|
| 1 | Providing and Replacement of Gun metal bush of ceiling/exhaust/cooler fan/ as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 2 | P & F 3 Speed rotary switch for Desert Cooler complete with testing etc as required. |
| 3 | P & Replacement of M.S. Shaft of fan motor for Desert Cooler/ exhaust fan. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 4 | P & replacement of supporting legs(4 no.) of vertical pump of desert cooler as required for Desert Cooler/ exhaust fan. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 5 | P & F of stud with nuts and washer for Desert Cooler/ exhaust fan.All the scrap material should be retained by the contractor. |
| 6 | Servicing and overhauling of 20\\" sweep desert cooler including oiling, greasing, painting of tank from inside with rubber paint after properly desmantling each assembly and refixing the same as required. |
| 7 | Painting of desert cooler with two coats of rubber paint inside of water tank and two coat of synthetic enamelled paint on both side of cooler body, fan body, grills etc.after cleaning with sand paper, complete in all respect as required. |
| 8 | Replacement of cooler pads (heavy) set of 3 no. of size 25\\" x 27\\" |
| 9 | P & F Brass float valve of weighing approx. 250 gm, 8\\" long rod,PVC ball of 4\\" dia. For desert coler as required. |
| 10 | P & F adjustable M.S.grill 20/22 gauge of size approx. 24\\" x 26\\" including painting etc. as required. |
| 11 | P & F aluminiun blade for 20'' desert cooler fan as required. |
| 12 | P & Replacement of pvc pipe of 1/2\\" size for vertical pump of desert cooler as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 13 | P & replacement of shaft for vertical pump of desert cooler as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 14 | P & F of submercible pump set suitable for 18/24 \\"Desert coolers. |
| 15 | P & F cooler fan motor suitable for 20\\" desert cooler including making connection testing etc. as required. |
| 16 | with copper winding Motor ISI Marked |
| 17 | GST@18% Please Enable Macros to View BoQ information |