|
| 1 | Supply,laying, testing and commissioning XLPE insulated, screened, PVC bedded, galvanized strip or armored power cables (heavy duty) with stranded aluminium conductor ,11000 Volts grade underground cable of size 3 core, 120 Sq mm complete all as specified and as directed |
| 2 | Supply and fix cable jointing kit for 11 KV (Earthed) grade cable for straight through heat shrinkable type suitable for underground XLPE cable size 3 core 120 Sqmm 11 KV HT cable all as specified and directed . |
| 3 | Supply and fix cable jointing kit for 11 KV (Earthed) grade cable for indoor termination heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 3 core 120 Sqmm 11 KV HT cable all as specified and directed . |
| 4 | Supply and fix GI pipe 100 mm dia light grade complete with all fitting for supporting cable on four pole structure complete all as specified and directed. |
| 5 | M&L for PCC 1:4:8 type D-2 using 40 mm graded stone aggregates for fixing cable protection pipes at Nalls all as specified and directed by Engineer-in-Charge. |
| 6 | Supply and cross arm, bracing, supports, clamps and back plate fabricated from structural steel section including nuts, bolts, washers,welding, bending, drillingholes for bolts in any shape and any size inclusive of one primer coat, two coats of aluminium paints as indicateed complete all as specified and as directed by Engineer in charge |
| 7 | M&L cable path indicator made with PCC block of size 45x60x10 cm with 1:2:4 using 20mm graded stone aggregates on 20cm PCC bedding with embosing description in words as embedded loop/joint on the block ,complete all as specified and directed by Engr-in-Charge. |
| 8 | Excavation in trenches not exc 1.5 m in depth and not exc 1.5 m wide for taking out/laying cable and getting out in Hard rock complete all specified/directed |
| 9 | Excavation in trenches not exc 1.5 m in depth and not exc 1.5 m wide for taking out/laying cable and getting out in Hard/dense soil complete all specified/directed |
| 10 | Removing excavation soil at a distance not exc 50 m and deposited where diverted complete all as directed |
| 11 | Returning, filling in including spreading, leveling, watering and well rumming in layers not exc 25 cm complete all as directed |
| 12 | Sand cushioning for cable protection by spreading in trenches crushed stone sand by gently punning down manually.Note:- Punnned thickness shall only be measured and paid. |
| 13 | Supply and laying un reinforced precast concrete cable cover class EHV, type-I, flat size 300 mm x 180 mm x 40 mm laid in trenches. Please Enable Macros to View BoQ information |