplying and fitting of following electrical items suitable for 10HP X2 Pump sets.(A)Incoming feeder –(i) 100 amp MCCB – 01 No.(ii) 160 amp copper bus bar arrangement (4pole).(iii) Phase indication lamp – 03 Nos.(B)Out going feeder –(i) 63 amp MCCB – 2 Nos.(ii) Volt meter – 2 Nos.(iii) Amp meter – 2 Nos.(iv) Pilot lamp – 6 Nos.(v) Selector Switch – 4 Nos.(vi) Single phase preventor – 2 nos.Complete internal wiring with suitable size of copper wire and testing on load. |
| 54 | Cost towards repairing of 10 H.P.(VT) Star-Delta,type-MK-1,starter by replacing its contactor, relay & Timer and socketing Cu lugs etc . |
| 55 | Cost for supplying and laying of 16 mm² x 3 core copper cable PVC insulated and sheathed from panel to starter to motor. |
| 56 | Cost for supplying and laying of 35 mm² x 3.5 core Aluminum cable PVC insulated armoured and sheathed from Transformer to control panel |
| 57 | Supplying and fitting 45 w led street light at pumping plant. Including its accessories labour, tools and technicians at site etc. all complete . Please Enable Macros to View BoQ information |