| 1 | Earth Work in excavation of foundation in Lining, kulaba & box culvert all type of soil incluiding all lead, lift T&P etc complete. As per direction of Engineer in charge. |
| 2 | Earth Work in correcting internal section of Vishunpur dy. from km 0.000 to km 13.600 by hydraulic excavator (poclain/JCB) with side slop cutting at required slop including all lead & lift in all type of soil with proper disposal , compaction & dressing of bank and daula. As per direction of Engineer in charge. |
| 3 | Earth Work in Restoration of Daula of Vishunpur dy. From km. 0.000 to 13.600 with manual compaction and dressing i/c lift and total lead up to up to 360 m. by manual & donkey etc. proper completion of work. As per direction of engineer in charge. |
| 4 | Laying Plain Cement Concrete in 1:3:6 with upto 40 mm size crushed stone ballast & Coarse sand having F.M. not less than 2.0 in Lining & kulaba including all cost of labour,materials,T&P etc. compaction required for proper completion of work. As per direction of Engineer in charge. |
| 5 | 1st class B/W in 1:4 C.M.Coarse sand having F.M. not less than 2.0 , in lining,kulaba & vrb including all cost of labour,materials,T&P etc.required for proper completion of work. As per direction of Engineer in charge. |
| 6 | Laying Plain Cement Concrete in 1:2:4 with 4.75 to 10 mm size crushed stone ballast & Coarse sand having F.M. not less than 2,in kulaba including all cost of labour,materials,T&P etc. compaction required for proper completion of work. As per direction of Engineer in charge. |
| 7 | Plain Cement Concrete in M15 (1:2:4) Grade of Concrete with Cement, Coarse Sand & crushed stone grite (With maximum size of 20 mm) in lining & box including cost of all materials, labour and T&P with proper completion of work. As per direction of Engineer in charge. |
| 8 | Providing Laying and fixing of non pressure NP2 class (light duty) R.C.C. pipe (100 mm dia) with collar joints with stiff mixture of cement mortar in proportion of 1:2 (1cement:2fine sand) in kulaba incluiding testing of joints,materials and T&P etc. complete. including all cost of material,labour T&P etc. complete. As per direction of Engineer in charge. |
| 9 | 12 mm thick Plastering work in 1:4 CM. In kulaba including all cost of labour,materials, T&P etc. required for proper completion of work. As per direction of Engineer in charge. |
| 10 | Cement pointing 1:2 (struck deep ) C.M. in kulaba & vrb including all cost of labour,materials,T&P etc. required for proper completion of work. As per direction of Engineer in charge. |
| 11 | Earth Work in restoration of bank in all type of soil in kulaba including all lead,lift T&P etc. complete. As per direction of Engineer in charge. |
| 12 | Supply & Laying LDPE Film below C.C Lining including all cost of material,labour T&P etc. complete. As per direction of Engineer in charge. |
| 13 | Ist class brick soling on edge on Service road of Vishunpur dy. From km. 0.000 to 2.200, km. 7.500 to 8.000,km. 8.800 to 9.800 and km. 10.000 to 11.800 & box culvert incluiding preparation of sub-grade to prescribed camber, filling joints with earth and preparation of subgrade. As per direction of Engineer in charge. |
| 14 | Painting work on V.R.B. i/c cost of all lead, lift, labour & T&P etc. complete. As per direction of Engineer in charge. |
| 15 | Providing Steel Reinforcement and cutting bending, binding in box culvert & vrb including all cost of labour material & T&P etc. As per direction of Engineer in charge. |
| 16 | R.C.C. M-20 with stone grite 10 to 20mm. Size, cement and course sand in box culvert including cost of labour material etc. complete. As per direction of Engineer in charge. |
| 17 | Centering & Shuttering in box culvert including cost of material, labour etc. complete. As per direction of Engineer in charge. |
| 18 | Earth Work on Ramp approach and Road Diversion in box culvert with material and labour etc. As per direction of Engineer in charge. |
| 19 | Suppling and Fixing 63 mm. Dia P.V.C. pipe for weep holes & rain water in box culvert including cost of labour material etc.As per direction of Engineer in charge. |
| 20 | Dewatering by hiring 5H.P. diesel pumps in box culvert including operator & P.O.L. complete. As per direction of Engineer-in-charge. |
| 21 | P/Laying M-20 Grade conc. With maximum size of 20 mm stone grtt in wearing coat in box culvert & vrb including cost of material, labour etc. complete. As per direction of Engineer in charge. |
| 22 | Dismantling brick work, stone work in lime or cement mortar in box culvert & vrb including stacking of materials within a distance of 60 m. As per direction of Engineer in charge. |
| 23 | Dismantling cement concrete or brick or granolithic floor including base concrete in box culvert & vrb including stacking of dismantled materials within a distance of 60 m. As per direction of Engineer in charge. Please Enable Macros to View BoQ information |