| Sl. No. | Item Description |
| 1 | Design, Construction, Testing and Commissioning of Sewage Network including sewer network, Manholes and Pumping Mains |
| 2 | 16.83:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 3 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. |
| 4 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 5 | 15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road |
| 6 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. |
| 7 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar |
| 8 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 9 | OD286711/2025-2026:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil - 2nd depth |
| 10 | OD286708/2025-2026:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil - 3 rd depth |
| 11 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 gradedstone aggregate 40 mm nominal size derived from natural sources) |
| 12 | OD293105/2025-2026:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, using Sulphate Resistant Cement (SRC), admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement - All work upto plinth level - Concrete of M30 grade with minimum cement content of 350 kg /cum |
| 13 | OD286709/2025-2026:Epoxy coated steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 14 | 4.12:Extra for providing and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer's specification . |
| 15 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 16 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 17 | 22.23.1:Providing and applying integral crystalline slurry of hydrophilic in nature forwaterproofing treatment to the RCC structures like retaining walls of the basement,water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels/ subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 partsintegral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 partsintegral crystalline slurry : 1 part water) for horizontal surfaces and applying thesame from negative (internal) side with the help of synthetic fiber brush. The materialshall meet the requirements as specified in ACI-212-3R-2010 i.e by reducingpermeability of concrete by more than 90% compared with control concrete as perDIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystallineslurry shall be capable of self-healing of cracks up to a width of 0.50mm. The workshall be carried out all complete as per specification and the direction of the engineerin-charge. The product performance shall carry guarantee for 10 years against anyleakage.For vertical surface two coats @0.70 kg per sqm |
| 18 | 22.23.2:Providing and applying integral crystalline slurry of hydrophilic in nature forwaterproofing treatment to the RCC structures like retaining walls of the basement,water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels/ subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 partsintegral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 partsintegral crystalline slurry : 1 part water) for horizontal surfaces and applying thesame from negative (internal) side with the help of synthetic fiber brush. The materialshall meet the requirements as specified in ACI-212-3R-2010 i.e by reducingpermeability of concrete by more than 90% compared with control concrete as perDIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystallineslurry shall be capable of self-healing of cracks up to a width of 0.50mm. The workshall be carried out all complete as per specification and the direction of the engineerin-charge. The product performance shall carry guarantee for 10 years against anyleakage.For horizontal surface one coat @1.10 kg per sqm. |
| 19 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 20 | OD286714/2025-2026:Supply of HDPE Pipe PE 100, 8kg, 225mm Outer Dia. conforming to IS 14333 |
| 21 | OD286720/2025-2026:Supply of HDPE Pipe PE 100, 8kg, 280mm Outer Dia. conforming to IS 14333 |
| 22 | OD286727/2025-2026:Supply of HDPE Pipe PE 100, 8kg, 315mm Outer Dia. conforming to IS 14333 |
| 23 | OD286725/2025-2026:Supply of HDPE Pipe PE 100, 8kg, 355mm Outer Dia. conforming to IS 14333 |
| 24 | OD286723/2025-2026:Supply of HDPE Pipe PE 100, 8kg, 400mm Outer Dia. conforming to IS 14333 |
| 25 | OD286719/2025-2026: Supply of HDPE Pipe PE 100, 8kg, 450mm Outer Dia. conforming to IS 14333 |
| 26 | OD286716/2025-2026:Supply of HDPE Pipe PE 100, 10kg, 250mm Outer Dia. conforming to IS 14333 |
| 27 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. |
| 28 | 100.1.2:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not exceeding 3m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. |
| 29 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. |
| 30 | 100.8.2:Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals. |
| 31 | OD286713/2025-2026:Providing Steel barricade of size 1.8x1.2m with safety reflectors on both side of trenches for safety |
| 32 | 2.16.1:Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m |
| 33 | 2.16.2:Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth exceeding 1.5 m but not exceeding 3 m |
| 34 | 100.6.1:Providing steel sheet shoring to the sides of the trenches to depths of above 4.00 m but not exceeding 6.00m using 6 mm M.S. sheet 0.50 M wide stiffen on edges with 50 mm x 50mm x 6 mm M.S. angles driving down vertically on either side one after another in lines and levels with suitable pile driving equipments and accessories to a maximum depth of 0.50 M below the bottom of the proposed excavation 0.5 M above ground level suitably braced by horizontal walling pieces at 75 x 150 mm x 8 mm angles on either side at intervals not exceeding 1.50M and horizontal screw jack type struts at 1.50M intervals and maintaining the shoring till the pipes are laid and works are completed, dismantling, cleaning and restacking for reuse including all labour, hire charges and conveyance for equipments, tools and plants and sundries etc. complete. |
