Tender For Repair/Maintenance Of Fcuss/Acs, Summer &Heating Appliances, Solar Water Heaters, Solar Space Heater And Connected Works At 21 Wing Af Stn Leh, Leh-Ladakh
TDR : 55496801
Tender Notice
BOQ
15 Days Left
Leh
Ladakh
Tender For Repair/Maintenance Of Fcuss/Acs, Summer &Heating Appliances, Solar Water Heaters, Solar Space Heater And Connected Works At 21 Wing Af Stn Leh
Name of Work:- REPAIR/MAINT OF FCUSs/Acs, SUMMER &HEATING APPLIANCES, SOLAR WATER HEATERS, SOLAR SPACE HEATER AND CONNECTED WORKS AT 21 WING AF STN LEH
Sl. No.
Item Description
1
Disconnecting, servicing and cleaning electrically operated FCUs of capacity 3000/ 4500 /6000 Kcal/hr from thermic fluid line complete and keeping aside for decarbonising , cleaning with chemical in all respect with suitable solution / solvent , checking all pipes leakage (inlet and outlet of FCUs) and brazing the punchered pipe where required, cleaning of Y-strainer and reassembling and testing of the same complete all as specified and directed by Engineer-in-Charge.
2
S&F in replacement of FCU blower motor, along with DIDW blower for 6000KCal/Hr complete all as specified and directed by engineer-in-charge.
3
S&F in replacement of FCU blower motor, along with DIDW blower for 3000/4500KCal/Hr complete all as specified and directed by engineer-in-charge.
4
S&F in replacement of 3 Rows Deep copper coil in 3/8\\" construction including 12 mm thick pre - filter for 6000KCal/Hr complete all as specified and directed by engineer-in-charge.
5
S&F in replacement of 3 Rows Deep copper coil in 3/8\\" construction including 12 mm thick pre - filter for 3000/4500KCal/Hr complete all as specified and directed by engineer-in-charge.
6
S&F in replacement of PCB Card for FCUs upto 6000KCal/hr, complete with paired remote all as specified and directed by engineer-in-charge.
7
S&F in replacement of Fan coil unit of cap 6000 KCal/Hr, PCB controlled with 3 Rows Deep copper coil in 3/8\\" construction including 12 mm thick pre - filter, DIDW Centrifugal blower with single phase direct driven motor including complete all as specified and directed by Engineer-in-charge.
8
S&F in replacement of Fan coil unit of cap 3000/4500 KCal/Hr, PCB controlled with 3 Rows Deep copper coil in 3/8\\" construction including 12 mm thick pre - filter, DIDW Centrifugal blower with single phase direct driven motor complete all as specified and directed by engineer-in-charge. Please Enable Macros to View BoQ information
9
S&F in replacement of Fan coil unit of cap 3000/4500 KCal/Hr, PCB controlled with 3 Rows Deep copper coil in 3/8\\" construction including 12 mm thick pre - filter, DIDW Centrifugal blower with single phase direct driven motor complete all as specified and directed by engineer-in-charge. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.