| 1 | M&L for cleaning of over head RCC Reservior having single or double compartment by brooming the isde wall / bottom and ceiling dome of the tank, removing all fungus, scales, dust and scraping sludge , bleaching sediments, deposition and other foreign material with wire brush from inside the tanks, taking out the sludge and other foreign materials from the tanks and removing to a distances exc 50M and not exceeding 100 M including washing with water and dis-infection chemical such as bleaching powder solution /Potassium permanganate solution complete with entire satisfaction of engineer-in -charge and then applying one coat of white wash on all internal surfaces of the tanks including writting date of the cleaning, CA No , name of contractor, due date & capacity of Tank etc on pillar of RCC Tank using synthetic enamel black / white paint complete all as specified and directed for the following capacity and staging :- |
| 2 | 50000 Gallons capacity RCC OH Tank having single compartment at 50 feet stagging. |
| 3 | Description all as per item No 01 here-in-before but 50000 Gallons capacity RCC OH Tank having single compartment at 60 feet stagging. |
| 4 | Description all as per item No 01 here-in-before but 200000 Gallon RCC OH Tank having 2 compartment upto 60 feet stagging. |
| 5 | Description all as per item No 01 here-in-before but 40000 gallons capacity RCC OH tank having single compartment at 60 feet stagging. |
| 6 | Description all as per item No 01 here-in-before but for RCC/Brick over head reservoir of 20000 gallons capacity at upto 50 feet stagging. |
| 7 | Description all as per item No 01 here-in-before but for RCC/Brick over head reservoir of 10000 gallons capacity at upto 40 feet stagging. |
| 8 | Description all as per item No 01 here-in-before but under ground RCC reservoir of following capacity :- . |
| 9 | 167000 gallons capacity . |
| 10 | 120000 gallons capacity . |
| 11 | 100000 gallons capacity. |
| 12 | 50000 Gallons capacity. |
| 13 | 40000 Gallons capacity. |
| 14 | 20000 gallons capacity. |
| 15 | 10000/8000 gallons capacity. Please Enable Macros to View BoQ information SCHEDULE OF CREDIT 1. All worn out/unserviceable materials/items which will be obtained from different items of Sch `A’/ BOQ (as mentioned above) during replacement work, shall become contractor’s property and amount of credit shall be recovered from the contractor's RAR & final bill as and when payments are submitted. These materials shall be allowed to be removed from works site only after credit amount for the same is recovered from the contractor’s payment. Items not covered under this Schedule shall become the property of department and the same shall be returned/ deposited by the contractor at MES store yard without any extra cost to department/ government and all materials which are credited to the contractor, shall be recorded in MB 2. The contractor shall have no claim regarding fixation of credit rates in this schedule and no rebate on \\"Schedule of credit\\" rates/ amount shall be accepted. However contractor can offer more credit rates/ amount. 3. The total credit amount may vary as per execution of work above different items involved in this credit schedule. 4. The quantities given in column 4 are provisional and same shall be measured and paid based on actual quantities obtained against relevant items of Schedule ‘A’/ BOQ. These materials shall not be reused/ reincorporated in the work except where specified. 5. The measurements of dismantled materials shall be the gross quantity obtained and not the net quantity considered for payment in schedule. The old and unserviceable materials to be retrieved from taking down/demolition/dismantling etc are considered in schedule of credit. No claim of contractor with regard to quality/position of old materials shall be entertained Srl No Description of item Qty Unit Assessed rate by department Remarks Rate in (Rs) Amount in (Rs) |
| 16 | 10000/8000 gallons capacity. Please Enable Macros to View BoQ information SCHEDULE OF CREDIT 1. All worn out/unserviceable materials/items which will be obtained from different items of Sch `A’/ BOQ (as mentioned above) during replacement work, shall become contractor’s property and amount of credit shall be recovered from the contractor's RAR & final bill as and when payments are submitted. These materials shall be allowed to be removed from works site only after credit amount for the same is recovered from the contractor’s payment. Items not covered under this Schedule shall become the property of department and the same shall be returned/ deposited by the contractor at MES store yard without any extra cost to department/ government and all materials which are credited to the contractor, shall be recorded in MB 2. The contractor shall have no claim regarding fixation of credit rates in this schedule and no rebate on \\"Schedule of credit\\" rates/ amount shall be accepted. However contractor can offer more credit rates/ amount. 3. The total credit amount may vary as per execution of work above different items involved in this credit schedule. 4. The quantities given in column 4 are provisional and same shall be measured and paid based on actual quantities obtained against relevant items of Schedule ‘A’/ BOQ. These materials shall not be reused/ reincorporated in the work except where specified. 5. The measurements of dismantled materials shall be the gross quantity obtained and not the net quantity considered for payment in schedule. The old and unserviceable materials to be retrieved from taking down/demolition/dismantling etc are considered in schedule of credit. No claim of contractor with regard to quality/position of old materials shall be entertained Srl No Description of item Qty Unit Assessed rate by department Remarks Rate in (Rs) Amount in (Rs) |
| 17 | Iron Scrap |
| 18 | Old unserviceable earthing materials |
| 19 | Old unserviceable CI /DI pipe 80 mm |
| 20 | Old unserviceable CI /DI pipe 100 mm |
| 21 | Old unserviceable CI /DI pipe 150 mm |
| 22 | Old unserviceable cast iron sluice valve of size 300mm bore |
| 23 | Old unserviceable cast iron sluice valve of size 200mm bore |
| 24 | Old unserviceable cast iron sluice valve of size 150mm bore |
| 25 | Old unserviceable cast iron sluice valve of size 100 mm bore |
| 26 | Old unserviceable cast iron sluice valve of size 80mm bore |
| 27 | Old unserviceable GI Tubing 15 mm |
| 28 | Old unserviceable GI Tubing 20 mm |
| 29 | Old unserviceable GI Tubing 25 mm |
| 30 | Old unserviceable GI Tubing 40 mm |
| 31 | Old unserviceable GI Tubing 50 mm |
| 32 | Old unserviceable GI Tubing 80 mm |
| 33 | Old unserviceable GI Tubing 100 mm |
| 34 | Old unserviceable Gun Metal Gate Valve 50 mm |
| 35 | Old unserviceable Gun Metal Gate Valve 40 mm |
| 36 | Old unserviceable Gun Metal Gate Valve 25 mm |
| 37 | Old unserviceable Gun Metal Gate Valve 20 mm |
| 38 | Old unserviceable Gun Metal Gate Valve 15 mm |
| 39 | Old unserviceable Submersible cable of any size |
| 40 | Old unserviceable Bollard light |
| 41 | Old unserviceable materials obtained from valve pits of any type /size |
| 42 | Old unserviceable water level controller / display monitor |
| 43 | Old unserviceable signal repeater / repeater booster |
| 44 | Old unserviceable digital water level data transmitter |
| 45 | Old unserviceable flood light fittings 150 watt |
| 46 | Old unserviceable pump set of 1.5 HP |
| 47 | Old unserviceable NRV 80 mm dia |
| 48 | Old unserviceable NRV 100 mm dia |
| 49 | Old unserviceable NRV 150 mm dia Total amount of credit schedule 118660.0 Signature of contractor AGE (Contracts) For ACCEPTING OFFICER |