| 35 | OD286721/2025-2026:Laying HDPE pipes (IS : 14333) on land portion including conveying within initial lead and aligning the pipes,Butt/electro-fusion welding using automatic or semi-automatic electrofusion machines/butt welding machines, testing the pipeline thus fabricated to suit the hydraulic working pressure and after testing, aligning the pipeline, lowering the pipe in position into the trenches already made, testing the line to suitable pressure with potable water including flow test before back filling and levelling the trenches including all labour charge, hire for appliances etc., complete but excluding cost of pipe and fittings: 225mm Nominal Outside Diameter Pipes. |
| 36 | OD286722/2025-2026:Laying HDPE pipes (IS : 14333) on land portion including conveying within initial lead and aligning the pipes,Butt/electro-fusion welding using automatic or semi-automatic electrofusion machines/butt welding machines, testing the pipeline thus fabricated to suit the hydraulic working pressure and after testing, aligning the pipeline, lowering the pipe in position into the trenches already made, testing the line to suitable pressure with potable water including flow test before back filling and levelling the trenches including all labour charge, hire for appliances etc., complete but excluding cost of pipe and fittings: 280mm Nominal Outside Diameter Pipes. |
| 37 | OD286717/2025-2026:Laying HDPE pipes (IS : 14333) on land portion including conveying within initial lead and aligning the pipes,Butt/electro-fusion welding using automatic or semi-automatic electrofusion machines/butt welding machines, testing the pipeline thus fabricated to suit the hydraulic working pressure and after testing, aligning the pipeline, lowering the pipe in position into the trenches already made, testing the line to suitable pressure with potable water including flow test before back filling and levelling the trenches including all labour charge, hire for appliances etc., complete but excluding cost of pipe and fittings: 315mm Nominal Outside Diameter Pipes. |
| 38 | OD286715/2025-2026: Laying HDPE pipes (IS : 14333) on land portion including conveying within initial lead and aligning the pipes,Butt/electro-fusion welding using automatic or semi-automatic electrofusion machines/butt welding machines, testing the pipeline thus fabricated to suit the hydraulic working pressure and after testing, aligning the pipeline, lowering the pipe in position into the trenches already made, testing the line to suitable pressure with potable water including flow test before back filling and levelling the trenches including all labour charge, hire for appliances etc., complete but excluding cost of pipe and fittings: 250mm Nominal Outside Diameter Pipes. |
| 39 | OD286724/2025-2026:Installation of PE -250mm-315mm mm dia PE pipe by horizontal directional drilling method in all types of soil above /below water table for pumping /gravity /distribution main including preparing and setting up the plat and equipment, installing new pipe work, testing and commissioning excluding cost of pipe (6 m line pipe with butt joint all related civil /mechanical works like entry /exits pit as necessary. De watering ,drilling stringing, reaming,<br>pulling back the new pipe on the designed alignment and monitoring by approved guidance system. wastage of<br>pipes, proper disposal of drilling fluid /bentonite slurry. Proper back filling og pit and holes by approved borrow material as per specification approved method statement or as directed by engineer in charge. also using Ground penetrating radar survey in corridor with to detect buried utilities on the map of corridor with information of locations and depths to the top of various utilities detected .work to be conducted using 500MHZ and 300MHZ antenna or latest for the best possible resolution and penetration including hydrolic testing |
| 40 | OD286726/2025-2026:Installation of PE -355mm-500mm mm dia PE pipe by horizontal directional drilling method in all types of soil above /below water table for pumping /gravity /distribution main including preparing and setting up the plant and equipment, installing new pipe work, testing and commissioning excluding cost of pipe (6 m line pipe with butt joint all related civil /mechanical works like entry /exits pit as necessary. Dewatering, drilling stringing, reaming, pulling back the new pipe on the designed alignment and monitoring by approved guidance system. wastage of pipes, proper disposal of drilling fluid /bentonite slurry. Proper back filling pit and holes by approved borrow material as per specification approved method statement or as directed by engineer in charge. Also using Ground penetrating radar survey in corridor with to detect buried utilities on the map of corridor with information of locations and depths to the top of various utilities detected. Work to be conducted using 500MHZ and 300MHZ antenna or latest for the best possible resolution and penetration including hydraulic |
