| 1 | R.C.C. in 1:1.5:3 with (1 cement: 1.5 coarse sand: 3 stone grit 10 mm to 20 mm) M20 Grade with proper mixing, placing, mechanical compaction and curing including cost of all material, labour, T&P etc. and lead up to 60m and lift up to 3.0m by Mechanical mixing as per direction of Engineer-in-Charge. |
| 2 | Providing and laying Cement concrete (1:3:6) with cement , coarse sand, 40mm nominal size crushed stone grit including cost of all material, labour and T&P etc.complete. |
| 3 | Centering & Shuttering for R.C.C. work including cost of all materials For VRB slab up to 3 m span. |
| 4 | Supplying and placing of Reinforcement in position including cutting, bending, binding (with 16 SWG binding wire) and including labour, tools & plants, carriage, loading unloading and stacking of all materials at site for proper completion of works at all respect. |
| 5 | Hiring of diesel pumps 5HP including operator and POL. |
| 6 | Writing letter including materials above 80 mm size. |
| 7 | Laying brick soling layer on prepared sub-grade with brick on and edging accoording to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolling the same with three wheel road roller 80-100 KN as per Technical Specification Clause 412. |
| 8 | Supply and laying one layer of tarfelt or any other equivalent approved material at the junction of wall and roof or at any place as per direction of Engineer-in-Charge including necessary overlap, giving a coat of approved plastic paint below the tarfelt including supply of all materials, and T&P required for proper completion of the work |
| 9 | Pre-Moulded Joint Filler 25mm thick for expansion joint |
| 10 | Supplying and Fixing of Wheelguard Stone RCC size 1x0.23X0.23 Meter incl. all cost of material labor & T&P. |
| 11 | Dismantling brick work, stone work in lime or cement mortar including stacking of materials as directed by engineer in-charge within a distance of 60 m. |
| 12 | Dismantling reinforced cement concrete 1:2:4 including stacking of dismantled materials as directed by Engineer-in-charge within a distance of 60m. |
| 13 | Laying soling coat with kankar/brick ballast consolidation by hand ramming including opening out stacks, sorting kankar into size, repairing patch of road surface with kankar, plucking up old surface, spreading kankar, making medhi to retain water ramming and carriage of material up to 30 m Carriage of water 200 M. and maintenance of barriers caution post light at night including all T&P etc. required for proper completion or work excluding cost of kankar. |
| 14 | Brick work in 1:4 cement mortar up to 3m lift and 30m lead of material with cement , coarse sand , and M-150 bricks . including cost of all material, labour and T&P etc.complete. |
| 15 | Struck deep pointing in 1:2 on brick masonry ,cement , fine sand including cost of all material, labour and T&P etc. complete. |
| 16 | Finishing wall in two coat with water proofing cement paint of premium quality such as super snowcem, durocem, supercem, of required shade on new wall surface over one coat of white cement primer to give an even shade after incl. curing and cost of all materials. |
| 17 | Excavation of foundation in ordinary soil/sandy loam, clay or sand including lift up to 1.5 meter and lead up to 30 meter including filling, watering, ramming of excavated earth into the foundation trenches or plinth or upto the place directed by engineer in charge. Dry Earth work in foundation |
| 18 | Uprooting of Behya/ Sarpat/ Gondi/ elephanta grass and other weed and its disposal. |
| 19 | Preparation of sub grade for lining works excluding cost of earth work |
| 20 | Providing and laying in position Cement concrete (1:2:4) with cement, coarse sand and 20mm nominal size stone grit including cost of all material, labour and T&P etc. complete. |
| 21 | Providing and filling local sand for sub base including cost of all material, labour and T&P etc. complete. |
| 22 | 12 mm thick cement plaster in 1:4 cement fine sand including cost of all material, labour and T&P etc. complete. |
| 23 | Supply of LDPE Film 200 micron of 1st grade including all taxes and contractor profit confirming to IS Code 2508-1984 Reaffirmed to 2003 |
| 24 | Painting on Top of sleeper with (Bitumen vg-10) grade @ 1.20 kg /sqm including cost of all material, labour and T&P etc. complete. |
