| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, brush, shrubs, saplings and trees of girth upto 300mm, removal of stumps, disposal of unserviceable Material and stacking of serviceable Material upto 1000m from road boundary. (MoRTH Specification : Clause 201).BY MECHANICAL MEANS In area of Light Jungle |
| 2 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M20 grade Nominal Mix 1: 1.5: 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). |
| 3 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:Cement Mortar 1:6 ( 1-Cement : 6-Sand). |
| 4 | Providing and laying damp-proof course with cement concrete grade M-150 (1 : 2 : 4) mortar prepared with 1% solution of water-proof compound complete as per specification . |
| 5 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. 20 grade Nominal Mix / Design Mix |
| 6 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor Three level. Thermo-mechanically Treated bars (Conforming of relevent IS code) |
| 7 | Centering and Shuttering with plywood or steel plate including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. |
| 8 | Providing and fixing steel gate, grating , and grills made of angles, tees, square bars, flats,or black pipe with holdfast and fittings complete as per design and drawing including cutting welding and fabrication with priming coat of red oxide |
| 9 | Extra if square,rectangular hollow tubelar sections are used or grill made by flats only |
| 10 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work |
| 11 | Stone work (machine cut edges) for Wall cladding/ Veneering work up to 10 m height with 20 to 30 mm thick Pink Sand stone (Bansi Paharpur) and backing filled with a grout of 12mm thick cement mortar 1:3 (1 cement : 3 coarse sand) including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade : (To be secured to the backing by means of cramps which shall be paid separately) |
| 12 | Supplying and fixing machine cut dressed 75 mm Pink sand stone (Bansi Paharpur) dasa/ coping wth ornamental shape having moulding and \\"PAN Shape\\" engraving as per required pattern with engraving depth of 5 mm (average) in single piece of length 90 cm to be laid on cement mortar 1:4 (12 to 20mm thick) including pointing with admixture of pigment matching with the stone shade. |
| 13 | Providing and fixing Stone jali 50mm thick Red/Pink sand stone as per ornamental design to fixed with white cement/epoxy mortar including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment, matching the stone shade. |
| 14 | Providing and fixing Red/Pink sand stone post (Mataga) having size 100x100mm heights 600 to 750 mm as per ornamental design such as like flower octonogal head border etc. to fixed with white cement/epoxy mortar including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment, matching the stone shade. |
| 15 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 |
| 16 | Supply & Stacking good soil of earth at site complete including loading unloading & Transportation etc. |
| 17 | Supply of dry manure including loading unloading,transportation & stacking at site.Farm yard manure(organic) |
| 18 | Spreading of manure , good earth in required thickness (cost of manure and good earth to be separately ) |
| 19 | Laying of Selection No.1 grass tiles (2’X2’ size) for development of garden, including levelling of soil and spreading of manure |
| 20 | laosnd }kjk fuEu çtkfr;ksa ds 'kcZl dh vkiwfrZ ,oa yxkukA ikS/kk LoLFk gksuk pkfg,A ikS/kksa dh Å¡pkbZ 0-40 ls 0-50 eh- rd ALalri /Anermi /Golden Duranta |
| 21 | Supply and plantation of selected specmen & Ornamental trees including/ unloading & transportation etc. complete Ficus panda 4'-5' topiary dia 3'-4' |
| 22 | Supply of different varieties of bougainvillea in ply bags/earthen pot according to height growth and age of plant at site including loading unloading and transportation etc. complete Different varieties of bougainvillea 600mm to 900mm |
| 23 | Supply of different varieties of palms in poly bags/earthen pot according to height growth and age of plant at site including loading unloading and transportation etc. completeArica palm many branches 5 to 6 feet |
| 24 | Bottle palm 5 to 8 feet |
| 25 | Supply of different varieties of rose plants in poly bag/ earthen pot according to height growth and age of the plant at site including loading unloading and transportation etc. complete Ganganagari rose plant in poly beg |
| 26 | nwc dk la/kkj.k dk;Z &yxh gqbZ nwc dk la/kkj.k dk;Z esa [kjirokj fudkyuk] fu;fer flapkbZ djuk] [kkn Mkyuk ,oa e’khu ds }kjk fu;fer dVkbZ djuk rkfd nwc vPNh rjg ls fodflr gks ldsA |
| 27 | Maintenance of Hedge, Climbers, Shrubs at parks including watering, trimming, preparation of thawala, manure and complete work. |
| 28 | Maintenace of Plants by the contractor including of pits/bids watering preparation of Thavala Hoeing weeding etc. & application of insecticides etc. & security if the plant die during maintenance contractor has to replace same height plant at his own cost. Please Enable Macros to View BoQ information |