| 1 | Clearing grass and removal of rubbish up to a distance of 50m out side the periphery of the area etc. complete as per the direction of the Engineer-in-charge. |
| 2 | Earth work excavation of foundation in hard soil or gravelly within 50m initial lead and 1.5m initial lift including dressing and levelling the bed with shoring, shuttering and dewatering if required etc completeand as per the direction of the Engineer-in-charge. |
| 3 | Filling the foundation & plinth with sand and well watered including cost, conveyance royalty of all materials etc. complete as directed by the Engineer-in-charge. |
| 4 | Cement concrete Grade M15 with 20mm down graded hard granite crusher broken chips of approved quality free from skin materials mixing by concrete mixer including hoisting lowering and laying the concrete in position to proper slope, level and compacting by vibrators in layers and finishing the exposed surface smooth including watering with cost, conveyance, hire and running charges of all machineries, royalty and other taxes of all T & P materials labour etc complete & as directed by the Engineer in Charge. from all deleterious materials from approved quarry including loading & unloading at site and mixing the concrete by concrete mixer or by manually and placing the same in form work to all height as per the drawing and compacting with concrete by vibrator or by manually to required thickness and watering for curing with all leads lifts and delifts including cost, carriage, royalty, cess, taxes of all materials, water etc. with all labour, T&P required with hire and running charges of concrete mixer and vibrator etc. complete & as per the specification and direction of the Engineer - in - Charge. |
| 5 | Providing, strengthening, cutting, bending, binding, fitting & placing uncoated HYSD bar reinforcement & laying in position including cost of binding wire 18mm to 20mm gauge & fixing of reinforcement ilcluding lapping (As per steel code) where necessary spot |
| 6 | R.C.C. work of M-25 grade with 20mm and down grade black hard granite (crusher broken) stone chips including hoisting and laying the concrete in position to proper slope, level and compacting by vibrators in layers and finishing the exposed surface smooth including watering with cost, conveyance, hire and running charges of all machineries, royalty and other taxes of all T & P materials labour etc complete & as directed by the Engineer in Charge. |
| 7 | Providing form work for concrete with F1 finishing using steel shutter plates of aproved specification for surfaces not porminently or permanently exposed to public view including supply of all materials. T & P labour and transportation of all materials ect. complete |
| 8 | Filling the foundation & plinth with excavated materials including watering and ramming, etc. complete as directed by the Engineer-in-charge. |
| 9 | Earth work in ordinary soil within the initial lead of 50m and initial lift of 1.5m including rough dressing and breaking the clouds to maximum 5cm to 7cm & laying in layers not exceeding 0.30m in depth & as per the direction of the Engineer-in-charge. |
| 10 | Inserting premoulded expansion joints including cleaning & including labour with cost of expansion joint materials. |
| 11 | Providing weep holes in Brick masonary/Plan/Rainforced Concrete abutment, wing wall/ Return wall with 50mm dia P.V.C. Pipe, extending through the full width of the strutures with slope of 1v:20H to-wards drawing face etc. complete as per drawing & technical spacification. |
| 12 | Providing good quality of moorum below CC lining work as CNS layer including ramming with cost, conveyance, royalty, taxes of all materials and labour charge etc. complete as direction of the Engineer-in-charge. |
| 13 | Providing and laying cement concrete of grade M15 with 20mm.down graded granite coarse aggregate for concrete lining to the bed and slopes of canal with sleeper beams, keys etc.in pannels including supply of all materials, labour and machineries compacting with space vibrator or manually and finishing the concrete surface including trimming and dressing of canal bed and slopes including cutting trenches for sleeper beam, keys and drainage etc.including watering and compaction of slopes and bed with hand rammers to proper profile and supplying and laying polythene film of 100 micron complete as directed by the Engineer-in-charge. Please Enable Macros to View BoQ information |