| 1 | Part-A:- Construction of 11/0.4 KV 500 KVA Sub-Station(Handed Over to TPSODL)=1 No - (160X152)mm 11Mtr Long WPB G.I pole |
| 2 | Earthing Device coil type |
| 3 | No-8 GI wire (Dia 4.6mm) 0.131KG/ Mtr- 2 Mtr for connecting pole with Coil earthing |
| 4 | Top Pressure GI Channel 100x50x6mm, 2.8 Mtr long 2 Nos (@9.2Kg/Mtr) |
| 5 | DP Stracture supporting GI channel 100x50x6mm each 2.8 mtr Long (@9.2Kg/Mtr)x4 Nos |
| 6 | Angle for cross bracing 50x50x6mm Angle(3.5mtrs. Long 2nos.) @4.5Kg/ mtr |
| 7 | AB Switch & HG fuse mounting channel 75X40X6 mm,2.8mtr.Long 4 Nos.(6.8Kg/mtr) |
| 8 | Cantilever GI channel for supporting AB switch arm, 75X40X6mm 1mtr Long 2 Nos. (6.8Kg/mtr) |
| 9 | Cantilever Angel for supporting AB switch 50X50X6mm Angle(2mtrs Long 2 Nos)@ (4.5Kg/mtr) |
| 10 | GI Angle for Mounting LT Distribution Box 50X50X6mm MS Angle-2.5 mtrs each Long 2 Nos. (4.5Kg/mtr) |
| 11 | 11KV Disc insulator (B& S) 70 KN, Polymer |
| 12 | 11KV HWfitting (B & S) 3 bolted bolted |
| 13 | 11KV AB Switch 3 Pole (400Amp) |
| 14 | Lighting Arrester (9KV, 10KA) |
| 15 | 11KV HG fuse 3 Pole, 400A |
| 16 | H.T Stay set (Complete) |
| 17 | H.T Stay Insulator |
| 18 | H.T Stay Clamp (1.95Kg/Mtr) |
| 19 | 7/10 SWG G.I stay wire |
| 20 | LT Distribution Box with MCCB, Alluminium busbar |
| 21 | 1Cx630 mmsq (Armoured) LT XLPE Cable(fromDTR to LTDB) 4nos 8mtr each RC Rate |
| 22 | 80mm2 A AAC |
| 23 | G.I Pipe Earthing 40mm Dia medium gauge 3mtr long for Earthing device for guarding ' ’ |
| 24 | 25x4mm GI Flat for (Neutral) and Body earthingof Metering Panel |
| 25 | 25x6mm GI flat for sub station earth |
| 26 | GI Nut,Bol & washer |
| 27 | Danger Board |
| 28 | G.I Barbed Wire anticlimbimg device 3. kg per support |
| 29 | Back Clamp for anticlimbing device 25x3mm.flat, 0.59Kg/Mtr, Flat of 0.510mtr length 4 Nos= (4x0.59x0.510) |
| 30 | Back Clamp for danger plate 25x3mm.flat, 0.59Kg/Mtr, Flat of 0.510mtr length 2 Nos= (2x0.59x0.510) |
| 31 | Black Paint |
| 32 | Yellow colour paint for back ground |
| 33 | Sundries (Binding wire, insulating Tape etc.) |
| 34 | Part-B:-Shifting of Old 11KV Conductor from old pole to existing pole with 02 Nos of cantilever arrengement-180 Mtr (03 span) with 01 No 13 Mtr WPB Pole (80 Mtr new AAAC and 180 mtr restringing of AAAC required) - 11 mtr long WPB pole (160X152)mm (30.44KG/Mtr.) with baseplate 300x300x12 |
| 35 | 9 Mtr 300 Kg PSC Pole stud |
| 36 | Earthing Device coil type (GI) |
| 37 | No-8 GI wire (Dia 4.6mm) 0.131KG/ Mtr- 2 Mtr for connecting pole with Coil earthing |
| 38 | 100x50x6 mm MS channel (9.2Kg/Mtr) with galvaniszation@ 1.5) Mtr long 2nos per pole (Pin point) |
| 39 | 50x50x6 mm MS Angel (4.5Kg/Mtr) with galvaniszation@ (2.25+2.25) Mtr long 2nos per pole (Pin point) |
| 40 | GI Back clamp for supporting in pole with channel (02 Nos) and 02 Nos for supporting angle 1.7Kg/each) |
| 41 | 11KV Pin insulator Polymer |
