| 1 | Construction of HT line for Solar connection in Tarikhet section under MSSY |
| 2 | SUPPLY |
| 3 | Stay clamp for SP-23 with N&B |
| 4 | Earth wire clamp for SP-23 with N&B |
| 5 | PP & Clamp with N&B ST pole SP-23 |
| 6 | Stay Insulator 75x90mm |
| 7 | LABOUR PART (WORK) |
| 8 | Fabrication of steel |
| 9 | Excavation of pit for stay set |
| 10 | Errection of 11 KV stay set |
| 11 | Grouting of stay set |
| 12 | Excavation of pit for pole |
| 13 | Errection of SP-23 Double pole |
| 14 | Grouting of pole |
| 15 | Muffing of pole |
| 16 | Laying of Rabbit conductor in HT line |
| 17 | Cartage of SP-21/23 pole, 71-100 Km |
| 18 | Cartage of petty material, 71-100 Km |
| 19 | Head load cartage of SP-21/23 pole(0-1 km) |
| 20 | Head load cartage of material (0-1 km) |
| 21 | Construction of 11 KV line for power evacuation in Dwarahat section under MSSY |
| 22 | SUPPLY |
| 23 | Stay clamp for SP-23 double ended |
| 24 | Earth wire clamp for SP-23 with N&B |
| 25 | PP & Clamp with N&B ST pole SP-23 |
| 26 | Bracing clamp Top for SP_23 with N&B |
| 27 | Bracing clamp bottom for SP-23 with N&B |
| 28 | 11 KV PRMC Metering cubicle |
| 29 | LABOUR PART (WORK) |
| 30 | Errection of earthing rod |
| 31 | Fabrication of steel |
| 32 | Excavation of pit for stay set |
| 33 | Errection of 11 KV stay set |
| 34 | Grouting of stay set |
| 35 | Excavation of pit for pole |
| 36 | Errection of SP-23 Double pole |
| 37 | Grouting of pole |
| 38 | Muffing of pole |
| 39 | Installation of HT PRMC |
| 40 | Laying of U/G 11 KV vable in Trench |
| 41 | Laying of Rabbit conductor in HT line |
| 42 | Fixing of 11 KV XLPE Jointing kit |
| 43 | Cartage of SP_21/23 pole, 101-150 km |
| 44 | Cartage of petty material, 101-150 Km |
| 45 | Head load cartage of SP-21/23 pole(1-3 km) |
| 46 | Head load cartage of material (1-3 km) Please Enable Macros to View BoQ information |