| 41 | OD286718/2025-2026:Drilling of 600mm dia horizontal borehole for pipeline under the culverts/roads inc all strata with required length including fixing of 500mm dia M.S casing pipe of minimum 8mm thick as per instruction & regulations of railway authority & under supervision of railway authority including rate including the cost of drilling, welding ,pushing etc complete .But excluding the cost of pipe, valves and other items. etc. Complete with all material, labour, fabrication. Entire work should be as per approved Drawing and as per instructions of concerned authority |
| 42 | OD286710/2025-2026:Supplying and filling in trenches, under footing, below plinth level with Sand Gravel mix in 1:3 ratio indesired thickness not more than 20 cm or as decided by Engineer - in-charge, including compacting each layer by rolling / ramming and watering, consolidating all complete as per drawing and direction ofEngineer - in-charge |
| 43 | OD286712/2025-2026:Supplying and filling with stone dust in trenches, under floors including watering, ramming, consolidating and dressing complete |
| 44 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3graded stone aggregate 20 mm nominal size derived from natural sources) |
| 45 | 100.7.2:Bailing out water with engine and pump set above 5HP up to 10HP including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete. |
| 46 | 100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete. |
| 47 | 100.98.1008:Engaging Coolie. |
| 48 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 49 | OD286706/2025-2026:Providing leak proof connection between manhole to manhole and manhole to sewer chamber etc. complete suitable to site conditions as per the direction of deptl officers in charge |
| 50 | 19.18.3:Supplying and fixing C.I with out frame for manholes:560 mm diameter ( heavy duty) the weight of the cover to be not less than 108 kg |
| 51 | 18.31.5.1:Providing and fixing C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertion etc. (the tail pieces if required will be paid separately):250 mm diameterClass I |
| 52 | 16.78.2:Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBR Value-25 |
| 53 | OD286728/2025-2026:Removal of excess earth by lorry for minimum mechanical conveyance and less cost of earth |
| 54 | OD286730/2025-2026:Design of Sewerage network of length 17.3 km, sewage collection well, Pump house, grit chamber, Sewerage pump, other mechanical, electrical and automation installations etc.. including carrying out topographic survey, preparing BIM based model for sewerage network with all units etc. complete. It includes:1. Conducting topographic survey including establishing TBM, with georeferenced data retrieval.2. Preparation of Hydraulic design and simulation of sewage flow including pumping stations.3. Structural design of Civil Construction units (manholes, well, etc.) including traffic load, buoyancy and floatation analysis.4. Preparation of CAD drawings ready for construction and submission of As-built drawings.5. Social data collection and analysis for the sewage flow.6. Preparation of GIS mapping of sewage system.7. Preparation of 3D model of sewage system.8. SPOT (Sensor Placement Optimisation) analysis of IoT sensors and flow meters as a preventive maintenance mechanism for sewage system.9. Design of pumpset, other mechanical, electrical and instrumentation components for optimisation.10. Planning of traffic regulations for individual habitation and for general public with safety measures.11.Soil investigation in collection well sites and other necessary locations. |
| 55 | OD286729/2025-2026:Construction and fixing of identification blocks of size 75 cmx25 cmx 10 cm in the sewerage network for the identification of alignment of the pipe, cast in concrete mix not leaner than M20 and plastered over with cement mortar 1:4, 12 mm thick and painted over with reflection type enamel paint, including legible writing. |
| 56 | 19.16:Providing orange colour safety foot rest of minimum 6 mm thick plastic encapsulated as per IS: 10910 on 12 mm dia steeel bar conforming to IS:1786, having minimum cross section as 23 mm x 25 mm and over all minimum length 263 mm and width as 165 mm with minimum 112 mm space between protruded legs having 2 mm tread on top surface by ribbing or chequering besides necessary and adequate anchoring projections on tail length on 138 mm as per standard drawing and suitable to with stand the bend test and chemical resistance test as per specifications and having manufactures permanent identification mark to be visible even after fixing including fixing in manholes with 30x20x15 cm cement concrete block 1:3:6 ( 1cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size) Complete as per design |
| 57 | Design, Construction, Testing and Commissioning of Collection Wells with Grit Chamber at Rail Nagar (2.5m Dia ID & 6.6 + 0.5 m Depth) and at STP compound (3.5m Dia ID & 7.0 + 0.5 m Depth) |
| 58 | 20.2.3:Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by percussion drilling using Direct mud circulation (DMC) or Bailer and chisel technique by tripod and mechanical Winch Machine all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap).600 mm dia piles |
| 59 | 20.6.2.1:Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge.Single pile above 50 tonne and upto 100 tonne capacityInitial test (Test Load 2.5 times the Safe capacity) |
| 60 | 20.6.2.2:Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge.Single pile above 50 tonne and upto 100 tonne capacityRoutine test (Test Load 1.5 times the Safe capacity) |