| 42 | 11KV Disc insulator (B& S) 45 KN, Polymer |
| 43 | 11KV HW fitting (B & S) (2 bolted) sl182 |
| 44 | 75x40x6 mm GI channel for straight Cross arm 3 Mtr long (4nos)@ 6.8Kg/Mtr for road cross guarding, Guarding 3 nos 1.5m*04 Nos |
| 45 | Eye hook for Guarding |
| 46 | No.6 G.I wire for (Dia-4.8mm) for 11KV line Guarding |
| 47 | G.I Pipe Earthing 40mm Dia medium gauge 3mtr long for Earthing device for guarding ' ’ |
| 48 | G.I flat (25x6)mm @1.2 Kg/Mtr |
| 49 | H.T Stay set (Complete) |
| 50 | 11KV stay insulator |
| 51 | H.T Stay clamp for PSC Pole/RJ Joist (GI) (1.9 Kg/Pair) |
| 52 | 7/10 SWG stay wire, Grade-2 |
| 53 | GI Nut,Bol & washer |
| 54 | 100mm2 AAAC Conductor |
| 55 | Danger Board |
| 56 | G.I Barbed Wire anticlimbimg device 3. kg per support |
| 57 | G.I Clamp for Danger Board GI Flat(25X3 &0.6 Kg/Mtr) 510 mm length(0.306 Kg/Piece) |
| 58 | G.I Clamp for anticlimbing device 25x3mm.flat, 0.6Kg/Mtr, Flat of 0.510mtr length =4 Nos/pole(1.22 Kg/Pole) |
| 59 | Eye hook for Guarding |
| 60 | PG Clamp for 100mm2 AAAC Conductor |
| 61 | Black Paint |
| 62 | Yellow colour paint for back ground |
| 63 | Sundries (Binding wire, insulating Tape etc.) |
| 64 | Part-C:- Estimate for Construction New OHLT Line with AB cable of Size (3x95+1x50+1x16) mm2 ABC-600 Mtr with 06 Nos of PSC Pole - 09 mtr long 300kg PSC pole |
| 65 | RCC Base plate for PSC pole |
| 66 | No-8 GI wire (Dia 4.6mm) 0.131KG/ Mtr- 2 Mtr for connecting pole with Coil earthing |
| 67 | Earthing Device coil type |
| 68 | Pole Clamp for Holding of supporting of Eye hook and Dead End Clamp |
| 69 | Suspension clamp with eye hook for ABC |
| 70 | Dead End Clamp |
| 71 | Neutral Connector |
| 72 | Piercing Connector Type-B Main |
| 73 | (3x95+1x50+1x16) mm2 LT XLPE AB Cable |
| 74 | Danger Board |
| 75 | G.I Barbed Wire anticlimbimg device 3. kg per support |
| 76 | Back Clamp for anticlimbing device 25x3mm.flat, 0.59Kg/Mtr, Flat of 0.510mtr length 4 Nos= (4x0.59x0.510) |
| 77 | Back Clamp for danger plate 25x3mm.flat, 0.59Kg/Mtr, Flat of 0.510mtr length 2 Nos= (2x0.59x0.510) |
| 78 | GI Nut,Bol & washer |
| 79 | Black Paint |
| 80 | Yellow colour paint for back ground |
| 81 | Sundries (Binding wire, insulating Tape etc.) |
| 82 | Civil Part - Boundary wall with sand filling and metal spreading, fixing of iron grill gate with locking arrengement etc as per TPSODL specification. |
| 83 | Civil cost for making TRF plinth for 500KVA Provide necessary civil material, Manpower, machinary for construction of plinth as per standard drawing |
| 84 | Re-errection of 500 KVA, 11/0.4 KV plinth mounted S/S |
| 85 | Re-stringing of AAAC |
| 86 | Couping with C.C.1:1.5:3, 0.1125 [email protected] |
| 87 | Concreting of poles in ratio 1:1.5:3,0.45 [email protected]/-for 11 Mtrs WPB Pole |
| 88 | Concreting of poles in ratio 1:1.5:3 for 11 Mtrs PSC Pole |
| 89 | Cement concreting for stay anchor plate with CC 1:2:4,0.2 [email protected]/- |
