|
| 1 | Engine |
| 2 | Dismantling/Fitting of Engine Head safely by manual/mech. means, etc for inspection/repairs. |
| 3 | Top overhauling of the engine. The job includes inspecting the cylinder head & allied parts, repairing/replacement of damaged/worn out components, machining of the engine head, cleaning the chamber, checking & cleaning nozzles, p/f of piston rings, tappet springs, head gasket, valve seats and allied items/works. Job includes assembling the engine head, draining of old m.oil and filling of fresh m oil and testing the performance on full load. |
| 4 | Lifting of Engine Block safely from the vehicle by hyd. crane /mech. means, etc and safe lowering to work surface for inspection or repairs & fitting the engine back to vehicle after completion of the work. |
| 5 | General overhauling of the engine. The job includes lifting of Engine Block safely from the vehicle by way of hyd. crane /hoist, etc and safe lowering to work surface. Dismantling the various components of the engine (cylinder head, connecting rod, crankshaft, pistons, etc) and allied parts completely for inspection and repairs. Replacement of worn out/damaged components/ parts which include pistons with ring sets, valve sets, valve guide sets, gudgeon pin set, bearing set, big end bearing set, sleeve sets, head gasket, packing set, etc repairing, machining and cleaning the necessary components by skilled labour. Assembling the components/parts of engine job includes draining of old m. oil and filling of fresh m. oil, safely lifting & mounting of engine back to engine enclosure/ fitting the engine back to vehicle and testing the performance of engine on full load. The job incl. allied works & other allied charges. |
| 6 | Providing/fitting of Engine Head |
| 7 | P/F of Piston Set |
| 8 | P/F of Piston Ring Set |
| 9 | P/F of Engine head gasket |
| 10 | M/C of Engine head |
| 11 | P/F of Valve Set |
| 12 | P/F of Valve Guide Set |
| 13 | P/F of Connecting Rod |
| 14 | P/F of Diesel filter assembly/water separator |
| 15 | P/F of Main End Big Bearing Set |
| 16 | P/F of Big End Bearing inst. |
| 17 | P/F of Sleeve Set |
| 18 | P/F of Packing Set |
| 19 | Providing/fitting of Oil pump assembly |
| 20 | Providing/fitting of Fuel injector pipe/Plunger pipe |
| 21 | Providing/fitting of Water body complete assembly |
| 22 | Providing/fitting of M.oil plug |
| 23 | Providing/fitting of Temperature plug |
| 24 | Providing /fitting of water separator without top. |
| 25 | Providing/fitting of Water body pulley |
| 26 | Providing/fitting of Water body gasket |
| 27 | Providing/fitting of Cooling Pipe |
| 28 | P/F of Fan Belt |
| 29 | P/F of dynamo belt |
| 30 | P/F of Steering belt |
| 31 | Providing/fitting of Diesel pipe (small) |
| 32 | Providing/fitting of Accelerator cable |
| 33 | Providing/fitting of Main diesel pipe |
| 34 | P/fitting of Fuel Return pipe |
| 35 | Providing/fitting of Engine mounting |
| 36 | Providing/fitting of Engine Side Plate |
| 37 | P/F of M. Oil Pipe |
| 38 | P/F of Piston ring set |
| 39 | P/F of F.I Pump sensor |
| 40 | P/F of cam sensor |
| 41 | P/F of Oil Separator |
| 42 | P/F of cam bush set |
| 43 | P/F of Temperature Sensor |
| 44 | P/F of Head Cap Oil Seal |
| 45 | P/F of Tappet Cover Gasket |
| 46 | Clutch system |
| 47 | Dismantling /fitting of clutch system |
| 48 | P/F of clutch plate |
| 49 | P/F of pressure plate |
| 50 | P/F of flywheel ring |
| 51 | P/F of Flywheel assembly |
| 52 | P/F of clutch bearing |
| 53 | P/F of clutch paddle |
| 54 | P/F of Clutch paddle spring |
