| 1 | Materials for 11 KV Cut Point with 90 Degree Angle (Part-A)WPB (GI) Pole 160X152 (11Mtr. Long, 30.44Kg/ Mtr.) (Total Pole Weight with Base Plate & Stiffner= 334.84 Kg+10.74 Kg=345.58 Kg) |
| 2 | Straight cross arm 100X50X6 mm, 9.56Kg/Mtr., each channel (GI) length 1.2 Mtr., 4 no's. channel (GI)required= (4X9.56X1.2) |
| 3 | Fish plate (GI) 50X6 mm, 2.36 Kg/ Mtr., each 0.280 Mtr. length, 16 no's required= (16X2.36X0.280) |
| 4 | Straight cross arm 100x50x6 mm, 9.56Kg/Mtr., each channel (GI) length 0.306 Mtr., 4 no's. channel (GI) required= (4X9.56X0.306) |
| 5 | Danger Plate, 1 no's |
| 6 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's =(1x0.59x0.510) |
| 7 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 8 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4no's = (4x0.59x0.510) |
| 9 | 11 KV pin insulator polymer |
| 10 | H W fitting (B&S) 70 KN, 3 Bolt |
| 11 | Disc insulator (B&S) 70 KN polymer |
| 12 | Earthig of support (Coil type) |
| 13 | No-8 GI wire (Dia 4.6 mm) 0.131 KG/ Mtr.-2 Mtr. For connecting pole with coil earthing |
| 14 | NON METALLIC TIES-11KV 100SQMM CVRD AAAC |
| 15 | IPC for 100 sq.mm AAA conductor (For covered conductor)-11 KV |
| 16 | Spike (GI) (using 50x6mm Flat (GI) welded with 8 mm square bar) 2 Nos of spike per set in each pole) |
| 17 | HT Stay clamp, 50X8 mm. flat 3.14Kg/ Mtr, 0.551 Mtr length 2 no's qty required (1 Pair) |
| 18 | HT Stay Set (Complete) |
| 19 | HT Stay Insulator Type-C |
| 20 | 7/10 SWG Stay Wire 15kg/ stay |
| 21 | GI Nut, Bolt & Washer of different sizes (7.433 Kg each Cut pole) |
| 22 | Black Paint(GIS Numbering & Zebra Stripping) |
| 23 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 24 | Contingency@3% of A |
| 25 | Tools & Plants@2% of A (Except HT Stay set) |
| 26 | Transportation @ 7.5% of A |
| 27 | Erection charges @ 5% on Trf//Breaker/ WPB/ H-Pole |
| 28 | Erection charges @ 10% of A (except Trf/Breaker/WPB/H-Pole/HT stay set/GI Pipe/PSC pole/GI Pipe earthing) |
| 29 | Civil and Services WorksFixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembły 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5) Stay clamps with Nuts & bolts BA will do the excavation including excavation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmX 500mmX 800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 30 | Concreting ratio 1:1.5:3 (M-20 Grade) (500mmX500mmX1800mm) =0.45Cum. (Per Pole) |
| 31 | Couping ratio 1:1.5:3 (M-20 Grade)with dimension ( 500X500X450)= 0.1125 Cum.(Per Pole) |
| 32 | MATERIALS FOR 11 KV Pin Points With WPB (Part-B)100 SQ.MM. AAAC XLPE Covered Conductor-1 kV |
| 33 | Contingency@3% of Sl no. 27 |
| 34 | Tools & Plants@2% of Sl no. 27 |
| 35 | Transportation @ 7.5% of Sl no. 27 |
| 36 | Erection charges @ 10% of H (except Trf/Breaker/WPB/H-Pole/HT stay set/PSC pole/ GI pipe earthing) |
| 37 | MATERIALS FOR PLINTH MOUNTED DSS (Part-C)WPB (GI) Pole 160X152 (11Mtr. Long, 30.44Kg/ Mtr.)-DP (Total Pole Weight with Base Plate & Stiffner= 334.84 Kg+10.74 Kg=345.58 Kg) |
