| 1 | Excavation including loading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect in Hard/dense soil. |
| 2 | Earthwork in rough (borrow area)excavation for embankments in hard soil,morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction)and breaking of clods,sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller,sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98%of Standard Proctor's density within itial lift of1.5m(Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.(a) With initial lead of 250 m |
| 3 | Compaction of earth or highly weathered strata By mechanical equipment such as sheep foot roller/pneumatic tyred roller/vibro compactor /vibro sheep foot compactor required as per site condition to obtain dry density of (ii) at least 98% of Standard Proctor's density |
| 4 | Wateringof earth including cost of carriage of water when sourceof water is (a) up to 1 Km |
| 5 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm |
| 6 | Providing and Laying in position of Cement concrete Design mix M-20 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone upto 20mm. |
| 7 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Retaining wall, counterfort, abutment, wing walls up stream or down stream slope facings of dams and open faces of construction joints etc. |
| 8 | Providing and Laying in position of Cement Concrete Design mix M-30 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; (For mix design Cement content considered 428 kg/ cum of concrete) (d) 20 mm |
| 9 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawingincluding cost of binding wire and all leads and lifts using.Tor or ribbed bars(IS :1786-1985) |
| 10 | Construction of un-reinforced , plain cement concrete pavement M30 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cement as per Clause 602, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a in fully automatic Batching Plant and transported to site in transit mixer for having continuous agitated mixer, manufactured as per approved mix design including pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid with a Fixed Form Paver (laying and fixing of 150 micron thick polythene Film and finished in continuous operation including provision of contraction and expansion, construction joints, applying |
| 11 | debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately). |
| 12 | Centering and shuttering for piers, galleries, barrels, intake well, sluice well upto 3.0m height from base/floor level (To achieve F2 finish) |
| 13 | Add extra over item No. 1 c , 1d, 2 and 3 for centering and shutterring for each additional 1 m height or part thereof above initial height of 3.0m from base/floor level. |
| 14 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. |
| 15 | Providing and fixing 20mm thick compressible fibre board in expansion joint complete. |
| 16 | Providing, laying and fixing in position RCC spun or hume pipe withcollars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints including Labour Charges 600 mm dia Please Enable Macros to View BoQ information |