Name of Work:- AUGMENTATION OF CYBER SECURITY INFRASTRUCTURE AT HWP (KOTA).
Sl. No.
Item Description
1
Supply of 38x20 mm Casing ‘n’ capping made using virgin uPVC and ISI certified under IS 14927 Part II
2
Supply of 25x16 mm Casing ‘n’ capping made using virgin uPVC and ISI certified under IS 14927 Part II
3
Supply of Horn Cum Strobe Model-P1224MC (P2RL) with all accessories.Supply of PDU 5/15 Ampere Extension Board and Surge Protector | 12 Socket (6 Pin) for Networking & Server Rack with 2.5sqmm core conductor Power Cord and plug -3 mtr
4
Supply of PDU 5/15 Ampere Extension Board and Surge Protector | 6 Socket (6 Pin) for Networking & Server Rack with 2.5sqmm core conductor Power Cord and plug -3 mtr
5
Supply of 32 Amp Socket with MCB for Single phase 230V 50Hz supply based IEC C13 PDU
6
Supply of 15 Amp Socket with MCB for Single phase 230V 50Hz supply based IEC C13 PDU
7
Panel LED 5W, 90-300V 50HzAC, Size: 1 foot
8
Panel cubical FAN 4\\" size Aluminum Housing with Plastic Impeller, 230VAC, 0.1A, 18W, 2650 RPM
9
Panel Louver and Filter
10
Crimping tool for insulated and uninsulated ferrules; Crimping range: 0.25 to 4.0 mm²
11
Trench preparation for OFC laying in hard/soft soil and Road:a) Hard/ soft soil and Road digging / cutting up to 400mm depth and 400mm width.b) Laying of 100mm PCC layer.c) OFC cable laying after PCC.d) Concreting after OFC laying.e) Water curing after concreting.Concreting composition: 1 part of Cement, 2 parts of sand, 4 parts of aggregate shall be used for concrete. Supply of Cement, Sand, aggregate, Water and any other accessories for this job shall be in the scope of vendor
12
Laying of OS-2, 24 core single mode fiber optical armored cable as directed by EIC. These cables shall be laid in trenches, GI pipe, wall surface / ceiling and on structures etc by proper clamping and casing & capping arrangement as directed by EIC. Any material required for clamping and casing & capping of cable shall be in the scope of vendor.
13
Laying of UTP CAT6A Cable as directed by EIC. These cables shall be laid on wall surface / ceiling and on structures etc inside casing & capping arrangement as directed by EIC. Any material required for routing of cable shall be in the scope of vendor.
14
Installation of IO Boxes and termination of UTP cables in IO box as directed by EIC. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.