| 61 | 100.3.3.11:Earthwork in open well excavation (in or under water) for wells of diameter above 2.5m and up to 3.50m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift up to 1.5m including neat banking. |
| 62 | 100.3.3.12:Earthwork in open well excavation (in or under water) for wells of diameter above 2.5m and up to 3.50 m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 1.5m to 3.0m including neat banking. |
| 63 | 100.3.3.13:Earthwork in open well excavation (in or under water) for wells of diameter above 2.5m and up to 3.50m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 3.0m to 4.5m including neat banking. |
| 64 | 100.3.3.14:Earthwork in open well excavation (in or under water) for wells of diameter above 2.5m and up to 3.50m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 4.5m to 6.0m including neat banking. |
| 65 | 100.3.3.15:Earthwork in open well excavation (in or under water) for wells of diameter above 2.5m and up to 3.50m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 6.0m to 7.5m including neat banking. |
| 66 | 100.3.3.16:Earthwork in open well excavation (in or under water) for wells of diameter above 2.5m and up to 3.50m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 7.5m to 9.0m including neat banking. |
| 67 | 100.3.5.11:Earthwork in open well excavation (in or under water) for wells of diameter above 3.5m and up to 6.0m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift up to 1.5m including neat banking. |
| 68 | 100.3.5.12:Earthwork in open well excavation (in or under water) for wells of diameter above 3.5m and up to 6.0m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 1.5m to 3.0m including neat banking. |
| 69 | 100.3.5.13:Earthwork in open well excavation (in or under water) for wells of diameter above 3.5m and up to 6.0m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 3.0m to 4.5m including neat banking. |
| 70 | 100.3.5.14:Earthwork in open well excavation (in or under water) for wells of diameter above 3.5m and up to 6.0m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 4.5m to 6.0m including neat banking. |
| 71 | 100.3.5.15:Earthwork in open well excavation (in or under water) for wells of diameter above 3.5m and up to 6.0m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 6.0m to 7.50m including neat banking. |
| 72 | 100.3.5.16:Earthwork in open well excavation (in or under water) for wells of diameter above 3.5m and up to 6.0m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 7.50m to 9.0m including neat banking. |
| 73 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 74 | OD286751/2025-2026:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil - 2nd depth |
| 75 | OD286753/2025-2026:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil - 3 rd depth |
| 76 | OD286752/2025-2026:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil -4th depth |
| 77 | 100.6.1:Providing steel sheet shoring to the sides of the trenches to depths of above 4.00 m but not exceeding 6.00m using 6 mm M.S. sheet 0.50 M wide stiffen on edges with 50 mm x 50mm x 6 mm M.S. angles driving down vertically on either side one after another in lines and levels with suitable pile driving equipments and accessories to a maximum depth of 0.50 M below the bottom of the proposed excavation 0.5 M above ground level suitably braced by horizontal walling pieces at 75 x 150 mm x 8 mm angles on either side at intervals not exceeding 1.50M and horizontal screw jack type struts at 1.50M intervals and maintaining the shoring till the pipes are laid and works are completed, dismantling, cleaning and restacking for reuse including all labour, hire charges and conveyance for equipments, tools and plants and sundries etc. complete. |
| 78 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 79 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining |
| 80 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 81 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform |
| 82 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 83 | OD293146/2025-2026:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, using Sulphate Resistant Cement (SRC), admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement - All work upto plinth level - Concrete of M30 grade with minimum cement content of 350 kg /cum |
| 84 | 5.33.2.1:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cementAll work above plinth level upto floor V levelConcrete of M25 grade with minimum cement content of 330 kg /cum |
| 85 | OD286754/2025-2026:Epoxy coated steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 86 | 4.12:Extra for providing and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer's specification . |
| 87 | 4.15:Extra for laying concrete in or under water and or liquid mud including cost of pumping or bailing out water and removing slush etc. complete. |
| 88 | 19.16:Providing orange colour safety foot rest of minimum 6 mm thick plastic encapsulated as per IS: 10910 on 12 mm dia steeel bar conforming to IS:1786, having minimum cross section as 23 mm x 25 mm and over all minimum length 263 mm and width as 165 mm with minimum 112 mm space between protruded legs having 2 mm tread on top surface by ribbing or chequering besides necessary and adequate anchoring projections on tail length on 138 mm as per standard drawing and suitable to with stand the bend test and chemical resistance test as per specifications and having manufactures permanent identification mark to be visible even after fixing including fixing in manholes with 30x20x15 cm cement concrete block 1:3:6 ( 1cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size) Complete as per design |
