|
| 1 | Comprehensive maintenance (Consisting of normal repairs) preventive maint as per OEM direction Ones in four months of electrically operated travelling (EOT) Flame Proof cranes of capacity 5 Ton make: Rock well & Cranex at site complete all as specified.Note: - (a) The crane shall be repaired by OEM or its authorised service Engineer/workshop/channel partner.(b). Replacement of the unserviceable spare parts shall be measured and paid sepreatly.(i) Long Traverse(a). Cleaning of Gear box and oil level checking rectification of leakages if any.(b). Checking Assembly vibration.(c). Brake Adjustment.(d). Long Traverse wheel checking for any noise.(e). Geared couplings - grease checking and nut tightening.(f). Checking of hydraulic oil in thrustor brake(g). Checking of electric motor connections(h). To check the cut off at extreme end with limit switch.(i). Checking and greasing \ oiling of plumber block.(j). Long traverse. |
| 2 | (ii) Cross Traverse(a). Cleaning of Gear box and oil level checking rectification of leakages if any.(b). Checking Assembly vibration.(c). Brake Adjustment.(d). Long Traverse wheel checking for any noise.(e). Geared couplings - grease checking and nut tightening.(f). Checking of hydraulic oil in thrustor brake(g). Checking of electric motor connections(h). To check the cut off at extreme end with limit switch.(i). Checking and greasing \ oiling of plumber block.(j). Cross traverse. |
| 3 | (iii) Hoist Motion (a). Gear box oil level check & rectification of leakages.(b). Checking Assembly vibration.(c). Brake Adjustment.(d). Checking for the main bearing of the rope drum including greasing.(e). Geared couplings - grease checking and nut tightening.(f). Checking of hydraulic oil in thrustor brake.(g). Checking of electric motor connections.(h). Checking wire rope & greasing.(i). Adjustment of rotory limit switch.(j). Bearing grease \ oiling in bottom block \ hock. (k) Repairing/straingthnening of hoist limit mechanism rod with adjustable coupling.(iv). Electrical Network(a). Checking the contractor for overheating and flashing.(b). general checking of contacts and connections.(c). Cleaning of control panels.(d). Checking of connection AC Drive and othher drives for smooth functioning of the same.(v). Down shop lead (DSL)(a). Checking the alingment and rectification.(b). Cleaning of the moving \ slidding objects. |
| 4 | Comprehensive maintenance (Consisting of normal repairs) preventive maint as follows Ones in four months of electrically operated travelling (EOT) cranes of capacity 2 Ton make: Rock well at site complete all as specified Note: -(a) The crane shall be repaired by OEM or its authorised service Engineer/workshop/channel partner.(b). Replacement of the unserviceable spare parts shall be measured and paid sepreatly.(i) Long Traverse(a). Cleaning of Gear box and oil level checking rectification of leakages if any.(b). Checking Assembly vibration.(c). Brake Adjustment.(d). Long Traverse wheel checking for any noise.(e). Geared couplings - grease checking and nut tightening.(f). Checking of hydraulic oil in thrustor brake(g). Checking of electric motor connections(h). To check the cut off at extreme end with limit switch.(i). Checking and greasing \ oiling of plumber block.(j). Long traverse. |
| 5 | (ii) Cross Traverse(a). Cleaning of Gear box and oil level checking rectification of leakages if any.(b). Checking Assembly vibration.(c). Brake Adjustment.(d). Long Traverse wheel checking for any noise.(e). Geared couplings - grease checking and nut tightening.(f). Checking of hydraulic oil in thrustor brake(g). Checking of electric motor connections(h). To check the cut off at extreme end with limit switch.(i). Checking and greasing \ oiling of plumber block.(j). Cross traverse. (iii) Hoist Motion (a). Gear box oil level check & rectification of leakages.(b). Checking Assembly vibration.(c). Brake Adjustment.(f). Checking of hydraulic oil in thrustor brake.(g). Checking of electric motor connections.(h). Checking wire rope & greasing.(i). Adjustment of rotory limit switch.(j). Bearing grease \ oiling in bottom block \ hock. |
