|
| 1 | Electronic device for automation of starter with all required fittings and features like:-Motor ON/OFF through missed call -Motor ON/OFF through SMS -Inbuild preventer and auto starter -Suitable every single/three phase motor starter -Inbuilt star delta timer -Dry run prevention -Overload prevention -Real time clock(RTC) -One year guarantee and ensured customer service at site when ever required |
| 2 | A)Pump & MotorSupply, erection, testing and commissioning of KWA pre-qualified reputed make open well submersible motor pump set, coforming to IS 8034/2002 and amended thereafter and BEE3 Star of rated discharge, and Head, with Bronze or Cast SSimpeller, Brass Screws and CI FG 200 grade Pump Bowl / Diffuser with ISI mark.The pump shall be directly coupled to a continious rated two pole suitable wet type vertical squirrel cage induction motor as per IS 9283,/ 1995 as amended thereafter,siutable for operation in AC 3 phase 415 V + /- 10%, 50 Hz + / - 5%,Duty Conditions :Discharge - 17.77 lpsTotal Head - 110 mSuction Head - 12 mLength of suction Pipe - 12 mB)StarterThe MU-G50 FASD 50HP Fully Automatic Star Delta Starter Supporting motors up to 50HP with a relay range of 45-75A, at a rated voltage of 415V and a frequency of 50Hz, Equipped with a \\"No-Trip\\" mechanism, as per IEC 60947-1/IS, Rated CoilVoltage240V , of approx. size 455mm x 345mm x 485mm \\"automatic star delta starter\\" including 3 pole magnetic contactor with under voltage release - 3 Nos., CT operated Ammeter(65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector swicth, Minature Circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm / 4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor. as per IE rules and code of practice, for working 40 HP submersible pump sets at a time , considering all practical losses in Voltage andefficiency.C)Panel boardSupply, erection, testing and commissioning of one number cubical type floor mounted MS fabricated dust and vermin proof common control panel board , suitable for providing control system for running these two motor pump sets at a time, suitable capacity MCCBs , providing suitable size Aluminium bus bar , provided with a common earth bus for the entire panel and inter connect with the MCCBs asper IE rules and code of practice. The panel shall be fitted on a common base frame on suitable foundation, for working 40 HP submersible pump sets at a time.D)Cabling workSupply, laying, testing and commissioning of 185 sqmm x 3.50 core XLPE cables for the above pump set from panel board to starter and Copper Cable not below 25sqmm , 6 lines, from starter to motor, for working 40 HP Centrifugal pump sets at atime. considering energy conservation, including providing necessary Cable Tray of MS fabrication in side the building and sand filled brick trench, additional length allowance as loop for future repaire as per the direction of Engineer.E)EarthingSupply of all materials and providing suitable earthing byusing suitable size pipe/plate eartihing Gl/copper strip buried in ground and giving double earthing to motor, starter, panel board etc. as per IE standards.F)CapacitorSupply, erection, testing and commissioning of heavy dutyAPF capacitor for the motor to get a power factor above 0.95. The capacitor shall confirm to IS 2834G)ValvesSupply of suitable size best quality heavy duty ISI marked CIdouble flanged sluice valve and Non retum valve of 150 mm dia. 1.60 PN pressure rating. Fitting of valves shall include proper RCC support , for Non return valves and Sluice Valves , of reputed make.H)Suction and delivery pipe connectionsSupply and fitting of 150mm dia. best quality C class GI erection pipe, for a total length of 10 m. suitable for the above pump set with suitable flanges, bends, nut and bolts IR sheet packing etc. complete (erection pipe shuould be of 2m each with flanged joints, welded firmly inside and out side for the flange, to hold the heavy load, and for facilitating lifting and erection of motor inside the pump house) and connecting the delivery side ofthe pump with the valves and suitable specials to connect with the pumping main.I)General ConditionsWarranty - 2 years (rate inclusive of 2 year warranty and maintenance during a period of 2 years from the date of commissioning), for Motor pump set and acessoriessupplied. |
| 3 | Supply and installation of 185 Sq mm XLPE cable of 3.50 core additional cable |
| 4 | Supply and installation of 25 Sq. mm additional cable beyond the initial supply of 2x10 m |
| 5 | Supplying, conveying and fixing GI pipes of Class C complete with G I fittings including all cost of cutting, sand papering,welding, clambing etc complete- 150mm dia nominal bore. Fabrication work for connecting with the existing pumping main beyond the initial supply of 2x10 m |
| 6 | Painting of OHSR, Well and Pump houseProviding and fixing double scaffolding system (Cup lock type ) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps andstaircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and / or pointing and / or applying chemical and removing it thereafter. The scaffolding system shall bestiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-Charge.Note: - ( 1) The evaluational area of the scaffolding shall be measured for payment purpose, (2) The payment will be made once only for execution of all items of such works |
| 7 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete |
| 8 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm |
| 9 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work |
| 10 | Water Quality Testing &LetteringTesting water sample from the source of scheme at any Government laboratory and submitting the report- both physical and bacteriological parameters. |
| 11 | Lettering with black Japan pint of approved brand and manufacture Please Enable Macros to View BoQ information |