| 89 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . |
| 90 | 13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand) |
| 91 | 22.23.1:Providing and applying integral crystalline slurry of hydrophilic in nature forwaterproofing treatment to the RCC structures like retaining walls of the basement,water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels/ subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 partsintegral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 partsintegral crystalline slurry : 1 part water) for horizontal surfaces and applying thesame from negative (internal) side with the help of synthetic fiber brush. The materialshall meet the requirements as specified in ACI-212-3R-2010 i.e by reducingpermeability of concrete by more than 90% compared with control concrete as perDIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystallineslurry shall be capable of self-healing of cracks up to a width of 0.50mm. The workshall be carried out all complete as per specification and the direction of the engineerin-charge. The product performance shall carry guarantee for 10 years against anyleakage.For vertical surface two coats @0.70 kg per sqm |
| 92 | 22.23.2:Providing and applying integral crystalline slurry of hydrophilic in nature forwaterproofing treatment to the RCC structures like retaining walls of the basement,water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels/ subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 partsintegral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 partsintegral crystalline slurry : 1 part water) for horizontal surfaces and applying thesame from negative (internal) side with the help of synthetic fiber brush. The materialshall meet the requirements as specified in ACI-212-3R-2010 i.e by reducingpermeability of concrete by more than 90% compared with control concrete as perDIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystallineslurry shall be capable of self-healing of cracks up to a width of 0.50mm. The workshall be carried out all complete as per specification and the direction of the engineerin-charge. The product performance shall carry guarantee for 10 years against anyleakage.For horizontal surface one coat @1.10 kg per sqm. |
| 93 | 13.52.2:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On concrete work |
| 94 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 95 | OD286755/2025-2026:Removal of excess earth by lorry for minimum mechanical conveyance and less cost of earth |
| 96 | 100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete. |
| 97 | 100.7.2:Bailing out water with engine and pump set above 5HP up to 10HP including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete. |
| 98 | 100.98.1008:Engaging Coolie. |
| 99 | 19.18.1:Supplying and fixing C.I with out frame for manholes:455 x 610 mm rectangular C.I cover ( light duty ) the weight of the cover to be no less than 23 kg |
| 100 | 100.36.1:Filling water with 5000 litre tankers fited in lorry and conveying water from a distance of 5 km (average) to the reservoir site and pumping the water into the reservoir of height not less than 3 m using 5 HP diesel engine pump set , hire for tanker lorry, tools and other appliences and cost of water etc. complete. |
| 101 | OD286756/2025-2026:Supply , installation & commissioning of the manually operating chain pulley mechanism of maximum 1 ton capacity to lift the pumpsets and other equipments from a height not less than 12m including all accessories, etc. |
| 102 | OD286757/2025-2026:Bar Screen- Supply and installation, of manual bar screen, MS ; epoxy frame to be fitted in bar screen chamber of specified width, with MS flat bars and 20 mm c/c gap between bars and provided with mechanical opening and closing arrangements.. The frame to be mounted on the chamber and provided with MS rake arm with racks for removal of collected solids and trough to be provided for transfer of the collected solids.Flow Rate and height should be as specified. Angle of Inclination: 45 Degree,Spacing: 20mm, Bar Size: 50x10 mm |
| 103 | 10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 104 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. |
| 105 | Design, Construction, Testing and Commissioning of Sewage Network - MECHANICAL ITEMS |
| 106 | OD286750/2025-2026:Sewage transfer pump - Supply, Installation, Commissioning, testing and trial run of submersible sewage handling type pump, with specified discharge and head and of reputed make, 5 HP. Including suction and delivery pipes,starter,induction motor,capacitor etc complete as per the direction of engineer incharge. |
| 107 | Design, Construction, Testing and Commissioning of Sewage Network -ELECTRICAL AND INSTRUMENTATION WORKS |
