|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upro 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. All kinds of soil As per D.S.R. 2.6.1 (Rates are excluding G.S.T. but including all other taxes, labour & material cost, Labour Cess and T&P etc. required for proper completion of the work) |
| 2 | Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed wtih in a lead of 50 m and lift upto 1.5 m. All kinds of soil As per D.S.R. 2.30.1 (Rates are excluding G.S.T. but including all other taxes, labour & material cost, Labour Cess and T&P etc. required for proper completion of the work) |
| 3 | Supplying and filling in plinth with fine sand under floors, including watering, ramming, consolidating and dressing complete. As per D.S.R. 2.27 (Rates are excluding G.S.T. but including all other taxes, labour & material cost, Labour Cess and T&P etc. required for proper completion of the work) |
| 4 | 52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement 2 coarse sand 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix: 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per manufacturer's specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete. As per D.S.R. 11.4 (Rates are excluding G.S.T. but including all other taxes, labour & material cost, Labour Cess and T&P etc. required for proper completion of the work) |
| 5 | 1:5:10 (1 Cement: 5 coarse sand (zone-III) derived from natural sources: 10 graded stone aggregate 40 mm nominal size derived from natural sources As per D.S.R. 4.1.10 (Rates are excluding G.S.T. but including all other taxes, labour & material cost, Labour Cess and T&P etc. required for proper completion of the work) |
| 6 | 1:3:6 (1 Cement: 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 40 min nominal size derived from natural sources) As per D.S.R. 4.1.5 (Rates are excluding G.S.T. but including all other taxes, labour & material cost, Labour Cess and T&P etc. required for proper completion of the work) |
| 7 | Providing & Fixing Badminton Pole with Net Fixed Type, 50 mm NB GI Pipe, Pully Net Nylon 9 ply , Height Adjuster and its height from ground 5 feet (Rates are excluding G.S.T. but including all other taxes, labour & material cost, Labour Cess and T&P etc. required for proper completion of the work) |
| 8 | Providing & Fixing Basket Ball Pole Single Fixed Type, with 6\\" Round Mild Steel Pipe, 18 mm Acrylic 21\\" 12 loops Net 20 mm solid bar Ring etc height from ground 8 Feet. (Rates are excluding G.S.T. but including all other taxes, labour & material cost, Labour Cess and T&P etc. required for proper completion of the work) |
| 9 | Providing & Fixing Double See- Saw with 35 mm N.B. G.I. Pipe main frame, 25 mm N.B. G.I. Pipe Support , LLDPE seat with 4 children capacity and height from ground 0.5 metre (Rates are excluding G.S.T. but including all other taxes, labour & material cost, Labour Cess and T&P etc. required for proper completion of the work) |
| 10 | Providing & Fixing Cross Walker with 100 mm NB A class GI Pipe, other pipes are of 50 mm, 40 mm and 32 mm NB A class GI Pipe and Footrest of Mild Steel (Rates are excluding G.S.T. but including all other taxes, labour & material cost, Labour Cess and T&P etc. required for proper completion of the work) |
| 11 | Providing & Fixing Stepper with Glider with Main Pipe of 100 NB A class GI Pipe and other Pipes are of 50 mm, 40 mm and 32 mm NB A class GI Pipes and Footrest of Mild Steel (Rates are excluding G.S.T. but including all other taxes, labour & material cost, Labour Cess and T&P etc. required for proper completion of the work) |
| 12 | Providing & Fixing Bridge Ladder with Structure Pipe 32 mm GI Pipe A Class and Rung of 25 mm GI Pipe A Class, Length of Ladder 10 feet and Height from the ground 8 feet. (Rates are excluding G.S.T. but including all other taxes, labour & material cost, Labour Cess and T&P etc. required for proper completion of the work) |
| 13 | Providing & Fixing Rainbow Climber with Structure Pipe 32 mm GI Pipe A Class and Rung of 25 mm GI Pipe A Class, Length of Climber 8 feet and Height from the ground 6 feet. (Rates are excluding G.S.T. but including all other taxes, labour & material cost, Labour Cess and T&P etc. required for proper completion of the work) Please Enable Macros to View BoQ information |