| 1 | Installation, testing, commissioning including loading, transportation, , unloading, carriage and delivery at Site and erection of 630/400 KVA Distribution Transformer (Note: Distribution Transformer shall be provided by KPDCL) |
| 2 | Installation, testing, commissioning including loading, transportation, unloading, carriage and delivery at Site and erection of 250/100 KVA Distribution Transformer (Note: Distribution Transformer shall be provided by KPDCL) |
| 3 | Installation, testing, commissioning including loading, transportation, unloading, carriage and delivery at Site and erection of 63/25 KVA Distribution Transformer (Note: Distribution Transformer shall be provided by KPDCL) |
| 4 | Loading, Transportation,, Unloading, Carriage and Delivery at Site and erection of 11 Mtr. Long ST Poles with pit excavation (Note: The poles shall be provided by KPDCL) |
| 5 | Loading, Transportation, , Unloading, Carriage and Delivery at Site and erection of 9 Mtr. Long ST Poles with pit excavation (Note: The poles shall be provided by KPDCL) |
| 6 | Loading, Transportation, , Unloading, Carriage and Delivery at Site and erection of 8 Mtr. Long ST Poles with pit excavation (Note: The poles shall be provided by KPDCL) |
| 7 | Loading, Transportation, Unloading, Carriage and Delivery at Site and erection of PCC Poles with pit excavation (Note: The poles shall be provided by KPDCL) |
| 8 | Loading, Transportation, Unloading, Carriage and Delivery at Site, Laying, stringing and binding of conductor including joints with PG clamps of required size (Note conductor to be provided by KPDCL) 100 mm² ACSR (Dog) |
| 9 | Loading, Transportation, Unloading, Carriage and Delivery at Site, Laying, stringing and binding of conductor including joints with PG clamps of required size (Note conductor to be provided by KPDCL) 50 mm² ACSR ( Rabbit) |
| 10 | Loading, Transportation, , Unloading, Carriage and Delivery at Site, Laying, stringing and binding of conductor including joints with PG clamps of required size (Note conductor to be provided by KPDCL) 30 mm² ACSR ( Weasel) |
| 11 | Providing of skilled labourer alongwith all necessary tools/equipment’s for trimming of branches, cutting of branches , trees in HT/LT corridors as identified by concerned subdivisions for minimising faults or other works [ Complete adherence to safety protocols, labourers experienced in working in electrical systems and employment completely as per Labour laws of the UT] |
| 12 | Providing of unskilled labourer alongwith all necessary tools/equipment’s for helping trimming of branches, cutting of branches , trees in HT/LT corridors as identified by concerned subdivisions for minimising faults or other works [ Complete adherence to safety protocols, labourers experienced in working in electrical systems and employment completely as per Labour laws of the UT] |
| 13 | Supply and fixing of earthing of 8/9Mtr Pole as per J1 Standard (GI Wire of 8 SWG, 115 turns) |
| 14 | Supply and fixing of earthing of 8/9Mtr Pole Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI Strip as per relevant IS. |
| 15 | Providing and laying of cement bottoming for 8/9 mtr pole 0.5 cum / pole 1:2:4 ratio as per standard |
| 16 | Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of |
| 17 | Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI |
| 18 | Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & |
| 19 | lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials |
| 20 | and earth Chamber made of brick masonary with RCC slab cover. |
