| 1 | BOQ FOR CONSTRUCTION OF HT LINE AND 11/0.4 KV S/S UNDER ELECTRICITY DISTRIBUTION DIVISION, SIDCUL, HARIDWAR IN DEPOSIT HEAD AGAINST E-TENDER NO- 20/EDC(H)/2026-27 Bidder's Name & Address S.N. Work Unit Qty. Rate Amount (In Rs.) A Decentrlized Material |
| 2 | Bracing Clamp Top SP-55 with N/B |
| 3 | Bracing Clamp Bottom SP-55 with N/B |
| 4 | Earth Wire Clamp for SP-55 with N/B |
| 5 | Stay Clamp for SP-55 with Nut & Bolt |
| 6 | Stay Insulator 100x115 |
| 7 | G.I Strip 35x5mm |
| 8 | Danger Board with Clamp N&B |
| 9 | Bolt & Nuts off size |
| 10 | Stay Clamp for SP-55 with Nut & Bolt |
| 11 | IPC with aluminium bail for earthing |
| 12 | 11 KV IPC for Covered to Covered Conductor |
| 13 | 11 KV IPC for Covered to Bare Conductor |
| 14 | 11 KV Mid Span Jointing Kit |
| 15 | 11 KV Sus. Ties/Cable Ties on Pin Insulator |
| 16 | 11 KV AAAC Covered Cond. AL-59, 99 Sq.mm |
| 17 | LT ACB Out Door 400A |
| 18 | Al. Lug Long Barrel 630 Sq.mm |
| 19 | 11 KV Tension Clamp with Bail & IPC Total (A) 0.0 B LABOUR |
| 20 | Chemical Earthing |
| 21 | Fabrication of steel |
| 22 | Excavation of Pit for Stay Set |
| 23 | Erection of 11 KV Stay Set |
| 24 | Grouting of Stay Set |
| 25 | Excavation of Pit for Pole |
| 26 | Erection of Single SP-55 Pole |
| 27 | Erection of SP-55 Double Pole |
| 28 | Grouting of Pole |
| 29 | Muffing of Pole |
| 30 | Painting of SP-55 Pole |
| 31 | Excavation of Earth for DTR Plinth |
| 32 | Cement Concreting work DTR Plinth |
| 33 | Brick work in 1:4 Ratio DTR Plinth |
| 34 | RR Massonary work for DTR Plinth |
| 35 | RCC Work of DTR Plinth |
| 36 | Cement Plaster on DTR Plinth |
| 37 | Fencing of DTR |
| 38 | Inst. Of 400/500 KVA DTR on Plinth |
| 39 | Fixing of Fuse Set |
| 40 | Fixing of Lightning Arrestor |
| 41 | Fixingh of LT Fuse Set |
| 42 | T-off connection complete 11 KV Line |
| 43 | Cartage SP-55 Pole, 0-20 KM |
| 44 | Cartage of Petty Material, 0-20 Km |
| 45 | Cartage of 400/500 KVA DTR, 0-20 KM |
| 46 | Headload Cartage SP-55 Pole (0-1 KM) |
| 47 | Headload Cartage of Material (0-1 KM) |
| 48 | Headload Cartage of 400 KVA DTR (1-3 Km) |
| 49 | Laying & Fixing LT XLPE Cable |
| 50 | Fixing of IPC with AL. Bail for Earthing |
| 51 | Jumpering of D/P TPMO, Fue Set and T/F |
| 52 | Earthing of ACB |
| 53 | Installaton of ACB LT Distribution Box |
| 54 | Jumper Section Pole |
| 55 | Fixing of 11 KV 90KN Tension Clamp B&IPC |
| 56 | Fixing of 11 KV Suspension Ties |
| 57 | Fixing of 11 KV Mid Span Jointing Kit |
| 58 | Fixing of 11 KV IPC for Covered - Covered |
| 59 | Fixing of 11 KV IPC Covered to Bare Conductor |
| 60 | Fixing of PP & Clamp with N&B for SP-55 |
| 61 | Fixing of Disc Ins. for AAAC Conductor |
| 62 | Fixing of 11 KV Pin Insulator |
| 63 | Laying Spreading, Stringing AAAC Conduct. |
| 64 | Erection of Stay Clamp |
| 65 | AMC of ACB 1st Year (5% Value of ACB) Total (B) 0.0 Total (A+B) 0.0 Note :- GST will be paid extra as actuals. Company/Firm Name Name Designation Date |