| 25 | Providing and laying 60mm thick C.C., (1:2:4) in Lining with centering and shuttering, including cost of all material ,labour and T&P etc. complete. |
| 26 | Making contraction groove in lined concrete surface as per drawing ,including painting with sealing primer and joint groove filling with sealing compound, including cost of all material ,labour and T&P etc. complete. |
| 27 | Making construction joint in lined concrete surface as per drawing ,including painting with sealing primer and joint filling with sealing compound, including cost of all material ,labour and T&P etc. complete. |
| 28 | Providing, laying jointing & fild testing of High Density polyethylene pipes (HDPE) PE100 PN6 confirming to IS 4984/14151/12786/13488 with necessary jointing of pipes by electo fision / butt welding process with all leads and lift etc complete. 75 mm dia HDPE pipe |
| 29 | Providing, laying jointing & fild testing of High Density polyethylene pipes (HDPE) PE100 PN6 confirming to IS 4984/14151/12786/13488 with necessary jointing of pipes by electo fision / butt welding process with all leads and lift etc complete. 110 mm dia HDPE pipe |
| 30 | Providing, laying jointing & fild testing of High Density polyethylene pipes (HDPE) PE100 PN6 confirming to IS 4984/14151/12786/13488 with necessary jointing of pipes by electo fision / butt welding process with all leads and lift etc complete. 125 mm dia HDPE pipe |
| 31 | Providing, laying jointing & fild testing of High Density polyethylene pipes (HDPE) PE100 PN6 confirming to IS 4984/14151/12786/13488 with necessary jointing of pipes by electo fision / butt welding process with all leads and lift etc complete. 160 mm dia HDPE pipe |
| 32 | Earth work in making Road Diversion /M3 |
| 33 | Earth work in removal Road Diversion /M3 |
| 34 | Supplying & Fixing of NP2- R.C.C Hume pipe 900mm dia in road diversion.(per RM) |
| 35 | Removal of 900 mm Dia NP-2 R.C.C hume pipe from Road Diversion |
| 36 | Centering and shuttering for CC work including cost of all material labour and T&P etc. complete. |
| 37 | Providing and laying Cement concrete (1:1:2) with cement , coarse sand , and 10 mm nominal size stone grit including cost of all material, labour and T&P etc.complete. |
| 38 | Supplying & fabrication and fixing of mild steel/ iron work grill, gates ,railling including cutting ,drilling ,welding riveting and fixing ,where necessary with fixing in position including cost of all materials, labour, tools and plants etc. required for proper completion of work. |
| 39 | Erection and fixing of trusses and other steel structures including carriage within 30 M. |
| 40 | Providing and fixing of spindle rod 50mm dia of EN-8 heigh carbon steel including cost of all material, labour and T&P etc.complete. |
| 41 | Providing and fixing of thrust bearing for steel gate including cost of all material, labour and T&P etc.complete. |
| 42 | Glands /sleeves/chuck nut/ journal bearing without white metal including all labour,T&P etc.complete.Bronze IS : 318 Gr. 2 Spares |
| 43 | Threading and turning of 50 mm dia spindle rod including all labour,T&P etc.complete. |
| 44 | Suppllying and fixing GI pipe 80 mm dia including cost of all material, labour and T&P etc.complete. |
| 45 | Providing and fixing cap pipe hook (locking system) by 80mm dia G.I. Pipe including cost of all material, labour and T&P etc.complete. |
| 46 | Supplying and fabrication of handle with 1\\" shaft including cost of all material, labour and T&P etc.complete. |
| 47 | Oiling and Greasing steel regulator gate including cost of all material, labour and T&P etc.complete. |
| 48 | Painting of steel regulator gate including cost of all material, labour and T&P etc.complete. |
| 49 | Carriage from workshop to site including cost of all material, labour and T&P etc.complete.(Hiring of Tractor 35 H.P and above with driver and P.O.L. with trolley.(Rs. 250 per hour maximum Rs. 2000/Day) |
| 50 | Earth work in strengthening bank of canal in filling on rain cuts, animal cuts and potholes by hydraulic excavator (Poclain/JCB ) including proper compaction in layers and dressing with initial lead 15 m and lift of 5 m each in all type of soil as directed by site in charge. |
| 51 | Levelling, dressing of service road. Please Enable Macros to View BoQ information |