| 21 | Chemical earthing by way of digging 2.5 mtr deep earth pit embedding a 2ft*2ft*4ftmm thick copper plate as main earthing electrode(38mm Copper) connecting the plate with main control opanel by 10SWG copper wire with 1/2 inch dia full thread brass nuts bolts and washers, refilling the pit with alternate layers of salt charcoal and earth |
| 22 | Supply of paint and Painting of 9/8 mtr poles with two coats of red oxide and two coat of aluminium. |
| 23 | Installation, testing and commissioning of 11 kV Heavy Duty Station type Link Set of Standard Make (400 Amp) as per relevant IS. |
| 24 | Installation, testing and commissioning of 11 kV Heavy Duty Line type Link Set of Standard Make (800 Amp) as per relevant IS. (Note:Link set to be provided by KPDCL) |
| 25 | Installation, testing and commissioning of 11 kV GO AB Switch Station Type of Standard Make (400 Amp) as per relevant IS.(Note:Link set to be provided by KPDCL) |
| 26 | Installation, testing and commissioning of 11 kV GO AB Switch Line Type of Standard Make (800 Amp) as per relevant IS.(Note:GO to be provided by KPDCL) |
| 27 | Installation, testing and commissioning of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer |
| 28 | housing, Stn. Type as per relevant IS.(Note:LA to be provided by KPDCL) |
| 29 | Installation, testing and commissioning of DO 11 kV Horn Gap Fuse Set 3 Phase 200A as per relevant IS.(Note:DO to be provided by KPDCL) |
| 30 | Fixing of 11kV Polymeric composite Pin Insulator 12kV, 10kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm(Note:PIN Insulator to be provided by KPDCL) |
| 31 | Fixing of 11kV Porcelain Disc Insulator 12kV, 10kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm(Note:PIN Insulator to be provided by KPDCL) |
| 32 | Installation, testing and commissioning of LT Shackle Insulator with mukki clamps(Note:Shcakle with mukhi clamps to be provided by KPDCL) |
| 33 | Installation, testing and commissioning of LT Shackle Insulator with D-clamps(Note:Shcakle with D clamps to be provided by KPDCL) |
| 34 | Fixing of fabricated GI Angle/Channel/Flat/ V-cross with F-top/Pole Collars including nuts and bolts (Note:GI to be provided by KPDCL) |
| 35 | Fixing of fabricated MS Angle/Channel/Flat/Pole Collars including nuts and bolts (Note:GI to be provided by KPDCL) |
| 36 | Fixing of Galvanised nuts and bolts(Note:Nuts and Bolts to be provided by KPDCL) |
| 37 | Installation, testing and commissioning of 25 mm² AB (HT) Cable 3 core XLPE/PVC (Note:Cable to be provided by KPDCL) |
| 38 | Installation, testing and commissioning of 25 mm² AB (HT) Cable single core XLPE/PVC (Note:Cable to be provided by KPDCL) |
| 39 | Installation, testing and commissioning of 35 mm² AB (HT) Cable 3 core XLPE/PVC (Note:Cable to be provided by KPDCL) |
| 40 | Installation, testing and commissioning of 35 mm² AB (HT) Cable single core XLPE/PVC (Note:Cable to be provided by KPDCL) |
| 41 | Installation, testing and commissioning of 50 mm² AB (HT) Cable 3 core XLPE/PVC (Note:Cable to be provided by KPDCL) |
| 42 | Installation, testing and commissioning of 50 mm² AB (HT) Cable 1 core XLPE/PVC (Note:Cable to be provided by KPDCL) |
| 43 | Installation, testing and commissioning of 70 mm² AB (HT) Cable 3 core XLPE/PVC (Note:Cable to be provided by KPDCL) |
| 44 | Installation, testing and commissioning of 70 mm² AB (HT) Cable 1 core XLPE/PVC (Note:Cable to be provided by KPDCL) |
| 45 | Installation, testing and commissioning of 120 mm² AB (HT) Cable 3 core XLPE/PVC (Note:Cable to be provided by KPDCL) |
| 46 | Installation, testing and commissioning of 120 mm² AB (HT) Cable1 core XLPE/PVC (Note:Cable to be provided by KPDCL) |
| 47 | Dismentaling of 120 mm²/ 70 mm²/ 50 mm²/ 35 mm²/ 25 mm² AB (HT) cable 3-core+E XLPE/PVC |
| 48 | Installation, testing and commissioning of 35 mm² AB (HT) Cable outdoor termination kit 3-Core [Raychem/3M](Note:Kit to be provided by KPDCL) |