| 55 | P/F of clutch housing |
| 56 | P/F of Clutch cylinder (upper) |
| 57 | P/F of Clutch cylinder (lower) |
| 58 | P/F of clutch bolt |
| 59 | Machining, D/F of Face Plate |
| 60 | P/F of clutch adjustment rod |
| 61 | P/F of Clutch Booster |
| 62 | Gear Box |
| 63 | Dismantling /fitting of Gear Box system |
| 64 | P/F of Main Drive Shaft |
| 65 | P/F of Counter Shaft |
| 66 | P/F of Gear adjuster |
| 67 | P/F of 1st speed Gear |
| 68 | P/F of 2nd speed Gear |
| 69 | P/F of 3rd speed Gear |
| 70 | P/F of 4th speed Gear |
| 71 | P/F of 5th speed Gear |
| 72 | P/F of Reverse Gear |
| 73 | P/F of Gear Box Sleeve |
| 74 | P/F of Gear box Roller Bearing. |
| 75 | P/F of Block Bearing. |
| 76 | P/F of Needle Bearing. |
| 77 | P/F of Synchronizer Ring |
| 78 | P/F of Gear Box Oil Seal Set |
| 79 | P/F of Bonding Tube |
| 80 | P/F of Top Cover Gear Box Lever |
| 81 | P/F of Gear box Lever Kit |
| 82 | P/F of Gear box housing bolt |
| 83 | P/F of Gear box housing |
| 84 | P/F of Gear box cable |
| 85 | P/F of Gear Oil |
| 86 | P/F of Gear Lever End |
| 87 | P/F of Gear Seam Set |
| 88 | P/F of reverse gear stop switch |
| 89 | P/F of Gear Box locking set |
| 90 | Differential |
| 91 | Dismantling /fitting of Differential system |
| 92 | P/F of Crown Wheel Pinion with nut |
| 93 | P/F of Pinion Bearing |
| 94 | P/F of Pinion Shaft |
| 95 | P/F of Ring Gear |
| 96 | P/F of Differential Side Gear |
| 97 | P/F of Spider lock |
| 98 | P/F of Star Kit Complete |
| 99 | P/F of Differential Cage |
| 100 | P/F of Differential Stud |
| 101 | P/F of Star washer Set (Brass) |
| 102 | P/F of Star washer Set (Steel) |
| 103 | P/F of Differential Joint |
| 104 | P/F of Main Oil Seal |
| 105 | P/F of Differential Oil |
| 106 | P/F of Hub & Axle Ring |
| 107 | P/F of Rear axle |
| 108 | Propeller System |
| 109 | Dismantling /fitting of Propeller system |
| 110 | P/F of U-J Cross |
| 111 | P/F of Cross Holder |
| 112 | P/F of Universal joint assembly |
| 113 | P/F of Half Yoke |
| 114 | P/F of Universal Yoke and teeth |
| 115 | P/F of Central Bearing. Assembly Complete |
| 116 | P/F of Universal shaft |
| 117 | P/F of Shaft Bolts with Nuts and Washer. |
| 118 | Complete Greasing |
| 119 | M/C of Shaft |
| 120 | P/F of Sleeve Yoke Set |
| 121 | Suspension System |
| 122 | P/F of F/W King Pin sets with Bush, Bearing, Cotters & Shim, Lock, Rubber,O-ring. |
| 123 | P/F of King Pin Roller Bearing |
| 124 | P/F of King Pin Lock |
| 125 | P/F of King Pin O-ring |
| 126 | P/F of Cotter Set |
| 127 | P/F of Shim Set |
| 128 | P/F of King Pin Set |
| 129 | P/F of King Pin Bush Set |
| 130 | P/F of King Pin Thrust Bearing |
| 131 | P/F of Tie Rod End Set |
| 132 | P/F of leaf spring shackle |
| 133 | P/F of Central Bolt Front |
| 134 | P/F of Central Bolt Rear |
| 135 | P/F of Front leaf spring Main |
| 136 | P/F of Front leaf Spring 2nd |
| 137 | P/F of Front Leaf Spring AUX |
| 138 | P/F of Front leaf Spring 3rd |
| 139 | P/F of Front leaf Spring 4th |
| 140 | P/F of Front leaf Spring 5th |
| 141 | P/F of Front leaf Spring 6th |
| 142 | P/F of Front leaf Spring 7th |
| 143 | P/F of Rear leaf Spring main |
| 144 | P/F of Rear leaf Spring 2nd |
| 145 | P/F of Rear leaf Spring 3rd |
| 146 | P/F of Rear leaf Spring 4th |
| 147 | P/F of Rear leaf Spring 5th |
| 148 | P/F of Rear leaf Spring 6th |
| 149 | P/F of Rear leaf Spring 7th |
| 150 | P/F of support arm/Tie Rod Complete |
| 151 | P/F of Leaf Spring Washer |
| 152 | P/F of Leaf Spring Pin |
| 153 | P/F of Leaf Spring Bush |