| 38 | 9 Mtr. long 300 Kg. PSC Pole |
| 39 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 40 | EYE hook for XLPE Aeial bunched Cable |
| 41 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 42 | LT cable raising channel (GI) 75x40x4.8 mm GI channel (GI) (1000 mm long) (7.14 Kg/ Mtr, 6 No's) (Each 6x1x7.14= 42.84 Kg) |
| 43 | Top Channel Gl 100 X 50 X 6 mm. (3000 mm long) (9.56Kg/Mtr., 2 no's) (Each 2x3x9.56= 57.36 Kg) |
| 44 | Fish Plate 50x6 mm., 2.36 Kg/Mtr., each 0.280 Mtr. length, 6 no's required = (6x2.36x0.280) |
| 45 | M.U Channel GI 75x40x4.8 mm (3000 mm long)(7.14Kg./ Mtr., 2 no's) (Each 2x3x7.14 = 42.84 Kg) |
| 46 | AB Switch Mounting Channel (GI) 75x40x4.8 mm GI Channel (3000 mm long)(7.14Kg./Mtr., 2 nơ's) (Each 2x3x7.14 = 42.84 Kg) |
| 47 | AB Switch Side Şupport Channel 100X50X6 mm, 9.56 Kg/Mtr., each channel length 0.35 Mtr., 2 no's channel (GI) required =9.56x2x0.35) |
| 48 | Channel (GI) Support for down Pipe 75X40X4.8mm., 7.14Kg/Mtr., each channel length 0.8 Mtr., 1 no's channel required = (7.14x0.8x1) |
| 49 | HG/DO Fuse Mounting Channel (GI) 75x40x4.8 mm GI Channel (3000 mm long)(7.14Kg/Mtr., 2 no's) (Each 2x3x7.14= 42.84 Kg) |
| 50 | Cantilever Support Channel (GI) 75x40x4.8 mm GI Channel (810 mm long, 2 no's) (7.14Kg./Mtr., 2 no's) (Each 2x0.810x7.14= 11.57Kg) |
| 51 | Cantilever Support Angle (GI) 50x50x6 mm GI (1282 mm long) (4.5Kg./Mtr., 2 no's) (Each 2x1.282x4.5= 11.54Kg) |
| 52 | Double pole belting channel 75x40x4.8 mm., 7.14 Kg/Mtr., each channel length 3 Mtr., 2 no's channel required = (7.14x3x2) |
| 53 | 50x50x6 mm GI bracing angle (GI) , 4.5 Kg/ Mtr., each angle (GI) length 3.512 Mtr., 2 no's angle required = (4.5x3.512x2) |
| 54 | 50x6mm GI Flat for earthing, 2.36 Kg/Mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. for LA and 2.5 Mtr. for raising, 11 Mtr. for AB switch, 2.8 Mtr. for HG Fuse, 5x2 Mtr. for DTR Neutral, (1.3+4.5) Mtr. for DTR Body, 0.500 Mtr. for LTDB & AB Switch operating handle, 3 Mtr. for Fencing) (Each 65.6x2.36= 154.81 Kg) |
| 55 | 55 mm² All Alloy Aluminium Conductor (AAAC) XLPE covered conductor |
| 56 | 1 Cx400 mm² LT XLPE Cable(Un-Armoured) |
| 57 | LT Cable Supporting Channel(GI) 100 X 50 X 6 MM GI Channel(GI) (2000 mm long)(9.56 Kg./Mtr., 2 No's.) (Each 2x2x9.56= 28.56 Kg) |
| 58 | LT Cable Supproting Angle(GI), 50x50x6mm.GI 4.5Kg./mtr.,each Angle(GI) length 2 mtr., 4 nos Angle(GI) required =(4.5x4x2) |
| 59 | Supply of 1.1kV, 4Core, 150 sqmm, XLPE insulation armoured - Aluminium UG cable from LTDB to Pole |
| 60 | AB Switch(11KV, 200A, 3pole, 50Hz) |
| 61 | H.G.Fuse( 11KV, 200A, 3Pole) |
| 62 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 63 | POLYCARBONATE BIRD GUARD |
| 64 | Disc insulator (B&S)70 KN polymer |
| 65 | HW fiting (B&S)70KN(3 Bolted) |
| 66 | Lightning Arrester(12KV, 10KA) Station Class 2 |
| 67 | 11KV pin insulator polymer |
| 68 | HT Stay set complete |
| 69 | HT stay Clamp (1.9Kg/ Pair) |
| 70 | HT stay insulator TYPE-C |
