| 1 | Earth work in filling upto distance 10.00 km lead with cartage/royalty for levelling dressing including supply of all material,labour and T&P etc.required for proper completion of work, |
| 2 | Concrete in 1:6:12 with cement,fine sand and brick ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work.(Chpt-5/273) |
| 3 | M-150 brick work in 1:4 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work,(asper Analysis) |
| 4 | 12mm thick Plaster in 1:4 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-13/582a) |
| 5 | Laying of C.C work in 1:2:4 with cement,coarse sand and stone ballast of 2cm guage including supply of all material,labour and T&P etc required for proper completion of work (Chpt-5/279a) |
| 6 | Providing,laying,spreading 45.5-63mm stone Aggregate in one layer with fine sand including supply of all material,labour and T&P etc.required for proper completion of work |
| 7 | Providing,laying,spreading 22.4-53mm stone Aggregate in one layer with fine sand including supply of all material,labour and T&P etc.required for proper completion of work |
| 8 | Supply & laying of 80mm thick I shaped Vibrator made Interlocking cement concrete pavers block (Colours tiles ISI Mark) including joint filling with local sand supply of all material,labour and T&P etc.required for proper completion of work (asper Analysis) |
| 9 | Supply & laying of 80mm thick I shaped Vibrator made Interlocking cement concrete pavers block (Colours tiles ISI Mark) including joint filling with local sand supply of all material,labour and T&P etc.required for proper completion of work (asper Analysis) Grey tiles |
| 10 | Earth work in excavation in ordinary soil upto 1.5 M & lead upto 30 M including back filling watering and ramming of excavated earth.including supply of all material,labour and T&P etc.required for proper completion of work, Chpt-4/251 |
| 11 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in raft foundation i/c supply of all material,labour and T&P etc.including all complete of work,287a |
| 12 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in Column i/c supply of all material,labour and T&P etc.including all complete of work (289) |
| 13 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in suspended floor slab i/c supply of all material,labour and T&P etc.including all complete of work |
| 14 | Mild steel or iron work such as reinforced including supply of all material,labour and T&P etc.required for proper completion of work Please Enable Macros to View BoQ information |