|
| 1 | Hire charges includes transporatation at site within Muncipal Limits, Loading, Unloading, Placing and removing complete. |
| 2 | PVC chair 1st day |
| 3 | PVC chair 2nd day |
| 4 | Steel pipe pedded chair 1st day |
| 5 | Steel pipe pedded chair 2nd day |
| 6 | Wooden Table 6' x 3' (Babool) 1st day |
| 7 | Wooden Table 6' x 3' (Babool) 2nd day |
| 8 | Centre Table Glass Top 2'x4' 1st day |
| 9 | Centre Table Glass Top 2'x4' 2nd day |
| 10 | Non woven synthtic carpet (Red/Green) (New) 1st day |
| 11 | Non woven synthtic carpet (Red/Green) (New) 2nd day |
| 12 | Curtain cloth (View cutter ) made out of steel pipe frame with vertical height 12 feet covering with good quality white cloth to cut view including making holes and made necessary strengthening support against wind pressure complete . 1st day |
| 13 | Curtain cloth (View cutter ) made out of steel pipe frame with vertical height 12 feet covering with good quality white cloth to cut view including making holes and made necessary strengthening support against wind pressure complete . 2 st day |
| 14 | Speech Stand having Sunmica top. 1st day |
| 15 | Speech Stand having Sunmica top. 2nd day |
| 16 | white cotton cloth cover for padded chair inculding ribbon 1st day |
| 17 | white cotton cloth cover for padded chair inculding ribbon 2nd day |
| 18 | Hire charges for VIP Chair leather cushion 1st day |
| 19 | Hire charges for VIP Chair leather cushion 2nd day |
| 20 | Hire charges for Water Proof Tent with pipe pandal supported with Bamboo & Balli frame. 1st day |
| 21 | Hire charges for Water Proof Tent with pipe pandal supported with Bamboo & Balli frame. 2nd day |
| 22 | Hire charges for Deluxe sofa Three Seater 1st day |
| 23 | Hire charges for Deluxe sofa Three Seater 2nd day |
| 24 | Hire charges for Deluxe sofa Single Seater 1st day |
| 25 | Hire charges for Deluxe sofa Single Seater 2nd day |
| 26 | Chemical toilet with house keeping arrangement and providing liquid soap, tissues, comb, freshener etc. 1st day |
| 27 | Chemical toilet with house keeping arrangement and providing liquid soap, tissues, comb, freshener etc. 2nd day |
| 28 | Water proof dome with truss steel strcture, inner ceiling & curtains 90' span 1st day |
| 29 | Water proof dome with truss steel strcture, inner ceiling & curtains 90' span 2nd day |
| 30 | Aluminium German Hanger Tent Roof made up of Waterproof, Fire resistant Synthetic Rubber fabric of 885 GSM. 1st day |
| 31 | Aluminium German Hanger Tent Roof made up of Waterproof, Fire resistant Synthetic Rubber fabric of 885 GSM. 2nd day |
| 32 | Barricading with Sal ballies as per design including tying with vertical post by coconut strings including digging out holes in all types of soil complete in all respect with two horizontal members height 1.2 m upto 1.5m above ground level and vertical supports upto 2.5 centre and upto 3 days period including removal and cleaning the site complete in all respect & including dressing of sides and providing retro reflective tapes for traffic safety as per direction of Engineer-in charge in all types of soil. |
| 33 | Making of holes in cement concrete/ Bitumenous road by power driven hammer for barricating work as per direction of Engineer in charge |
| 34 | Add extra for hire charge for providing welded mesh size 25x25 mm (16SWG) over barricating (excluding hire charge of barricating) 1st Day |
| 35 | Add extra for hire charge for providing welded mesh size 25x25 mm (16SWG) over barricating (excluding hire charge of barricating) Subsequent days(per Day) |
| 36 | Total Estimated Cost of Construction (Part-A) |
| 37 | GST 18% on BOQ Amount as per FD Order No Dated 23.03.26 and CE PWD Rajasthan Jaipur Order No 21589477 Dated 15.04.26 |
| 38 | G Total Construction Part with GST Please Enable Macros to View BoQ information |