| 49 | Installation, testing and commissioning of 35 mm² AB (HT) Cable outdoor termination kit Single core [Raychem/3M](Note:Kit to be provided by KPDCL) |
| 50 | Installation, testing and commissioning of 50 mm² AB (HT) Cable outdoor termination kit 3-Core [Raychem/3M](Note:Kit to be provided by KPDCL) |
| 51 | Installation, testing and commissioning of 50 mm² AB (HT) Cable outdoor termination kit Single Core [Raychem/3M](Note:Kit to be provided by KPDCL) |
| 52 | Installation, testing and commissioning of 70 mm² AB (HT) Cable outdoor termination kit 3- Core [Raychem/3M](Note:Kit to be provided by KPDCL) |
| 53 | Installation, testing and commissioning of 70 mm² AB (HT) Cable outdoor termination kit Single Core [Raychem/3M](Note:Kit to be provided by KPDCL) |
| 54 | Installation, testing and commissioning of 120 mm² AB (HT) Cable outdoor termination kit 3-Core [Raychem/3M](Note:Kit to be provided by KPDCL) |
| 55 | Installation, testing and commissioning of 120 mm² AB (HT) Cable outdoor termination kit Single Core [Raychem/3M](Note:Kit to be provided by KPDCL) |
| 56 | Installation, testing and commissioning of 35 mm² AB (HT) Cable outdoor jointing kit 3-Core [Raychem/3M](Note:Kit to be provided by KPDCL) |
| 57 | Installation, testing and commissioning of 35 mm² AB (HT) Cable outdoor jointing kit Single Core [Raychem/3M](Note:Kit to be provided by KPDCL) |
| 58 | Installation, testing and commissioning of 50 mm² AB (HT) Cable outdoor jointing kit 3-Core [Raychem/3M](Note:Kit to be provided by KPDCL) |
| 59 | Installation, testing and commissioning of 50 mm² AB (HT) Cable outdoor jointing kit Single Core [Raychem/3M](Note:Kit to be provided by KPDCL) |
| 60 | Installation, testing and commissioning of 70 mm² AB (HT) Cable outdoor jointing kit 3-Core [Raychem/3M](Note:Kit to be provided by KPDCL) |
| 61 | Installation, testing and commissioning of 70 mm² AB (HT) Cable outdoor jointing kit Single Core [Raychem/3M](Note:Kit to be provided by KPDCL) |
| 62 | Installation, testing and commissioning of 120 mm² AB (HT) Cable outdoor jointing kit 3-Core [Raychem/3M](Note:Kit to be provided by KPDCL) |
| 63 | Installation, testing and commissioning of 120 mm² AB (HT) Cable outdoor jointing kit Single Core [Raychem/3M](Note:Kit to be provided by KPDCL) |
| 64 | Installation, testing and commissioning of 50 mm sq LT PVC Single Core,1.1kV Grade, XLPE/PVC/FRLS type with proper thimbling, crimping and routing (Note:Cable to be provided by KPDCL) |
| 65 | Installation, testing and commissioning of 70 mm sq LT PVC Single Core,1.1kV Grade, FRLS type with proper thimbling, crimping and routing (Note: Cable to be provided by KPDCL) |
| 66 | Installation, testing and commissioning of 120 mm sq LT PVC Single Core,1.1kV Grade, XLPE/PVC/FRLS type with proper thimbling, crimping and routing (Note:Cable to be provided by KPDCL) |
| 67 | Installation, testing and commissioning of 185 mm sq LT PVC Single Core,1.1kV Grade, XLPE/PVC/FRLS type with proper thimbling, crimping and routing (Note:Cable to be provided by KPDCL) |
| 68 | Installation, testing and commissioning of 300 mm sq LT PVC Single Core,1.1kV Grade, XLPE/PVC/FRLS type with proper thimbling, crimping and routing(Note:Cable to be provided by KPDCL) |
| 69 | Installation, testing and commissioning of 400 mm sq LT PVC Single Core,1.1kV Grade, XLPE/PVC/FRLS type with proper thimbling, crimping and routing (Note:Cable to be provided by KPDCL) |
| 70 | Installation, testing and commissioning of 630 mm sq LT PVC Single Core,1.1kV Grade, XLPE/PVC/FRLS type with proper thimbling, crimping and routing (Note:Cable to be provided by KPDCL) |
| 71 | Installation testing and commissioning of LT cable termination Kits of size 3.5 core |
| 72 | Installation testing and commissioning of LT cable termination Kits of size single core |
| 73 | Installation testing and commissioning of LT cable joint Kits of size 3.5 core |
| 74 | Installation testing and commissioning of LT cable joint Kits of size single core |
| 75 | Dismantling of 630 mm²/ 400 mm²/ 300mm²/ 185 mm²/ 120 mm²/70 mm²/ 50 mm² LT PVC Single Core,1.1kV Grade, FRLS type cable |
| 76 | Providing, Fixing, Testing & Commissioning of Chemical Earthing for Diesel Generator II |
| 77 | Dismantling of 8/9 mtr ST Poles and transportation to Divisional Store |
| 78 | Dismantling of PCC Poles and disposal at site |
| 79 | Dismantling of Wooden Poles and transportation to Divisional Store |
| 80 | Laying, stringing and commissioning of 0.03 ACSR Conductor |
| 81 | Dismantling of 0.03 ACSR Conductor |
| 82 | Laying, stringing and commissioning of 0.05 ACSR Conductor |
| 83 | Dismantling of 0.05 ACSR Conductor |
| 84 | Laying, stringing and commissioning of 0.1 ACSR Conductor |
| 85 | Dismantling of 0.1 ACSR Conductor |
| 86 | Dismantling of 0.03/ 0.05/ 0.1 ACSR Conductor and transportation to Divisional Store |
| 87 | Providing and fixing of Nut & bolt |
| 88 | Providing and Fixing of pole butt |
| 89 | Fixing of pole butt |
| 90 | Providing and fixing of LT Shekels with Mukki Clamp |
| 91 | Supply and Installation of LT Shekels with D Clamp |
| 92 | Supply and fixing of eye bolts |
| 93 | Fixing of eye bolts |
| 94 | Supply and fixing of piercing connectors of sizes |
| 95 | Fixing of piercing connectors of sizes |
| 96 | Supply and fixing of suspension/ tension clamps with eye-hook |
| 97 | Fixing of suspension/ tension clamps with eye-hook |
| 98 | Fixing of aluminium thimble of sizes |
| 99 | Supply and Fixing of aluminium thimble of sizes |
| 100 | Fixing of SL Clamps |
| 101 | Supply and Fixing of SL Clamps |
| 102 | Fixing of LT Fuse Set |
| 103 | Providing and fixing of LT fuse set |
| 104 | Providing and fixing of Danger Plates |
| 105 | Fixing of Danger Plates |
| 106 | Providing and fixing of Anti Climbing Devices with clamps |
| 107 | Fixing of Anti Climbing Devices with clamps |
| 108 | SITC of 11KV Disc Insulators |
| 109 | Installation of 11KV Disc Set |
| 110 | Installation of single phase SMD Box with bus bar (8 Way) |
| 111 | Shifting and installation single phase SMD Box with bus bar (8 Way) |
| 112 | Installation of single phase conventional/ smart meter (existing/ new) (note the material if required for installation of meter shall be provided by contractor) |
| 113 | Dismantling of Conventional/ Smart meter |
| 114 | Installation of three Phase conventional/ smart meter (existing/ new) (note the material if required for installation of meter shall be provided by contractor) |
| 115 | Dismantling of three phase energy meter |
| 116 | Providing and fixing of fabricated MS Angle/Channel/Flat/Pole Collars including nuts and bolts |
| 117 | Providing and fixing of 11 kV Heavy Duty Station type Link Set of Standard Make (400 Amp) as per relevant IS. |
| 118 | Providing and fixing of 11 kV Heavy Duty Line type Link Set of Standard Make (800 Amp) as per relevant IS. |
| 119 | Providing and fixing of 11 kV GO AB Switch Station Type of Standard Make (400 Amp) as per relevant IS. |
| 120 | Providing and fixing of 11 kV GO AB Switch Line Type of Standard Make (800 Amp) as per relevant IS. |
| 121 | Providing and fixing of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type as per relevant IS. |
| 122 | Providing and fixing of DO 11 kV Horn Gap Fuse Set 3 Phase 200A as per relevant IS. |
| 123 | Stringing of ACSR Conductor .03/.05/.1 |
| 124 | Straighting of tilted poles 08/ 09 Mtr long st poles |
| 125 | Installation of LT prodigy meter |
| 126 | Installation of HT tri vector meter |
| 127 | Dismantling of 100/250 KVA transformer and return to divisional store |
| 128 | Dismantling of 400/630 KVA transformer and return to divisional store |
| 129 | Dismantling of ACSR conductor of sizes and return to divisional store |
| 130 | Installation of three phase SMD Box with bus bar (12 Way) |
| 131 | Shifting and installation of three phase SMD Box with bus bar (12 Way) |
| 132 | Providing and fixing of 11kV Polymeric composite Pin Insulator 12kV, 10kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 133 | Providing and fixing of 11kV Porcelain Disc Insulator 12kV, 10kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 134 | Supply, installation, testing and commissioning of 35 mm² AB (HT) Cable outdoor jointing kit 3-Core [Raychem/3M] |
| 135 | Supply, installation, testing and commissioning of 35 mm² AB (HT) Cable outdoor jointing kit Single Core [Raychem/3M] |
| 136 | Supply, installation, testing and commissioning of 50 mm² AB (HT) Cable outdoor jointing kit 3-Core [Raychem/3M] ) |
| 137 | Supply, installation, testing and commissioning of 50 mm² AB (HT) Cable outdoor jointing kit Single Core [Raychem/3M] |
| 138 | Supply, installation, testing and commissioning of 70 mm² AB (HT) Cable outdoor jointing kit 3-Core [Raychem/3M] |
| 139 | Supply, installation, testing and commissioning of 70 mm² AB (HT) Cable outdoor jointing kit Single Core [Raychem/3M] |
| 140 | Supply, installation, testing and commissioning of 120 mm² AB (HT) Cable outdoor jointing kit 3-Core [Raychem/3M] |
| 141 | Supply, installation, testing and commissioning of 120 mm² AB (HT) Cable outdoor jointing kit Single Core [Raychem/3M] |
| 142 | Supply, Installation, testing and commissioning of 35 mm² AB (HT) Cable outdoor termination kit 3-Core [Raychem/3M] |
| 143 | Supply, Installation, testing and commissioning of 35 mm² AB (HT) Cable outdoor termination kit Single core [Raychem/3M] |
| 144 | Supply, Installation, testing and commissioning of 50 mm² AB (HT) Cable outdoor termination kit 3-Core [Raychem/3M] |
| 145 | Supply, Installation, testing and commissioning of 50 mm² AB (HT) Cable outdoor termination kit Single Core [Raychem/3M] |
| 146 | Supply, Installation, testing and commissioning of 70 mm² AB (HT) Cable outdoor termination kit 3- Core [Raychem/3M] |
| 147 | Supply, Installation, testing and commissioning of 70 mm² AB (HT) Cable outdoor termination kit Single Core [Raychem/3M] |
| 148 | Supply, Installation, testing and commissioning of 120 mm² AB (HT) Cable outdoor termination kit 3-Core [Raychem/3M] |
| 149 | Supply, Installation, testing and commissioning of 120 mm² AB (HT) Cable outdoor termination kit Single Core [Raychem/3M] |
| 150 | Supply, Installation testing and commissioning of LT cable termination Kits of size 3.5 core |
| 151 | Supply, Installation testing and commissioning of LT cable termination Kits of size single core |
| 152 | Supply, Installation testing and commissioning of LT cable joint Kits of size 3.5 core |
| 153 | Supply, Installation testing and commissioning of LT cable joint Kits of size single core |
| 154 | Providing and fixing of GI wire. |
| 155 | Installation of GI wire (G.I wire provided by KPDCL) |
| 156 | Supply, installation, laying and commissioning of 35 mm sq, 11 kV Aerial Bunched Cable 3 Core + Earth , XLPE as per (IS 7098 Part 2 amended upto date) Polycab/Havells/Paramount/Gloster |
| 157 | Supply, installation, laying and commissioning of50 mm sq,11 kV Aerial Bunched Cable 3 Core + Earth , XLPE as per (IS 7098 Part 2 amended upto date) Polycab/Havells/Paramount/Gloster |