| 71 | 7/10 SWG GI stay wire, Grade -2 (15Kg./ Set) |
| 72 | 40 mm Nominal bore Gl pipe (medium gauge) earthing device with 3 Mtr. long |
| 73 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 74 | GI Barbed wire/Anticlimbing device (3Kg/Pole) |
| 75 | Back Clamp for anticlimbing device 25x3 mm. flat (GI), 0.59Kg/ Mtr. Flat of 0.510 Mtr. length & 2 no's =(2x0.59x0.510) |
| 76 | Danger plate 11kv |
| 77 | Back Clamp for Danger plate 25x3 mm. flat, 0.59Kg/Mtr. Flat of 0.510 Mtr. length 2 no's=(2x0.59x0.510) |
| 78 | Name plate |
| 79 | Structure Numbering and Marking(i)Yellow Colour Paint for Backaround (GIS Numbering & Zebra Stripping) for Background |
| 80 | (ii)Black Colour Paint for numbering (GIS Numbering & Zebra Stripping) for Background |
| 81 | Contigency @ 3% of M |
| 82 | Tools & Plants@2% of M (Except Stay/Earthing/Cable) |
| 83 | Transportation @ 7.5% of M |
| 84 | Erection charges @ 5% on Trf/Breaker/WPB/H-Pole |
| 85 | Erection charges @ 10% of M (except Trf/Breaker/WPB/H-Pole/HT stay set/GI pipe/PSC pole/GI pie earthing)) |
| 86 | Erection charges @ 20% of PSC Pole |
| 87 | Civil and Services WorksConcreting ratio 1:1.5:3 (M-20 Grade) (500mmX500mmX1800mm) = 0.450Cum. (Per Pole) (For WPB Pole) |
| 88 | Couping ratio 1:1.5:3 (M-20 Grade) (500mmX500mmX450mm) = 0.113 Cum. (Per Pole) |
| 89 | PCC ration 1:3:6 (M-10 Grade) For DSS Area (3.5x3.5x0.1)= 1.225 Cum |
| 90 | Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6 (M-10 Grade) size (900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set, stay wire, stay nsulator. |
| 91 | Construction Earthing chamber including installation of earthing pipe. Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including installation of 3Mtr. GI Pipe 40mm/50mm including welding of GI flat around pipe. |
| 92 | LTDB Plinth |
| 93 | DTR Plinth upto 1000KVA |
| 94 | Laying of 4 C x 150 mm² LT XLPE Cable |
| 95 | Laying of 1.1 Kv cable from 400 to 1000 sqmm |
| 96 | SITC and Erection of GI Fencing with Gate |
| 97 | Concreting ratio 1:1.5:3 (M-20 Grade) (500mmX500mmX1500mm) = 0.375Cum. (Per Pole) (For PSC Pole) |
| 98 | Supply of AL Lugs suitable for 400 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 99 | Supply of AL Lugs suitable for 150 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 100 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 1C 300-1000 sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells. |
| 101 | Supply and erection of double Compression Flameproof Tyре Glanding for armored Cable 3.5/4C 120-185sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells. |
| 102 | ITC of 500KVA, 11/0.433V DT |
| 103 | ITC of OD LTDB for 500KVA TRF existing |
| 104 | Inspection Fee of Transformer (100 KVA to 1000 KVA) |
| 105 | Inspection Fee of LV Cable |
| 106 | Inspection Fee of Drawing Checking and Approval |
| 107 | MATERIALS FOR LT AB Cable Line(Part-D)9 Mtr. long 300 Kg. PSC Pole |
| 108 | LT Stay set Complete |
| 109 | 7/12 SWG GI stay wire, Grade -2 |
| 110 | LT stay Clamp ( 1.40Kg/ pair) |