| 108 | OD328850/2025-2026:Supply, installation, testing and commissioning of a comprehensive instrumentation, monitoring and IoT based telemetry system for monitoring sewage in the collection well and the 250 mm OD pumping main conveying sewage from the collection well to the STP, consisting of electromagnetic flow meter with remote transmitter suitable for 250 mm OD pipeline, industrial pressure transmitters, ultrasonic level sensor for wastewater level measurement in collection well/manhole, multiparameter water quality sensors (pH, turbidity, TDS/conductivity), digital flow/pressure/quality indicators with totaliser and local display, IoT based GSM/GPRS telemetry data logger with antenna, data storage and cloud/SCADA compatibility, weatherproof instrument panel, junction boxes, power supply units, signal and power cables, mounting arrangements and all associated accessories complete. The system shall provide continuous measurement, recording, transmission and display of flow, pressure, level and water quality parameters with remote data logging and transmission through GSM/IoT technology or higher, including GIS mapping of monitoring locations, software configuration, dashboard setup and integration with the central monitoring/control system, including all fittings, calibration, installation, testing, commissioning and training of operating personnel, complete as directed by the Engineer-in-Charge. |
| 109 | OD328851/2025-2026:Supplying, installing, testing and commissioning of IoT enabled sewer monitoring instrumentation system consisting of ultrasonic level sensor, industrial pressure transmitter (0 -10 bar), multiparameter water quality sensor package (pH, turbidity, TDS etc) , submersible Doppler velocity sensor/electromagnetic flow measurement arrangement for wastewater flow monitoring in partially filled sewer pipes/manholes, IoT based GSM/GPRS/4G telemetry data logger with antenna, data storage and SCADA/cloud compatibility, digital flow/pressure/quality indicator with totaliser and local display panel, including weatherproof instrument panel, junction boxes, power supply units, signal cables, mounting arrangements and all necessary accessories, complete with GIS mapping, software configuration, dashboard setup and integration with central control/SCADA system, for installation in critical manholes/collection wells of sewerage network, including calibration, testing, commissioning and training of operating personnel, complete as directed by the Engineer-in-Charge. |
| 110 | OD286744/2025-2026:Supply, installation and commissioning of diesel generator- 15KVA,including the cost for basement for fixing the generator and cost.for the roofing of generator.( MK 2405, DSR and market rate .CPOH included) |
| 111 | OD286747/2025-2026:Electrical Works: Supply and installation of accessories for electrical connection and control units for collection wells including foundations. Powder coated MCC Panel shall be Non compartmentalized free standing floor mounted, dust and vermin proof, with reinforcement of suitable size angle iron, channel, T -iron flats as required. Panel shall be suitable for 415V, 3-Phase,50 Hz incomer. Switchgear components to include, but not limited to, MCCB for incomer and for each switchgear, suitable OLR and contactor provisions to be given as per guidelines of the Electrical authority. Panel to be fabricated based on the Motor Load List as given in the technical specifications AC: MS powder coated panel with switchgear components as per motor load list, fixed, floor mounted and non compartmentalized pane. Interconnecting Works ? Outgoing feeders from AC panel to each prime mover will be based on EI guidelines. Cables to be suitably protected either through (a) PVC conduit or (b) armored cables as appropriate Cabling includes glanding and termination for each prime mover. Cables should not be run on the ground or directly on the walls. Cables to be mounted on suitable runners / cable trays / PVC conduits as appropriate. All interconnecting cabling and glanding , termination accessories, earthing as per specifications. |
| 112 | OD286743/2025-2026:Supply, installation and commissioning of solar units for collection wells |
| 113 | Construction of Pump House, watchman/Operator room |
| 114 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 115 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 116 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 117 | 5.33.2.1:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cementAll work above plinth level upto floor V levelConcrete of M25 grade with minimum cement content of 330 kg /cum |
| 118 | OD286739/2025-2026:Epoxy coated steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 119 | 4.12:Extra for providing and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer's specification . |
| 120 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 121 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform |
| 122 | 13.9.1:Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement.12 mm cement plaster |
| 123 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 124 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete |
| 125 | 13.60.1:Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work |
