| 1 | LABOUR |
| 2 | (124) Insertion of one HT PSC pole in existingOH line including digging & backfillingpit in ordinary soil, fitting cross arm,insulators, binding etc., drawingsufficient length of GI earth leads to theground for earthing (excluding provisionof earthing). |
| 3 | (128) Additional rate for excavation of one Pitfor HT Pole/HT Stay in Hard Laterite. |
| 4 | (163) Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns)including digging separate pit(0.45x0.45x1.5m) at standard distanceaway from the pole/structure in ordinarysoil & backfilling. |
| 5 | (204) Erecting one LT PSC Pole in positionincluding digging & back filling pit inordinary soil. |
| 6 | (205) Providing Stay for LT poles includingdigging & back filling pit in ordinarysoil. |
| 7 | (209) Additional rate for excavation of one Pitfor LT Pole/LT Stay in Hard Laterite. |
| 8 | (402) Renewal of existing damaged/old LTPSC/RCC (single phase line) pole withnew PSC pole in place includingexcavation of pole pit, erection of newpole, backfilling pit and refitting of allitems except street light fitting etc. andconveyance of all materials except pole. |
| 9 | (407) Renewal of existing damaged/broken oldLT stay in existing stay rod. |
| 10 | (327) Renewal of existing damaged/broken old11kV Stay to the existing stay rod. |
| 11 | (409) Renewal of existing damaged/old LTStrut of any type with new PSC strut inplace including excavation of pit,erection of new strut, backfilling,consolidating, dismantling and refittingof all items and conveyance of all materials except pole. |
| 12 | (421) Straightening one slanted LT pole afterunbinding the line and binding the lineafter work. |
| 13 | (451) Disconnecting and lowering down thesingle phase WP service connection withguy wire from the OH line andreconnecting the same after completingthe line work. |
| 14 | (452) Disconnecting and lowering down thethree phase WP service connection withguy wire from the OH line andreconnecting the same after completingthe line work. |
| 15 | (554) Dismantling (without damage) one LTPSC/RCC pole after disconnecting stays,strut etc. attached thereon and stackingthe same. |
| 16 | (565) Dismantling (without damage) one kmLT single phase 2 wire OH lineconductor by dismantling cross arms,insulators and stacking the conductors inrolls properly. |
| 17 | (566) Dismantling (without damage) one kmLT three phase 4 wire OH line conductorby dismantling cross arms, insulatorsand stacking the conductors in rollsproperly. |
| 18 | (567) Dismantling (without damage) one kmLT additional conductor line bydismantling cross arms, insulators andstacking the conductors in rolls properly. |
| 19 | (610) Dismantling one ordinary streetlight/CFL/LED fitting from existing poleand refitting the same on newly erectedpole including disconnecting andreconnecting wires. |
| 20 | (702) Labour charges for loading HT PSC polefrom the stacking place and unloadingthe same at work site (transportation byany vehicle). |
| 21 | (706) Labour charges for loading LT PSC polefrom the stacking place and unloadingthe same at work site (transportation byany vehicle). |
| 22 | (726) Transporting poles by hired vehicle to adistance upto 5km and carrying upto 4numbers of poles excluding loading&unloading charges. |
| 23 | (1105) Stringing of 1.1 kV Aerial bunchedcable of size 3 x 70 + 1 x 16+1x 50sqmm with bare/insulated Messenger through existing poles |
| 24 | (1106) Stringing of 1.1 kV Aerial bunchedcable of size 1 x 25 + 1 x 25 sqmm withbare/insulated Messenger throughexisting poles |
| 25 | (1109) Erection of Anchor clamp / dead endclamp for LT ABC of any size |
| 26 | (1110) Erection of suspension clamp for LTABC of any size |
| 27 | (1114) Providing Cable Tie |
| 28 | (1115) Installing One No. Insulation piercingconnector of size Main :16 to 95,Tap:1.5 to 16 Sq.mm |
| 29 | (1116) Installation of Insulation piercingconnector for main to service line main:16-95 sqmm, Tap : 4-35 sqmm |
| 30 | (1117) Installation of Insulation piercingconnector for main to service line main:25-95 sqmm, Tap : 25-95 sqmm |
| 31 | (1126) Installation of Pre-insulated lugs for16sqmm |
| 32 | (1129) Installation of Pre-insulated lugs for70sqmm |
| 33 | (1134) Providing End Caps |
| 34 | (1141) Installing One No. 4 way SatelliteConnector of size Main :16 to 95, Tap:4to 35 Sq.mm to the LT AB cable ofStandard size |
| 35 | (2014) Transporting LT ABC by hired vehicleto a distance up to 5 km and carring upto 2 drum including loading and unloading using crane |
| 36 | Total of BoQ1 Please Enable Macros to View BoQ information |