| 6 | (iv). Electrical Network(a). Checking the contractor for overheating and flashing.(b). general checking of contacts and connections.(c). Cleaning of control panels.(d). Checking of connection AC Drive and othher drives for smooth functioning of the same.(v). Down shop lead (DSL)(a). Checking the alingment and rectification.(b). Cleaning of the moving \ slidding objects.Ditto as per sr No 1 above but for electrically operated travelling (EOT) cranes of capacity 2 Ton make: Rock well |
| 7 | Comprehensive maintenance (Consisting of normal repairs) preventive maint as follows Ones in four months of mechanically operated cranes of capacity-03 Ton at 8 MSD shed,39 FAD area including cheking of strength and proper functioning of chain pulley and chain at site, greasing/oiling, hoist streingthnening/repair work complete all as specified and directed by Engineer -in- Charge |
| 8 | M&L for painting of 05 Ton EOT crane ,applying one coat of red oxide primer and two coat of synthetic enamled spray paint of existing color on different surafces incl preparing of old steel surface by scratching/removing rust, dust and old paint etc with wire brush, emery paper, grinder etc and making surfaces smooth for achieving better grip between surafce and primer, complete all as directed by Engr-in-charge. |
| 9 | M&L for painting of 02 Ton EOT and 03 Tone HOT crane ,applying one coat of red oxide primer and two coat of synthetic enamled spray paint of existing color on different surafces incl preparing of old steel surface by scratching/removing rust, dust and old paint etc with wire brush, emery paper, grinder etc and making surfaces smooth for achieving better grip between surafce and primer, complete all as directed by Engr-in-charge. |
| 10 | Attending Complaints and rectification of electronic, electrical and mechanical defects by authorized experience technician for flame proof EOT crane of capacity upto 5 Ton, Checking of uncerviciable electrical system and find out defect of control wiring in control panel (Hoist, Long Travel, Cross Travel) Control Switch Limit Switch Rectified the same and made serviciable complete and testing thereafter complete all as specified and directed by engineer - in - charge. Note: - (a). The complaint shall be notified to the contractor by engineer - in - charge / JE E&M telephonically / personnaly / by SMS recorded in the register mentioned for the purpose. (b). Contractor shall make neccessary arrangement to attend the complaint.(c). Cost of any minor nature of repair / replacement of petty item such as nuts, bolts, washers, screws, piece of electrical cable upto 0.5 meter length etc, is deemed included in the unit rate quoted by the contractor.(d). Any other major item / repair required for the rectification shall be measured and paid seperately under respective item of the schedule as supply only. |
| 11 | Supply only single phase preventer for EOT crane & connecting complete all as directed by Engr- in- Charge. Make:- L&T / BCH / Minilec |
| 12 | Supply only Power contactor 09A AC3 3 phase 415V AC with 1NO + 1NC , auxiliary contact,Coil voltage 24V DC Make:- Schneider, L&T, Siemens |
| 13 | Supply only Power contactor 25A AC3 3 phase 415V AC with 1NO + 1NC ,auxiliary contact ,Coil voltage 24V DC Make:- Schneider, L&T, Siemens |
| 14 | Supply only Power contactor 18A AC3 3 phase 415V AC with 1NO + 1NC ,auxiliary contact, Coil voltage 24V DC Make:- Schneider, L&T, Siemens |
| 15 | Supply only Power contactor 16A AC3 3 phase 415V AC with 1NO + 1NC ,auxiliary contact, Coil voltage 110V DC Make:- BCH, L&T, Siemens |
| 16 | Supply only Power contactor Size 3 45A AC 3 phase 415V AC with 1NO + 1NC ,auxiliary contact ,Coil voltage 110V DC Make:- BCH, L&T, Siemens |
| 17 | Supply only Thermal overload relay 3 phase 415V AC relay range 12-18A Make:- Schneider, L&T, Siemens |
| 18 | Supply only Thermal overload relay 3 phase 415V AC relay range 2.5 - 4A Make:- Schneider, L&T, Siemens |
| 19 | Supply only Step Down Transformer double wound, 415-400-380-0/0,12,24,30,110V AC 100VA Make:- USGC, VK, Crane Control |
| 20 | Supply only Step Down Transformer 415-400-380-0/0,110,220V AC 0.5KVA Make:- USGC, VK, Crane Control Please Enable Macros to View BoQ information |
| 21 | Supply only Step Down Transformer 415-400-380-0/0,110,220V AC 0.5KVA Make:- USGC, VK, Crane Control Please Enable Macros to View BoQ information |