| 154 | P/F of Leaf Spring U-Bolt 6’’-9’’ |
| 155 | P/F of Leaf Spring U-Bolt 10’’-16’’ |
| 156 | P/F of Leaf Spring U-Bolt 18’’-22’’ |
| 157 | P/F of Leaf Spring Bracket |
| 158 | P/F of Leaf Spring Cup |
| 159 | P/F of Clip bolt/ Stabilizer |
| 160 | Complete Wheel alignment/balancing |
| 161 | P/F of Front wheel shock absorber |
| 162 | P/F of Rear wheel shock absorber |
| 163 | Re- tensioning of Leaf spring set |
| 164 | P/F of Leaf Spring Clip |
| 165 | P/F of Leaf Spring Clip bolt |
| 166 | P/F of Leaf Spring cotter |
| 167 | P/F of Small Tie Rod |
| 168 | Fuel Injection Pump |
| 169 | Complete Overhauling/calibration of FI Pump with P/F of required parts i.e., Nozzle, Vane Pump, TD Piston, DP Head, Oil Seal, Cross Disc. |
| 170 | Dismantling/ Checking/Assembling of Nozzle |
| 171 | Complete Cleaning/calibration of FI Pump |
| 172 | P/F of Nozzle |
| 173 | Testing of Nozzles |
| 174 | P/F of F.I pipe |
| 175 | P/F of Diesel return pipe |
| 176 | P/F of Rotary Pump Unit |
| 177 | P/F of Cam Plate |
| 178 | P/F of Oil Seal |
| 179 | P/F of T.D Piston |
| 180 | P/F of Cross Disc |
| 181 | P/F of D.P Head |
| 182 | P/F of V.E Pump Repair Kit |
| 183 | P/F of Feed Pump assembly |
| 184 | Steering System |
| 185 | Dismantling /fitting of Steering system |
| 186 | P/F of Steering bush |
| 187 | P/F of Steering gear box assembly complete |
| 188 | P/F of Steering Repair kit |
| 189 | Repairing to Steering Bracket with Welding |
| 190 | P/F of Steering column/shaft with allied accessories |
| 191 | P/F of Hydraulic Pipes |
| 192 | P/F of Steering Assembly Complete |
| 193 | P/F of Steering Bearing. |
| 194 | P/F of Steering Cross |
| 195 | P/F of Steering Pit Man Arm |
| 196 | P/F of Steering pinion |
| 197 | P/F of Steering Knuckle Arm |
| 198 | P/F of Drag Link Kit |
| 199 | P/F of Tie rod end Kit |
| 200 | P/F of Steering Oil (Power, Wax Pol, Mak or equi.) ATF |
| 201 | P/F of Steering Bolt |
| 202 | Turbo System |
| 203 | Servicing of Turbo Charger |
| 204 | P/F of Turbo Core Assembly with allied works. |
| 205 | P/F of Turbo charger kit |
| 206 | P/F of Replacement of turbo charger |
| 207 | P/F of Turbo Hose |
| 208 | P/F of Turbo gasket and bolt |
| 209 | P/F of washer and ring |
| 210 | Self Starter |
| 211 | P/F of Self Overhauling |
| 212 | P/F of Self Soldering |
| 213 | P/F of Armature Assembly |
| 214 | P/F of Self-Carbon brush set |
| 215 | P/F of Solenoid switch |
| 216 | P/F of selfBendex Drive |
| 217 | P/F of Self-clutch fork |
| 218 | P/F of Self-bush set |
| 219 | P/F of Self housing |
| 220 | P/F of Self Bearing |
| 221 | P/F of Complete Self Starter Assembly |
| 222 | Fabrication/Providing/Fitting of battery box made out of MS Strips and angle Iron of required size and thickness as per requirement |
| 223 | P/F of Battery terminals |
| 224 | P/F of Battery Lead Sets (02 Nos) |
| 225 | P/F of Battery Acid |
| 226 | P/F of self Lock Set |
| 227 | Alternator Assembly |
| 228 | Servicing of Alternator |
| 229 | P/F of Rectifier plate |
| 230 | P/F of Field coil set |
| 231 | P/F of Carbon Brush Set |
| 232 | P/F of Cut out |
| 233 | P/F of Commutator switch set |
| 234 | P/F of Armature Assembly |
| 235 | P/F of Oil Seal |
| 236 | P/F of Bearing |
| 237 | P/F of bush Set |
| 238 | Radiator Assembly |
| 239 | P/F of Radiator cooling Fan |
| 240 | P/F of Radiator Cup |
| 241 | P/F of Radiator Tank |
| 242 | P/F of Hose pipe Sets with Clamps |
| 243 | Repairs/soldering to fin and radiator tanks |
| 244 | P/F of Radiator Foundation |
| 245 | P/F of Radiator Foundation Bolt |