| 126 | 9.120.2:Providing and fixing factory made panel PVC door shutter consisting of frame made out of M.S. tubes of 19 gauge thickness and sized of 19 mm x 19 mm for styles and 15x15 mm for top & bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame covered with 5 mm thick heat moulded PVC 'C' channel of size 30 mm thickness, 70 mm width out of whicj 50 mm shall be flat and 20 mm shall be tapered in 45 degree angle on both side forming styles and 5mm thick, 95 mm wide PVC sheet out of which75 mm shall be tapered in 45 degree on th inner side to form top and bottom rail and 115 mm wide PVC sheet out of which 75 mm shall be flat and 20 mm shall be tapered on both sides to form lock rail. Top, bottom and lock rails shall be provided both side of the panel. 10 mm (5 mmx2) thick, 20 mm wide cross PVC sheet be provided as gap insert for top rail & bottom rail. paneling of 5 mm thick both side PVC sheet to be fitted in the M.S. frame welded /sealed to the styles & rails with 7 mm (5 mm + 2 mm ) thick x 15 mm wide PVC sheet beading on inner side, and joined together with solvent cement adhesive. An additional 5 mm thick PVC strip of 20 mm width is to be stuck on the interior side of the 'C' Channel using PVC solvent adhesive etc. complete as per direction of Engineer -in-charge, manufacture's specification & drawing.30 mm thick pre laminated PVC door shutters |
| 127 | 9.119:Providing and fixing factory made P.V.C. door frame of size 50x47 mm with a wall thickness of 5 mm, made out of extruded 5 mm rigid PVC foam sheet, mitred at corners and joined with 2 Nos. of 150 mm long brackets of 15x15 mm M.S. square tube, the vertical door frame profiles to be reinforced with 19x19 mm M.S. square tube of 19 gauge, EPDM rubber gasket weather seal to be provided through out the frame. The door fame to be fixed to the wall using M.S. screws of 65/100 mm size, complete as per manufacturer's specification and direction of Engineer-in Charge. |
| 128 | 8.31:Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in- Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigment of matching shade complete. |
| 129 | 11.37:Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/sqm including pointing the joints with white cement and matching pigment etc., complete |
| 130 | 11.41.2:Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 600 x 600 mm. |
| 131 | OD286740/2025-2026:Providing electrical wiring, earthing and control panel for light, Plug points and supplying of lights, plug points and switch boards of approved make. |
| 132 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 133 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 134 | 12.1.1:Providing corrugate G.S. sheet roofing including vertical/ curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete ( up to any pitch in horizontal / vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.1.00 mm thick with zinc coating not less than 275 gm/m2 |
| 135 | 17.2.1:Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever), conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required:W.C. pan with ISI marked white solid plastic seat and lid |
| 136 | 17.7.3:Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require:White Vitreous China Wash basin size 550x400 mm with a pair of 15 mm C.P. brass pillar taps |
| 137 | 50.9.15.1:Supplying and fixing 200 mm Aluminium aldrop |
| 138 | OD286742/2025-2026:Supplying and fixing Syntex tank and laying PVC pipes, valve, taps, etc. for plumbing arrangements to the WC, including all materials and all labour charges, taking necessary KWA water connection etc complete. |
| 139 | 16.68:Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M - 30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. |
| 140 | OD286741/2025-2026:Providing and fixing 500 L FRP septic tank inlcuding earthwork excavation, fixing in position and connection to WC outlet including all plumbing works, foul trap,etc complete. as per the direction of Engineer-in-charge |
| 141 | Constrution of compound wall, fixing gate at new well zone at rail nagar |
| 142 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. |
| 143 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete |
| 144 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. |
| 145 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 146 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 147 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 148 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 149 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts |
| 150 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 151 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 152 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete |
| 153 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 154 | 13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) |
| 155 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete |
| 156 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work |
| 157 | 13.71:Lettering with black Japan pint of approved brand and manufacture |
| 158 | Providing house hold sewer connections |
| 159 | OD286733/2025-2026:Providing sewer connection upto 5m including Supply and laying of 110mm PVC pipe, fencing, dismantling and relaying interlocking paver tiles, earth work excavation, construction of grit chamber inside compound. refilling trench, etc |
| 160 | OD286732/2025-2026:Providing sewer connection upto 5m including Supply and laying of 110mm PVC pipe, fencing, dismantling bituminous surface, earth work excavation, construction of grit chamber inside compound. refilling trench, road restoration works etc |
| 161 | OD286735/2025-2026:Providing sewer connection upto 5m including Supply and laying of 110mm PVC pipe, fencing, dismantling CC road, earth work excavation, construction of grit chamber inside compound. refilling trench, road restoration works etc |
| 162 | OD286738/2025-2026:Providing sewer connection upto 5m including Supply and laying of 110mm PVC pipe, fencing, earth work excavation, construction of grit chamber inside compound. refilling trench, road restoration works etc in earthen shoulder |