| 158 | Supply, installation, laying and commissioning of 70 mm sq,11 kV Aerial Bunched Cable 3 Core + Earth , XLPE as per (IS 7098 Part 2 amended upto date) Polycab/Havells/Paramount/Gloster |
| 159 | Supply, installation, laying and commissioning 95 mm sq,11 kV Aerial Bunched Cable 3 Core + Earth , XLPE as per (IS 7098 Part 2 amended upto date) Polycab/Havells/Paramount/Gloster |
| 160 | Supply, installation, laying and commissioning of 120 mm sq,11 kV Aerial Bunched Cable 3 Core + Earth , XLPE as per (IS 7098 Part 2 amended upto date) Polycab/Havells/Paramount/Gloster |
| 161 | Installation, laying and commissioning of 35 mm sq, 11 kV Aerial Bunched Cable 3 Core + Earth , XLPE as per (IS 7098 Part 2 amended upto date) (Cable to be provided by KPDCL) |
| 162 | Installation, laying and commissioning of50 mm sq,11 kV Aerial Bunched Cable 3 Core + Earth , XLPE as per (IS 7098 Part 2 amended upto date) (Cable to be provided by KPDCL) |
| 163 | Installation, laying and commissioning of 70 mm sq,11 kV Aerial Bunched Cable 3 Core + Earth , XLPE as per (IS 7098 Part 2 amended upto date) (Cable to be provided by KPDCL) |
| 164 | Installation, laying and commissioning of 95 mm sq,11 kV Aerial Bunched Cable 3 Core + Earth , XLPE as per (IS 7098 Part 2 amended upto date)(Cable to be provided by KPDCL) |
| 165 | Installation, laying and commissioning of 120 mm sq,11 kV Aerial Bunched Cable 3 Core + Earth , XLPE as per (IS 7098 Part 2 amended upto date) (Cable to be provided by KPDCL) |
| 166 | Laying, stringing and commissioning of 120 mm sq 3.5 core LT cable |
| 167 | Installation of piercing connectors |
| 168 | Dismantling of 120 mm sq 3.5 core LT Cable |
| 169 | Dismantling of 120 mm sq 3 core LT Cable |
| 170 | Dismantling of 95/85/50/35 mm² 2 Core, 1P 2W Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(1-ɸ, 1N) (one cable spare) |
| 171 | Dismantling 95 mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) (One Spare Cable) |
| 172 | Dismantling 185 mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) (One Spare Cable) |
| 173 | Dismantling 240 mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) (One Spare Cable) |
| 174 | Dismantling 300 mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) (One Spare Cable) |
| 175 | Dismantling 400 mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) (One Spare Cable) |
| 176 | Dismantling 500 mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) (One Spare Cable) |
| 177 | Laying, stringing and commissioning of 95/85/50/35 mm² 2 Core, 1P 2W Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(1-ɸ, 1N) (one cable spare) |
| 178 | Laying, stringing and commissioning 95 mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) (One Spare Cable) |
| 179 | Laying, stringing and commissioning 185 mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) (One Spare Cable) |
| 180 | Laying, stringing and commissioning 240 mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) (One Spare Cable) |
| 181 | Laying, stringing and commissioning 300 mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) (One Spare Cable) |
| 182 | Laying, stringing and commissioning 400 mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) (One Spare Cable) |
| 183 | Laying, stringing and commissioning 500 mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) (One Spare Cable) |
| 184 | Dismantling 35 mm² AB (LT) Cable ( 3 x 35 + 1 x 16 + 1 x 25 insulated) mm² XLPE (1.1kV, 3+1 C, Al) |
| 185 | Dismantling 50 mm² AB (LT) Cable ( 3 x 50 + 1 x 16 + 1 x 35 insulated)mm² XLPE (1.1kV, 3+1 C, Al) |
| 186 | Dismantling 70 mm² AB (LT) Cable ( 3 x 70 + 1 x 16 + 1 x 50 insulated) mm² XLPE (1.1kV, 3+1 C, Al) |
| 187 | Dismantling 120 mm² AB (LT) Cable ( 3 x 120 + 1 x 25 + 1 x 95 insulated) mm² XLPE (1.1kV, 3+1 C, Al) |