| 90 | Material for masonary ork for earth pit, Charcoal, Salt and RCC Slab cover. |
| 91 | Dismentaling of 500KVA, 11/0.4KV Iron framed mounted DSS |
| 92 | Dismantling Charges for HT Pole RSJ |
| 93 | Dismantling Charges for HT Pole PSC |
| 94 | Dismantling Charges for LT Pole RSJ |
| 95 | Dismantling Charges for LT Pole PSC |
| 96 | Dismantle of 11KV line (03-Span) |
| 97 | Dismantle of LT Line (05span) |
| 98 | Part-D:- Construction of 11KV OH Line with 160 Mtr AAAC Conductor & 11 Mtr WPB Pole 35 Nos- 01Km & 11KV OH Line with 50mm2 XLPE cable-0.02Km (Double CKT) - 13 mtr long WPB pole (160X152)mm (30.44KG/Mtr.) with baseplate 300x300x12 |
| 99 | Earthing Device coil type |
| 100 | No-8 GI wire (Dia 4.6mm) 0.131KG/ Mtr- 2 Mtr for connecting pole with Coil earthing |
| 101 | 100x50x6 mm MS channel (9.2Kg/Mtr) with galvaniszation@ 1.5 Mtr long 2nos per pole for cantiliver arrangement |
| 102 | 11KV Pin insulator Polymer |
| 103 | 11KV Disc insulator (B& S) 45 KN, Polymer |
| 104 | 11KV HW fitting (B & S) (2 bolted) sl182 |
| 105 | 100X50X6mm, GI Channel straight cross arm 03 Mtr long 04 [email protected] Kg/mtr for road crossing guarding, Guarding-03Nos 1.5m*04 Nos |
| 106 | Eye hook for Guarding |
| 107 | No-6 GI wire (Dia 4.8mm) for 11 KV line Guarding @40 Kg |
| 108 | G.I Pipe Earthing 40mm Dia medium gauge 3mtr long for guarding & XLPE Cable ' ’ |
| 109 | G.I flat (25x6)mm @1.2 Kg/Mtr |
| 110 | GI Nut,Bol & washer |
| 111 | Danger Board |
| 112 | G.I Barbed Wire anticlimbimg device 3. kg per support |
| 113 | G.I Pipe Earthing 40mm Dia medium gauge 3mtr long for tapping pole ' ’ |
| 114 | G.I flat (25x6)mm @1.2 Kg/Mtr |
| 115 | G.I Clamp for Danger Board GI Flat(25X3 &0.6 Kg/Mtr) 510 mm length(0.306 Kg/Piece) |
| 116 | G.I Clamp for anticlimbing device 25x3mm.flat, 0.6Kg/Mtr, Flat of 0.510mtr length =4 Nos/pole(1.22 Kg/Pole) |
| 117 | Black Paint |
| 118 | Yellow colour paint for back ground |
| 119 | Sundries (Binding wire, insulating Tape etc.) |
| 120 | Part-E:- Estimates for Construction of New OHLT Line of 160 Mtr with (3x95+1x70+1x16) mm2 AB Cable - Pole Clamp for Holding of supporting of Eye hook and Dead End Clamp |
| 121 | Suspension clamp with eye hook for ABC |
| 122 | Dead End Clamp |
| 123 | Neutral Connector |
| 124 | Piercing Connector Type-B Main |
| 125 | (3x95+1x50+1x16) mm2 LT XLPE AB Cable |
| 126 | GI Nut,Bol & washer |
| 127 | Sundries (Binding wire, insulating Tape etc.) |
| 128 | Re-errecttion charges for 3 core 400mm2 XLPE Cable |
| 129 | Couping with C.C.1:1.5:3, 0.1125 [email protected] |
| 130 | Concreting of poles in ratio 1:1.5:3,0.45 [email protected]/-for 11 Mtrs WPB Pole |
| 131 | Material for masonary ork for earth pit, Charcoal, Salt and RCC Slab cover. |
| 132 | Dismantling Charges for HT Pole RSJ |
| 133 | Dismantle of LT Line (05span) Please Enable Macros to View BoQ information |