| 1 | Dismantling of flexible pavement (bituminous courses) by mechanical means and disposal of dismantled material up to a lead of 1 kilometre, as per direction of Engineer-in-charge. (420.80x0.735x110.21/107-318.56) |
| 2 | Excavation in foundation in odinary soil (loam clay or sand) including lift upto 1.50M and lead upto 30M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer incharge upto a distance of 30Mfrom the foundation trenches. |
| 3 | Cartage of Ballast, Kankar, Coal, Grit or Sand 1 etc. including loading and unloading but excluding stackings on pucca roads. Upto 8 Km. |
| 4 | Providing concrete for plain/reinforced concrete in (P.C.C grade M 10) (1:3:6) open foundations complete as per drawings and technical all cess, Labour cess, levy, toll fee, royalty. specifications Clause 802, 803, 1202 & 1203. 1/c Contractor Profit but excluding GST. |
| 5 | Plain/reinforced cement concrete (R.C.C grade M 25) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204. I/c all cess. Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. VI (i) For height upto 5m |
| 6 | Steel reinforcement for R.C.C. work including |straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. (107.85x0.735x110.21/107=81.64) |
| 7 | Plain/reinforced cement concrete (P.C.C grade M20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204. I/c all cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. For height upto 5 m |
| 8 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. as per MoRT&H specification clause No. 305 |
| 9 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade: Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture (226.25x0.735x110.21/107=171.28) |
| 10 | Providing & laying Selection no. 1 doob grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same maintenance for 30 days or more till the grass establish properly,as per direction of officer in charge Please Enable Macros to View BoQ information |