| 246 | P/F of new Radiator as per the sample/fit with allied accessories complete. |
| 247 | P/F of Coolant |
| 248 | Servicing of Radiator with chemical solution |
| 249 | P/F of thermostat valve |
| 250 | Electrical Works |
| 251 | P/F of complete new wiring system front |
| 252 | P/F of complete new wiring system rear |
| 253 | P/F of wires (as per sample)/meter. |
| 254 | Replacement of Old worn out/damaged wiring set |
| 255 | P/F of New Horn Assembly Double |
| 256 | P/F of Head Light Assy. |
| 257 | P/F of Head Light bulb |
| 258 | P/F of Tail light assy. |
| 259 | P/F of Indicator assy. |
| 260 | P/F of Bulb Holder |
| 261 | P/F of bulb |
| 262 | P/F of Roof Light |
| 263 | P/F of Fog Lamp |
| 264 | P/F of Combination Switch |
| 265 | P/F of Wiper blade assy. (Set of two) |
| 266 | P/F of Ignition switch |
| 267 | P/F of Complete Dash board cluster |
| 268 | P/F of Wiper blade machine |
| 269 | Vehicle scanning using engine analyzer |
| 270 | P/F of ECU/ECM |
| 271 | P/F of Flasher |
| 272 | P/F of Speedometer |
| 273 | P/F of Speedometer Cable |
| 274 | P/F of Speedometer Sensor |
| 275 | Repairing to Speedometer |
| 276 | P/F of Wiper blade set |
| 277 | Soldering to Connection |
| 278 | P/F of Tape Roll |
| 279 | P/F of Main Line Switch |
| 280 | P/F of Cabin Switch |
| 281 | P/F of Reverse Plug |
| 282 | Replacement of fuse |
| 283 | P/F of Fuse Box |
| 284 | Filters |
| 285 | P/F of Tappet cover( Gasket) |
| 286 | P/F of M Oil Filter |
| 287 | P/F of M Oil |
| 288 | P/F of By Pass Filter |
| 289 | P/F of Water Separator Assy. |
| 290 | P/F of Air Filter set |
| 291 | P/F of Fuel Filter |
| 292 | Brake and wheel System |
| 293 | Dismantling /fitting of Brake & Wheel system |
| 294 | P/F of Brake Slack Adjuster Assy. |
| 295 | P/F of Wheel cylinder Assy. |
| 296 | P/F of Front & Rear Cylinder Assy. |
| 297 | P/F of Master Cylinder assy. |
| 298 | P/F of Dual Brake Valve Assy. Sets (Booster) |
| 299 | P/F of Air Pressure Pipe 36’’-60’’ |
| 300 | P/F of Air Pressure Pipe 72’’-144’’ |
| 301 | P/F of Brake Actuator |
| 302 | P/F of Hand brake cable with lever |
| 303 | P/F of Brake pipe |
| 304 | Repairs/servicing of ARV |
| 305 | P/F of Complete pressure release valve |
| 306 | P/F Diaphragm for servo |
| 307 | P/F inner Wheel oil seal |
| 308 | P/F of outer wheel oil seal |
| 309 | P/F Inner wheel bearing |
| 310 | P/ F Outer wheel bearing |
| 311 | P/F of Brake lining set |
| 312 | P/F of brake shoes spring |
| 313 | P/F of wheel spindle |
| 314 | P/F of wheel drum |
| 315 | P/F of Pressure head |
| 316 | P/F of wheel side plate |
| 317 | P/F of wheel hub bolt with nut |
| 318 | Tyre puncture repair |
| 319 | Wheel Spanner/Spindle (SS) |
| 320 | Wheel alignment/ balancing |
| 321 | P/F of Grease in wheel hubs, bearings |
| 322 | P/F of Brake Oil (Dot4) |
| 323 | P/F of SBA Booster Kit |
| 324 | P/F of Brake Pipe Puncher Plug |
| 325 | P/F of tyre tube |
| 326 | P/F of tyre Ring |
| 327 | P/F of Dual Brake Valve Kit |
| 328 | Window Glasses and Front wind shield |
| 329 | P/F of Front Glass/Wind Shield |
| 330 | P/F of Door Glass Right/ left |
| 331 | P/F of Rubber for Front Glass Fitting |
| 332 | P/F of Mirror Bonding Tube |
| 333 | P/F of Side mirror assy. |
| 334 | P/F of Cabin glass |
| 335 | P/F of Cabin rear view mirror |
| 336 | P/F of Door rubber |
| 337 | Body and Chassis |
