| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved aterial complete as per direction of the Engineer-in-ChargeI. In all sorts of soil excluding marshy soil & rocks(soft or hard) by manual means.a) upto 3 m depth(i) Without pumping out water and shoring |
| 2 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification.A) Granular materialUsing brick bats and fine sand (Grading Zone III as per IS:383:1970) in proportion 60:40 |
| 3 | Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge. Using fine sand (Grading Zone III as per IS: 383:1970) |
| 4 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. |
| 5 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in-charge for foundation excavation (vertical surface are incontact with supported earth is tobemeasured.) (This item should be executed on specific direction of the Enginner in charge)(a) For additional depth beyond 1.5 m. and upto 3.00 m |
| 6 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)(f) 25 mm to 30 mm shuttering without staging in foundation |
| 7 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. |
| 8 | Plain / Reinforced Cement Concrete in Open foundation with or without reinforcements, in any part of foundation of bridges / culverts with graded stone chips of appropriate nominal sizes, including screening and cleaning of coarse aggregates, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, cost of curing with water, including cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control, sampling, testing etc. including cost of formwork but excluding reinforcement complete as per drawing and technical specifications. Note : 1. From durability consideration, the value of minimum cement content and maximum water cement ratio to be considered in the mix design shall be as per the direction of the Engineer-in Charge.2.During the execution of the item necesarry quantity of approved plasticizers to obtain the designed workability and stength is to be added,cost of which has been incorporated in the rate of the item.A) RCC Grade M25( I) Using concrete mixer Cement : PPC / PSC / OPC 33 |
| 9 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground flooras per relevant IS codesa) Pakur Variety Cement: PPC/PSC/OPC33 |
| 10 | Plain / Reinforced Cement Concrete in Substructure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality, cement and water reducing admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form work and staging complete as per drawing and technical specifications.Note : 1. From durability consideration, the value of minimum cement content and maximum water cement ratio to be considered in the mix design shall be as per the direction of the Engineer-in Charge.2.During the execution of the item necesarry quantity of approved plasticizers to obtain the designed workability and stength is to be added,cost of which has been incorporated in the rate of the item. RCC Grade M25 (i) Height upto 5mI) Using concrete Mixer Cement : PPC / PSC / OPC 33 |
| 11 | Furnishing and Placing Reinforced / Pre-stressed Cement concrete in Super-structure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement and admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical pecification including the cost of necessary form work and staging complete. as per drawing and technical specifications.1) From durability consideration, the value of minimum cement content and maximum water cement ratio to be considered in the mix design shall be as per the direction of the Engineer-inCharge 2)During the exeution of the item necesarry quantity of approved plasticizers to obtain the designed workability and stength is to be added,cost of which has been incorporated in the rate of the item.A) RCC Grade M25I. Using Concrete Mixer (i) For solid slab super-structure,a) Height upto 5m Cement: PPC/PSC/OPC33 |
| 12 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.a) Pakur Variety Cement: PPC/PSC/ OPC33 |
| 13 | Supplying, fitting and placing HYSD bar reinforcement in Sub-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading,carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-charge.2(ii)a. Steel materials :Tor Steel rods/HYSD bars/TMT bars (SAIL/TATA/RINL)(Fe 415 /Fe 500 /Fe 500D Conform to IS:1786) |
| 14 | Supplying, fitting and placing HYSD bar reinforcement in Bridge Super-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications.2(ii)a. Steel materials :Tor Steel rods/HYSD bars/TMT bars (SAIL/TATA/RINL)(Fe 415 /Fe 500 /Fe 500D Conform to IS:1786) |
| 15 | Providing and laying Cement concrete Wearing coat M-30 grade with graded stone chips 19mm down including screening and cleaning approved stone chips and sand as necessary laying, finishing complete to camber and grade, curing with water, including cost and carriage of all materials and hire charges for form work including reinforcement complete as per drawing and Technical Specifications vide clause no. 2702 of MoRT&H’s Specification for Road & Bridge Works. |
| 16 | Providing and laying of an elastomeric slab seal expansion joint, catering to right or skew (less than 20 deg., moderately curved with maximum horizontal movement upto 50 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation and as per Clause 2605 of Specifications for Road & Bridge works of MoRT&H (5th Revision). (a) For movement up to ± 25 mm - Type : m 50 |
| 17 | Drainage Spouts in Superstructure including providing drip mouldings and also including supplying, fitting and fixing approved type of materials complete as per drawing and Technical specification vide clause no. 2705 of MoRT&H’s Specification for Road & Bridge Works. |
| 18 | Epoxy bonding of new concrete to old concrete |
| 19 | Supplying, fitting and placing un-coated HYSD bar reinforcement in Bridge Foundation including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-charge. 2(ii)a. Steel materials :Tor Steel rods/HYSD bars/TMT bars (SAIL/TATA/RINL)(Fe 415 /Fe 500 /Fe 500D Conform to IS:1786) |
| 20 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : A) On timber or plastered surface(a) With super gloss (Hi-gloss)(i) Two Coats (With any shade except white) |