| 111 | LT Stay insulator |
| 112 | LT Accessories with Eye hook and Clamp(i)Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 113 | (ii)EYE hook for XLPE Aerial bunched Cable. |
| 114 | (iii)Dead End Clamp suitable for messenger XLPE Aerial bunched Cable. |
| 115 | (iv)Suspension Clamp with EYE hook for ABC |
| 116 | Insulated piercing connector.Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm. |
| 117 | GI Pipe Earthing (each 5th pole to earth) |
| 118 | Coil Earthing |
| 119 | No-8 GI wire (Dia 4.6mm) 0.131 Kg/Mtr-2 Mtr. For connecting pole with Coil earthing |
| 120 | Danger plate (LT) |
| 121 | Back Clamp for danger Plate 25x3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 122 | GI barbed wire anticlimbing device 3 Kg. per support |
| 123 | Back Clamp for anticlimbing devíce 25x3 mm. flat, 0.59Kg/Mtr. flat of 0.510Mtr. length 4 no's = (4x0.59x0.510) |
| 124 | GI Nut. Bolt & Washer of different sizes (0.5 Kg/ Pole) |
| 125 | Black Paint (GIS Numbering & Zebra Stripping) |
| 126 | Yellow Colour Paint (GIS Numbering & Zebra Stripping) for Background |
| 127 | Contigency @ 3% of X |
| 128 | Tools & Plants@2% of X (Except LT Stay set/GI pipe Earthing) |
| 129 | Transportation @ 7.5% of X= |
| 130 | Erection Charges @ 10% of X (except Trf/Breaker/WPB/ H-Pole/LT Stay set/GI Pipe/ PSC Pole/GI Pipe earthing) = |
| 131 | Erection Charges @ 20% of PSC Pole Not to be used for 33 KV = |
| 132 | Civil and Services WorksFixing of LT complete stay set includes 1) Turn Buckle Assembły 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5) Stay clamps with Nuts & bolts BA will do the excavation including excavation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmX 500mmX 800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500) mm |
| 133 | Concreting ratio 1:1.5:3 (M-20 Grade) (500mmX500mmX1500mm) =0.375Cum. (Per Pole) |
| 134 | Construction Earthing chamber including installation of earthing pipe. Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe |
| 135 | Inspection Fee of Over Head Line (LV)-Rs. 375 upto 1 Km |
| 136 | Dismantling Material (Part-E)Dismantling of 09Mtr. Joist Pole- 116X100mm |
| 137 | Dismantling of 8 Mtr.Joist Pole (2nos from S/S + 1no fromline) |
| 138 | Dismantling of LT PSC Pole |
| 139 | Dismantling of existing 11/0.4kV, 33/0.4KV, 500kVA ThreePhase Distribution Transformer including removal ofHT/LT leads, earth connections and unloading by crane ifrequired. |
| 140 | Dismantling of ACSR/AAAC 80/100 mm2 from overheadline |
| 141 | Dismantling of LT AB Cable |
| 142 | Restringing of LT AB Cable |
| 143 | Dismantling of 11 kV /33KV GO/AB Switch/Isolator/DDfuse/fuse set |
| 144 | Dismantling of allaccesseries(Disc,pin insulator, v crossarm, danger board, steel structure of cut point from Singlepole structure at 9/10/11/13 Mtr |
| 145 | Dismantling of all accesseries(Disc,pin insulator, v crossarm, danger board, steel structure of cut point fromDouble pole structure at 9/10/11/13 Mtr Please Enable Macros to View BoQ information |