| 338 | Repairs to Body. Cutting of damaged portion with the help of Gas cutter & then denting by hammer beating/heat treatment. Welding of new patches/sheets where ever required cutting of the damaged bolts & nuts with the help of gas cutter, straightening the damaged portion of chassis with the help of Mechanical Jacks,hammers,gas cutter & manual skilled labor & patching, finishing & painting |
| 339 | Repairs to chassis by way of Providing/Fitting & welding of new supporting members to chassis, Setting the chassis in position |
| 340 | Repairing/Welding to battery box incl. allied works |
| 341 | Repairing/welding to seat incl. other allied works |
| 342 | Repairs to Fuel Tank |
| 343 | Annual Passing |
| 344 | Painting of Whole body in departmental color. Scratching/Removing old Paint with the help of chemical treatment then applying putty wherever required, Two coats red oxide & then applying 2 coats of epoxy paint coat inside water tank & two coats of enamel paint outside incl. Letter writing |
| 345 | Painting of Tank inside body. Scratching/Removing old Paint with the help of chemical treatment then applying putty wherever required, Two coats red oxide & then applying 2 coats of epoxy paint coat inside water tank and allied works |
| 346 | Denting/Painting of cabin (Inside & outside)/Body in departmental color. Scratching/Removing old Paint with the help of chemical treatment then applying putty wherever required, Two coats red oxide and then applying two coats of paint job includes welding, grinding/ finishing of surface, incl. Letter writing. |
| 347 | Denting by Hammer Beating/heat treatment as required & repairing of front Bumper |
| 348 | P/F of Front Bumper |
| 349 | Denting by Hammer Beating /heat treatment as required & repairing of front Show incl. welding, painting & allied works. |
| 350 | Denting by Hammer Beating /heat treatment as required and repairing of Fender incl. welding, painting & allied works. |
| 351 | P/F of Fender L/R |
| 352 | Denting by Hammer Beating /heat treatment as required and repairing of Window incl. welding, painting & allied works. |
| 353 | Denting by Hammer Beating /heat treatment as required and repairing of foot rest with patching |
| 354 | Denting by Hammer Beating /heat treatment as required & repairing rear Mud guard with Patching |
| 355 | P/F of Front Mud Guard |
| 356 | P/F of Hood/Bonnet Latch |
| 357 | Repairing of Body Part with Welding |
| 358 | P/F of Window regulator Machine |
| 359 | P/F of Door Handle outside |
| 360 | P/F of Door handle inside |
| 361 | P/F of Door trim |
| 362 | P/F of Door Lock |
| 363 | P/F of Door Latch |
| 364 | P/F of Cabin Mounting |
| 365 | P/F of seat cover with foam of standard quality to all seats in cabin. |
| 366 | P/F of seat cover of standard quality to all seats in cabin |
| 367 | Replacement of front tyre (Radial) of required size (7.50-16 or as per sample) of make MRF/Goodyear/ Ceat/ JK /Appollo. |
| 368 | Replacement of front tyre (Nylon) of required size (7.50-16 or as per sample) of make MRF/Goodyear/ Ceat/ JK /Appollo. |
| 369 | Replacement of rear tyre (Radial) of required size (7.50R16 or as per sample) of make MRF/Goodyear/ Ceat/ JK /Appollo. |
| 370 | Replacement of rear tyre (Nylon) required size (7.50-16 or as per sample) of make MRF/Goodyear/Ceat/JK/ Appollo. |
| 371 | Charges for toe with crane |
| 372 | Fabrication/P/F of water tank partition, inside the tank as per size and shape of the tank with reinforcement of angle iron as base so as to fix MS sheet of reqd. thickness including cost of wastage |
| 373 | Fabrication/P/F of MS channel {Safety Girder ) of required size with painting |