| 163 | OD286736/2025-2026:Laying 110mm PVC pipe for additional length after 5M for interlocking road (including fencing removing and placing interlocking excavation and supply and laying 110mm PVC pipe) |
| 164 | OD286734/2025-2026:Laying 110mm PVC pipe for additional length after 5M for Bituminous surface (including fencing, Road cutting, excavation and supply and laying 110mm PVC pipe, fixing road) |
| 165 | OD286731/2025-2026:Laying 110mm PVC pipe for additional length after 5M for earthen shoulders (including fencing, Road cutting, excavation and supply and laying 110mm PVC pipe, fixing road). |
| 166 | OD286737/2025-2026:Laying 110mm PVC pipe for additional length after 5M for Concrete roads (including fencing, Road cutting, excavation and supply and laying 110mm PVC pipe, fixing road) |
| 167 | Provision for side protection work in cases where there is chances for land slide and damage to nearby compound walls and buildings. |
| 168 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 169 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 170 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 171 | 6.4.2:Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in:Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 172 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 173 | 13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) |
| 174 | Road Restoration -MORTH |
| 175 | 3.1:Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 metres. |
| 176 | 4.2.A.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-III -For lower sub-base - Mix in Place Method |
| 177 | 4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 178 | 5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means. |
| 179 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 180 | 5.3.2.a:Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with a bituminous binder (VG 30), transported to the site, laid over a previously prepared surface with paver finisher to the required grade, level, and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction For Grading II - (19 mm nominal size) |
| 181 | 5.6.2.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size) |
| 182 | 8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes. |
| 183 | 8.35:Providing and fixing reflective road studs (Raised Pavement Marker) of ' category A' made out of ASA/HIPS/ABS moulded body with shanks and conforming to ASTM D 4280, strong enough to support a load of more than 13.635 T when tested in accordance with ASTM D 4280, reflective panel confirming to ASTM D 788, and reflectivity conforming to clause 804.4. including installation, drilling, fixing with adhesive etc. with 2 years warranty for the road stud as well as for in field performance as per clause 804.7.3 Road Markers/Road Stud with Lense Reflector :- |
| 184 | Road Restoration -MORD |
| 185 | 3.5.3:Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 |
| 186 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i) For Grading I Material |
| 187 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead |
| 188 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 |
| 189 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 190 | 75.5.9.1.2pb:20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. Case - I By Manual Means (II) Bitumen (S-65) |
| 191 | 75.5.12.A.3.2pb:Seal Coat - Manual Means - Type C - Bitumen S-65 - Packed Bitumen Rates Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 A. By Manual Means Case III : Type C (II) Bitumen (S-65) |
| 192 | 10.20:Road Markers/Road Stud with Lens Reflector Providing and fixing of road stud 100 x 100 mm die cast in aluminium, resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling holes 30 mm upto a depth of 600 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS:873 (Part 4) 1973. |
| 193 | OD286759/2025-2026:Supply of interlocking tiles 100 mm thick(50% of old paver blocks may be used) |
| 194 | OD286760/2025-2026:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications & RCC Grade M20 - Using Concrete Mixer - (Without formwork) |
| 195 | OD286761/2025-2026:Laying cement concrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. |
| 196 | Operation and Maintanance Charge for 5 years (Pump House) |
| 197 | OD312317/2025-2026:ANNUAL OPERATION AND MAINTENANCE COSTS -PUMP HOUSE(For chemicals, fuel for DG , Operator at pump house, etc. excluding Power charges). O and M - 1st year after commissioning |
| 198 | OD312318/2025-2026:ANNUAL OPERATION AND MAINTENANCE COSTS -PUMP HOUSE(For chemicals, fuel for DG , Operator at pump house, etc. excluding Power charges). O and M - 2nd year after commissioning |
| 199 | OD312321/2025-2026:ANNUAL OPERATION AND MAINTENANCE COSTS -PUMP HOUSE(For chemicals, fuel for DG , Operator at pump house, etc. excluding Power charges). O and M - 3rd year after commissioning |
| 200 | OD312326/2025-2026:ANNUAL OPERATION AND MAINTENANCE COSTS -PUMP HOUSE(For chemicals, fuel for DG , Operator at pump house, etc. excluding Power charges). O and M - 4th year after commissioning |
| 201 | OD312329/2025-2026:ANNUAL OPERATION AND MAINTENANCE COSTS -PUMP HOUSE(For chemicals, fuel for DG , Operator at pump house, etc. excluding Power charges). O and M - 5th year after commissioning Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
| 5 | Click here to download tender document | Tender Documents |
| 6 | Click here to download tender document | Tender Documents |
| 7 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail