| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared. |
| 2 | Surface dressing of the ground including removing vegetation and in- equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil |
| 3 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layer with motor graded on perpared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratoy roller to achieve the desired density complete as per clause 401. for grading I material (GSB-1) (Sanction rate) |
| 4 | Providing and laying spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carrige of mixed material by tipper to site, laying in uniform layiers with paver in sub-base / base course one well prepared surface and compacting with vibratory roller to achieve the desired density. (Sanction Rate) |
| 5 | Providing and applying tack coat with bitumen (Vg-10) pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.Both wheeled Roller 8 - 10 tonne capecity, finished to required level and grades. (Sanction Rate) |
| 6 | providing and laying dense graded bituminous macadam with higher capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. |
| 7 | providing and laying bituminous concrete with higher capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4% of mixed and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. |
| 8 | Providing and applying 2.5 mm thick Road marking strips retro reflective of specified shade /colour using hot thermoplastic material by Fully /semi automatic thermoplastic paint applicator machine fitted with profile shoe,aglass beads dispenser propane tank heater and profile show heater driven by experience operator on road surface including cost of material, labour t& p cleaning the road surface of all all dirt , seals, oil ,grease and a foreign material etc. complete as per direction of engineer in charge and accordance with applicable specification |
| 9 | providing and applying primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means Please Enable Macros to View BoQ information |