| 1 | Earth Work in correcting internal section of Raipur dy. from km 0.000 to km 24.400 by hydrraulic excavator (poclain/JCB) with side slop cutting at required slop including all lead & lift in all type of soil with proper disposal , compaction & dressing of bank and daula. As per direction of Engineer in charge. |
| 2 | Earth Work in Restoration of Raipur dy. From km. 0.000 to 24.400 with manual compaction and dressing i/c lift and total lead up to 360 m. by manual & donkey etc.proper completion of work as per direction of engineer in charge.( Right Bank & Daula ) |
| 3 | Earth Work in excavation of foundation in all type of soil including all lead,lift T&P etc. complete. As per direction of Engineer in charge. |
| 4 | Laying Plain Cement Concrete in 1:3:6 with maximum size of 40 mm crushed stone ballast & Coarse sand having F.M. not less than 2.0 including all cost of labour,materials,T&P etc. compaction required for proper completion of work. As per direction of Engineer in charge. |
| 5 | 1st class B/W in 1:4 C.M. Coarse sand having F.M. not less than 2.0 including all cost of labour,materials,T&P etc. compaction required for proper completion of work. As per direction of Engineer in charge. |
| 6 | Supply & Laying LDPE Film below C.C Lining including all cost of material,labour T&P etc. complete. As per direction of Engineer in charge. |
| 7 | Laying Plain Cement Concrete in 1:2:4 with maximum size 20 mm crushed stone ballast & Coarse sand having F.M. not less than 2.0 including all cost of labour,materials,T&P etc. compaction required for proper completion of work. As per direction of Engineer in charge. |
| 8 | Cement pointing 1:2 (struck deep ) C.M. including all cost of labour, materials, T&P etc. for proper completion of work. As per direction of Engineer in charge. |
| 9 | M-20 (1:1.5:3) with stone grite 10 to 20mm. Size, cement and course sand including cost of labour material etc. complete as per direction of Engineer in charge. |
| 10 | Cement Plastering 1:4 C.M. including all cost of labour,materials,T&P etc. for proper completion of work. As per direction of Engineer in charge. |
| 11 | Providing Steel Reinforcement and cutting bending, binding including all cost of labour material & T&P etc. As per direction of Engineer in charge. |
| 12 | Centering & Shuttering including cost of material, labour etc. complete as per direction of Engineer in charge. |
| 13 | Earth Work on Ramp approach and Road Diversion with material and labour etc. As per direction of Engineer in charge. |
| 14 | Ist class brick soling on edge both side i/c cost of Labour & T&P etc. complete. As per direction of Engineer in charge. |
| 15 | Supplying and Fixing 75mm. Dia P.V.C. pipe for weep holes & rain water including cost of labour material etc. As per direction of Engineer in charge. |
| 16 | Finishing side post and parapet with two coats of water proofing cement paint of approved make & quality of required shade on wall surface over one coat of white cement primer with preparation of surface i/c cost of material t&p etc. As per direction of Engineer in charge. |
| 17 | Painting two coat synthetic enamel paint including all material,labour T&P etc. complete. As per direction of Engineer in charge. |
| 18 | Earth Work in making canal section in all type of soil including all lead ,lift t&p etc. complete. As per direction of Engineer in charge. |
| 19 | Dewatering by hiring 5H.P. diesel pumps including operator & P.O.L. complete. As per direction of Engineer in charge |
| 20 | Supplying & fabrication and fixing of Mild steel/iron work in grill, gates, railing, door, window frames including cutting, drilling, welding, riveting and fixing hinges where necessary with fixing in position including cost of all material, labour, T&P etc. required for proper completion of work with one coat of red oxide primer. As per direction of Engineer in charge. |
| 21 | Providing and fixing 100 mm dia R.C.C. N.P.2 pipe including all cost of material, labour T&P etc. complete. As per direction of Engineer in charge. Please Enable Macros to View BoQ information |