| 374 | Fabrication /P/F of mud guard of reqd. thickness MS sheet with angle iron reinforcement as per requirement |
| 375 | Fabrication /P/F of tool box/batt. box of reqd. thickness MS sheet and angle iron frame/ reinforcement as per requirement with hinges ,handle and locking system |
| 376 | P/F of Radiator Cover |
| 377 | Complete washing of the vehicle with vacuum cleaning incl. wax polishing on int. surfaces. |
| 378 | Silencer/Exhaust System |
| 379 | Repairing of Exhaust System |
| 380 | P/F of Exhaust Pipe |
| 381 | P/F of Tail Pipe |
| 382 | P/F of Extension Pipe |
| 383 | P/F of Muffler/Main Body |
| 384 | P/F of silencer Assembly |
| 385 | P/F of Silencer Clamps set |
| 386 | P/F of Silencer Joint |
| 387 | P/F of Silencer Hanger |
| 388 | P/F of Silencer Gas Welding and Patching |
| 389 | P/F of Silencer Main Body |
| 390 | P/F of spring washer |
| 391 | Complete Washing of the diesel tank |
| 392 | PUCC testing charges for six month |
| 393 | DG Set |
| 394 | Disassembling/Assembling of the Engine |
| 395 | General Overhauling of the Engine:-The job includes Checking the damages of the internal structure of the engine, Replacement of cylinder liner, piston, piston rings, large & small bearing bushes, crankshaft thrust pads, intake & exhaust valves. The job also includes checking of wear degree of valves & valve seat, checking & adjusting of valve clearance, checking & adjusting the torque of connecting rod, checking & adjusting the tension of the fan belt, cleaning of carbon deposits in the intake manifold, cleaning of intercooler core, cleaning of oil lubrication system, oil pan sludge & metal iron filings. |
| 396 | P/F of Cylinder Liner |
| 397 | P/F of Piston Set |
| 398 | P/F of Ring Set |
| 399 | P/F of Bearing Set |
| 400 | P/F of Bearing Bushes |
| 401 | P/F of Crankshaft Thrust Pads |
| 402 | P/F of Inlet Valve |
| 403 | P/F of Exhaust Valve |
| 404 | P/F of Aluminum Thimble of required size |
| 405 | P/F of Copper Thimble upto 35 mm2of required size |
| 406 | Providing of 1 inchflate file |
| 407 | Cutting edge chisel (22mm) |
| 408 | P/F of Injector Head |
| 409 | P/F of Turbocharger Overhaul Kit |
| 410 | P/F of Water Pump Repair Kit |
| 411 | P/F of Oil Pipe |
| 412 | P/F of Fuel Pipe |
| 413 | P/F of Connecting Rod |
| 414 | Machining Job to Crankshaft |
| 415 | Pump Overhauling |
| 416 | Hand operated rotary (Barrel) oil pump of reputed make |
| 417 | Grease gun heavy duty with flexible hoses and allied items of reputed make |
| 418 | Filters |
| 419 | P/F of M Oil Filter |
| 420 | P/F of Air Filter |
| 421 | P/F of Fuel Filter |
| 422 | P/F of M.Oil |
| 423 | Servicing of Radiator with chemical solution |
| 424 | Alternator System |
| 425 | P/F of Rectifier plate |
| 426 | P/F of Field coil set |
| 427 | P/F of Carbon Brush Set |
| 428 | P/F of Cut out |
| 429 | P/F of Armature Assembly |
| 430 | P/F of Oil Seal |
| 431 | P/F of Bearing |
| 432 | Self Starter |
| 433 | P/F of Self Overhauling |
| 434 | P/F of Self Soldering |
| 435 | P/F of Armature Assembly |
| 436 | P/F of Self-Carbon brush set |
| 437 | P/F of Solenoid switch |
| 438 | P/F of Self Bendex Drive |
| 439 | P/F of Self-clutch fork |
| 440 | P/F of Self-bush set |
| 441 | P/F of Self housing |
| 442 | P/F of Self Bearing |
| 443 | P/F of Complete Self Starter Assembly |
| 444 | P/F of Battery terminals |
| 445 | P/F of Battery Lead set (02 No’s) |
| 446 | P/F of Battery Acid |
| 447 | Petrol Driven Portable Pump |
| 448 | Complete Overhauling Pump Set |
| 449 | P/F of timing gear set Please Enable Macros to View BoQ information |