| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge.a) upto 3 m depth(i) With pumping out water including shoring as required. |
| 2 | Earthwork in filling in foundation trenches with good earth in layers not exceeding 15cm. including watering and ramming layer by layer complete with earth obtained from excavation of foundation or from fresh excavation of land arranged by Department within a lead of 150 m. |
| 3 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof. |
| 4 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.In ground floor including roof. (b) above 150 mm. thick |
| 5 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. |
| 6 | Filling in foundation or plinthby silver sand in layers not exceeding 150 mm as directed and consolidating the sameby thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) |
| 7 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. i) Pakur variety |
| 8 | First class Brick work in cement san,t rnortar in steining of well, pier, abutmenl wing wall, parapets cross drain. H.P. culverts, guard wall etc. including curing, scaffolding, raking out jgints etc. complete including cost and carriage of all materials. (A) In 1:4 proportion (a) In foundation and plinth |
| 9 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar(a) 20 mm thick plaster |
| 10 | Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m. |
| 11 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m(i) Tor steel / Mild SteelI. SAIL / TATA / RINL |
| 12 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)(f) 25 mm to 30 mm shuttering without staging in foundation |
| 13 | Fabrication , Supply, erection and commissioning of new Slide type vertical lift regulator service gates of Canal/River as per IS: 5620 - 2000/Latest Revision consisting of skin plate, vertical and horizantal grider, stiffener etc. made of MS material consisting of angle , channel, beam, plate, flat, etc. conforming to IS : 2062 -2011/latest revision manufactured as per approved drawing and direction including cost of Materials, Machinaries , Manpower, Cutting, ligning, drilling, Welding, Finishing, Consumables, Carriages and all overheads with all leads and lifts complete as per specification (without painting). i) Width of Gate shuteer size upto 2 metre |
| 14 | Item no. 5.1.F-10 Page-87 of USoR (Mech & Elect.)Supplying, fitting & fixing of screw rod having square thread of 1.5/2 T.P.I, Material bright steel [EN‐8/EN9/forged Cl‐4 (45C8) as per IS :1875 1992/latest Revision]. dia and threadlength as required and providing with a drilled hole of required dia on the other end after flattened and supplying with one no. bolt and nut of required size and all other components as required as per direction of Engineer‐In ‐ Charge. The cost includes cost of material, man power employed, consumables like cutting tools, emery paper, cloths, , hire charges of machineries, tools & tackles, grease, mobil etc including carriage loading & unloading as per direction of Engineer in charge. a) upto length 3 metre. |
| 15 | Supplying, fitting & fixing of C.I wheel in the screw hoisting system for lifting or lowering the draw shutter.The wheel consisting of suitable size hub to accomodate any size of G.M/C.I nut, rim dia 32mm and four nos arm made of minor dia 30mm. & major dia 36mm rod complete or as per approved drawing & direction of the Engineer‐in‐charge.The cost includes cost of materials, man power employed for dismantling and fitting fixing, consumables like cutting tools, welding rod, hire charges of machineries, like lathe machine,grinding machine ,tools & tackles etc including carriage loading & unloading.(a) Upto 60 cm. dia. Cast Iron wheel |
| 16 | Supplying, fifling & fixing of M.S fabricated pedestal stool of suitable size, consisting of bottom plate, top plate, four nos legs etc febricated with suitable sizes m.s plate, m.s angle conforming to I.S 2062 of latest revision and as per approved drawing & direction of Engineer in charge. The cost includes cost of materials, man power employed for dismantling and fitting fixing, civil works consumables like cutting tools, gas, oxygen, welding rod, anchor bolt of required size, hire charges of machineries, like gas cutting set, welding set, tools & tackles etc including carriage loading & unloading. |
| 17 | Supply, installation, testing and commisioning of following items for hoisting system and gear box as mentioned below as per direction including cost of Materials, Machinaries , Manpower, Cutting, Machining, ligning, nchoring, Welding, Finishing, Consumables, Carriage and all overheads with all leads and lifts complete as per specification (without painting)(xvi) Bush(GM) |
| 18 | Fabrication , supply, erection and commissioning of embeded parts consisting of seal beam, Guide channel with all accessories for vertical gate of distributories/branch canal/minor canal/channel made of MS material consisting of angle, channel, beam, plate, flat, etc. conforming to IS : 2062 -2011/latest revision manufactured as per approved drawing and direction of Engineer in charge. The Cost includes cost of Materials, hire charges of Machinaries , Manpower, Cutting, ligning, nchoring, Welding, Finishing, Consumables, Carriage and all overheads with all leads and lifts complete as per specification (without painting). |
| 19 | Supplying, dressing and stacking at site bamboo pins above 5 cm. dia. and upto 7.5 cm. dia.(Dia to be measured at mid length). |
| 20 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances. (a) Where boats are not necessary |
| 21 | Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) |
| 22 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). |
| 23 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags, (tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. |
| 24 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. |
| 25 | Extra rate for item no 24 above for each additional lead of 60 metre or part thereof beyond the initial lead of 30 metre.(i) Two Extra Lead (2 x 3.00) |
| 26 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any othermechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, after deduction of void as per norms. No extra payment will be made for stacking .NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement B) Beyond 500 m and upto 1.00 km |
| 27 | Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc.complete as per direction of the Engineer-in-charge.(a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil. |
| 28 | Taking out old bamboo pins from piling and stacking the same within 150 metre from the site of work. (a) Where boats are not necessary. |
| 29 | Taking out bamboo wailing pieces after removing iron nails and stacking the same within 150 metre from the site of work. (a) Where boats are not necessary. |
| 30 | Removing earth/sand filled poly bags/gunny bags from the channel bed/slope and initially depositing the same near channel bank at a place as directed by the Engineer-in Charge for measurement of Bag. & then disposing off the same at a distance not less than 150 metre from the channel site. |
| 31 | Supplying, fitting and fixing at site Cast Iron flap shutter for hume pipe sluice with Cast Iron collar and other fittings etc. complete (as per drawing & direction of Engineer-in-charge)including casting the same, necessary drilling etc with carriage to site complete. The Cost includes cost of Materials, Machinaries , Manpower, Cutting, ligning, drilling, Welding, Finishing, Consumables, Carriages and all overheads with all leads and lifts complete as per specification (without painting). Please Enable Macros to View BoQ information |