| 1 | Erection of structures including tightening and punching of nuts, bolts. |
| 2 | Erection of 132KV SF-6 Circuit Breaker (3 Phase) structures and alignment, shifting of breaker upto the place and placement of all 3 circuit breaker poles on structure and alignment. Complete assembly of circuit breaker including erection of control cabinet & mechanism box, interconnecting piping work, erection of all accessories for the equipment. SF-6 gas filling. Preliminary check, test including test for leakage of air/gas etc. |
| 3 | Shifting of 132 KV Current Transformer from Sub-station premises to Civil foundation and placement on structure and Erection of CT ,fixing of junction Box , including all accessories , making all jumpers etc. |
| 4 | Shifting of 132 KV isolators (3 phase) with earth switch upto civil foundation & placements of complete isolator in all 3 phase |
| 5 | Shifting of 132 KV surge/lightening arrestors & placement of equipments on structure including all accessories and making all c |
| 6 | Installation and erection of Control and Relay Panel for 132KV Feeder/X-mer/Bus Coupler in the Control-Room building |
| 7 | Erection of 132 KV Solid Core Insulators (PI) . |
| 8 | Erection of 33 KV Vacuum circuit breakers (3 Phase) structures and alignment, shifting of breaker upto the place and placement |
| 9 | Shifting of 33 KV Current Transformer upto civil foundation and placement on structure including all accessories etc |
| 10 | Shifting and placement of 33 KV isolator on structure and its earthing along with mounting of mechanism Box, interconnections piping, alignment of contacts & all accessories along with application of Petroleum Jelly on Jaws & Contracts. |
| 11 | Shifting of 33 KV surge/lightening arrestors & placement of equipments on structure including all accessories and making all co |
| 12 | Installation and erection of C&R Panel for 33KV Feeder/X-mer/Bus coupler in the Control-Room building which includes Shifting up |
| 13 | Erection of junction box |
| 14 | Laying of cables 2 Core x 2.5 Sq.mm on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables |
| 15 | Laying of cables 4 Core x 2.5 Sq.mm on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables |
| 16 | Laying of cables 8 Core x 2.5 Sq.mm on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables |
| 17 | Laying of cables 12 Core x 2.5 Sq.mm on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables |
| 18 | Laying of cables 19 Core x 2.5 Sq.mm on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables |
| 19 | Cable terminations consisting the work of providing holes for cable entry, fixing of cable glands, lugs etc. for 2 Core x 2.5 Sq.mm control / Power cables, including terminations at both end |
| 20 | Cable terminations consisting the work of providing holes for cable entry, fixing of cable glands, lugs etc. for 4 Core x 2.5 Sq.mm control / Power cables, including terminations at both end |
| 21 | Cable terminations consisting the work of providing holes for cable entry, fixing of cable glands, lugs etc. for 8 Core x 2.5 Sq.mm control / Power cables, including terminations at both end |
| 22 | Cable terminations consisting the work of providing holes for cable entry, fixing of cable glands, lugs etc. for 12 Core x 2.5 Sq.mm control / Power cables, including terminations at both end |
| 23 | Cable terminations consisting the work of providing holes for cable entry, fixing of cable glands, lugs etc. for 19 Core x 2.5 Sq.mm control / Power cables, including terminations at both end |
| 24 | Laying of Flat (50 mm x 6 mm ) duly buried at a depth of 0.5 mtr. providing or risers for structures earthing including back filling welding etc. structure earthing of following length. |
| 25 | Laying of Flat (65 mm x 8 mm ) duly buried at a depth of 0.5 mtr. providing or risers for structures earthing including back filling welding etc. structure earthing of following length. |
| 26 | 25 mm dia X 3000 mm long M.S. rod earth electrodes installation directly driven/drilled (40 to 50 mm dia) into earth including e |
| 27 | Preparation of earthing Pits (1.5x1.5x3M) as per drawing |
| 28 | Stringing of over head gantries vertical droppers with ACSR conductor including fixing of insulator string spares, clamps etc. (Single Zebra Conductor). |
| 29 | Stringing of over head gantries vertical droppers with ACSR conductor including fixing of insulator string spares, clamps etc. (Twin Zebra Conductor). |
| 30 | Stringing of overhead shield wire with 7/3.66 mm standard galvanised steel complete with fixing of strain clamps at the struc Please Enable Macros to View BoQ information |