| 188 | Laying, stringing and commissioning 35 mm² AB (LT) Cable ( 3 x 35 + 1 x 16 + 1 x 25 insulated) mm² XLPE (1.1kV, 3+1 C, Al) |
| 189 | Laying, stringing and commissioning 50 mm² AB (LT) Cable ( 3 x 50 + 1 x 16 + 1 x 35 insulated)mm² XLPE (1.1kV, 3+1 C, Al) |
| 190 | Laying, stringing and commissioning 70 mm² AB (LT) Cable ( 3 x 70 + 1 x 16 + 1 x 50 insulated) mm² XLPE (1.1kV, 3+1 C, Al) |
| 191 | Laying, stringing and commissioning 120 mm² AB (LT) Cable ( 3 x 120 + 1 x 25 + 1 x 95 insulated) mm² XLPE (1.1kV, 3+1 C, Al) |
| 192 | Installation testing and commissioning of 63 Amp MCCB 4/3 pole with enclosure |
| 193 | Installation testing and commissioning of 100 Amp MCCB 4/3 pole with enclosure |
| 194 | Installation testing and commissioning of 160 Amp MCCB 4/3 pole with enclosure |
| 195 | Installation testing and commissioning of 200 Amp MCCB 4/3 pole with enclosure |
| 196 | Installation testing and commissioning of 400 Amp MCCB 4/3 pole with enclosure |
| 197 | Installation testing and commissioning of 630 Amp MCCB 4/3 pole with enclosure |
| 198 | Dismantling of 63 Amp MCCB 4/3 pole with enclosure |
| 199 | Dismantling of 100 Amp MCCB 4/3 pole with enclosure |
| 200 | Dismantling of 160 Amp MCCB 4/3 pole with enclosure |
| 201 | Dismantling of 200 Amp MCCB 4/3 pole with enclosure |
| 202 | Dismantling of 400 Amp MCCB 4/3 pole with enclosure |
| 203 | Dismantling of 630 Amp MCCB 4/3 pole with enclosure |
| 204 | Installation of 11 Mtr long ST pole available at site |
| 205 | Dismantling of 11 Mtr long ST pole |
| 206 | Installation of 9 Mtr long ST pole available at site |
| 207 | Dismantling of 9 Mtr long ST pole |
| 208 | Installation of 8 Mtr long ST pole available at site |
| 209 | Dismantling of 8 Mtr long ST pole |
| 210 | Installation testing and commissioning of 25/ 63 kVA transformer |
| 211 | Installation testing and commissioning of 100/ 200 kVA transformer |
| 212 | Installation testing and commissioning of 250/315 kVA transformer |
| 213 | Installation testing and commissioning of 400/630 kVA transformer |
| 214 | Dismantling of 25/ 63 kVA transformer |
| 215 | Dismantling of 100/ 200 kVA transformer |
| 216 | Dismantling of 250/315 kVA transformer |
| 217 | Dismantling of 400/630 kVA transformer |
| 218 | Installation, testing and commissioning of 300 mm sq HT single core jointing kit (Note: Cable to be provided by KPDCL) |
| 219 | Supply Installation, testing and commissioning of 300 mm sq HT single core jointing kit. |
| 220 | Dismantling/ installation testing and commissioning of 63/100 kVA distribution transformer inside Dal lake and Transportation from site to Divisional site |
| 221 | Dismantling/ installation testing and commissioning of 200/250 kVA distribution transformer inside Dal lake and Transportation from site to Divisional site |
| 222 | Dismantling/ installation testing and commissioning of 315/400 kVA distribution transformer inside Dal lake and Transportation from site to Divisional site |
| 223 | Providing of power connection to Streetlight (note material if required to be provided by contractor) |
| 224 | Shifting and installation testing and commissioning of street light 25/45/60/70 watt (note material if required to be provided by contractor) |
| 225 | Servicing and maintenance of DG sets including supply of M. oil/ coolant/ filters etc for Genset capacities of 25 kVA, 63 kVA 75 kVA/ 80 kVA, 100 kVA, 250 kVA and 400 kVA DG sets |
| 226 | SITC of 12 V DG set batteries |
| 227 | SITC of 9 Mtr long ST pole |
| 228 | SITC of 8 Mtr long ST pole |
| 229 | Providing and fixing of 1.5mm/2.5mm PVC along with all acessories Please Enable Macros to View BoQ information |