| 21 | Supplying fitting and fixing R.C. guard post 1.37m long with C.C. 1:2:4 with graded stone chips of 13.2mm down casting , curing complete including cost of providing 4nos.of 12mm dia. rod of length 1.54m as main reinforcement and 6 nos. of round shaped 8mm dia rods used as binders; the placing of the first binder should be at 75mm below the top finished surface and the other 5 nos of binders should be placed at 245mm c/c ; the guard post is of octagonal section with inscribed circle of dia 24cm at the base tapering to corresponding dimensions of 16cm at the top including two coats of painting with best quality synthetic enamel paint of approved make and grade to form 6 nos. horizontal alternate bands in white/tannery yellow and black to 90 cm length standing up above ground after mendinggood damages if any during striking off shuttering, making hole in ground of 47cm depth and 30cm. minimum dia, fixing the guard posts in the same holes and repacking the earth properly so as to keep the guard posts standing properly erect in correct position true to line and length including carriage of R. C. Guard Post with due care to the site including loading into the truck and unloading at site complete in all respect. With Pakur variety stone chips |
| 22 | Providing weep holes in Brick masonry / Plain /Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the tructure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications. |
| 23 | Labour for fitting and fixing high density poly-ethylene pipes or P.V.C. pipes for above ground work including cost of jointing materials paints etc. fitting and fixing all necessary specials, cutting pipes, making threads, cutting holes in walls or R.C. floor where necessary and mending good all damages excluding the cost of masonry or concrete work, if necessary, but including the cost and fitting and fixing holder bat clamps(any floor) or for underground work including cutting trenches upto 1.5 metre and refilling the same complete as per direction of the Engineer-in-charge.(Payment will be made on centre line measurement of the total pipeline including specials.) (A) Above Ground (i) 160 mm dia. |
| 24 | Bailing or pumping out water from foundation trenchesThis item should be executed on the specific direction of the Engineer-in-charges when he is satisfied in his absolute discretion, that this has not been necessitated due to any fault on the part of the contractor (Payment, if permitted, will be made on the quantity of water calculated on the basis of initial and final water calculated on the basis of initial and final water level measured before starting and completion of each days work which necessitates a bailing / pumping of water from the trench. The final level of water to be measured, will depend on the level at which the day's work will be taken up. The rate includes any seepage water that may percolate in the trench during pumping) |
| 25 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the arth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of,E) Beyond 4.00 km and upto 5.00 km NB :- i) Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. ii)For compensation for earth for land owned and arranged by Contractor add Rs.25.00 per m³ extra over rate of E/W for land owned / arranged by the Department.Royalty charge on earth @ Rs.29.00 per m³ & Cesses charges @ Rs. 5.30 per m3 (i.e.,Rs 15.00 per 100cft),as per Govt. notification, which will be paid on production of necessary documents in support of payment made towards the royalties & Cesses. |
| 26 | Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile. |
| 27 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.Note: Diameter of pile to be measured at a distance of 1.5m from the thicker end. (a) 15 Cm. av. Diameter |
| 28 | 20 cm av. Diameter |
| 29 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.1) Payment to be made on the length driven into the ground. Diameter to be measured at 1.5m. from the thicker end (a) 15 cm av. Diameter |
| 30 | 20 cm av. Diameter |
| 31 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site. (a) Width of thinner end above 15 cm. (i) Jhaw / Eucalyptus |
| 32 | Coal tarring with 5% pitch including cost of material and labour complete as per direction of the Engineer-in-charge. b) Two Coat |
| 33 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). |
| 34 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,(tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. |
| 35 | Dumping in position earth / sand filled gunny / poly bags (capacity 50kg) within a lead of 30 metre inclusive of all lifts. |
| 36 | Taking out Jhaw / Eucalyptus piles from river bed or from elsewhere including carrying, stacking materials in the nearest stack yard. (a) Up to 17.5 cm. Diameter |
| 37 | Taking out bullah wailing pieces after removing nuts, bolts and iron nails and stacking the same within 150 metre from the site of work including sorting out and stacking serviceable meterials. |
| 38 | Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete |
| 39 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening / binding materials to fill up the interstices of coarse aggregate, watering including lighting, guarding, barricading and making necessary earthen bundh of one metre width on each side and preparing the bed by necessary cutting or filling, including cost of all materials and hire and labour charges of all men and machinery and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) Grading-II Aggregate (53 mm to 22.4 mm) Using Stone Screening Type B (11.2 mm) A. Mechanical Means |
| 40 | Providing and erecting direction and place identification retro- reflectorised sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing and Clause 801 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). |
| 41 | Best Seasoned wood work in shutters, posts, plates, rafters, battens, trusses, beams, purlins, bargas, wheel-guards, running boards, frames etc. including supplying at site, handling, hoisting, fitting & fixing in position excluding the cost of bolt and nuts only but including the cost of nails and screws with cost and carriage of all materials complete as per the direction of the Engineer-in-charge. (The quantum should be corrected upto 3 decimels) (b) Hard Wood (Mahua / Arjun / Tentul etc or similar quality hard wood as approved by the Engineer-in-charge) (b) Hard Wood (Mahua / Arjun / Tentul etc or similar quality hard wood as approved by the Engineer-in-charge) |
| 42 | Labour charges for old or new wood work including hoisting, fitting & fixing including supplying new nails and screws wherever necessary etc. complete as per the direction of the Engineer-in-charge. (Thequantum should be corrected upto 3 decimels) |
| 43 | Supplying at site and fitting & fixing Mild Steel long nuts & bolts etc. complete as per the direction of the Engineer-in-charge. |
| 44 | Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. |
| 45 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3. Size of Nylon crate is 1metre X 1metre X 1metre.(a) Where boats are not necessary. Please Enable Macros to View BoQ information |