|
| 1 | Note : 1. The contractor should visit at site before quoting the tender to know the working condition of the station. 2. All requisite safety measures adopted by contractor on site. 3. The contractor shall provide and deploy sufficient electrician ( as approved by GE/ Engineer in charge) shall report at 9.00 hrs to JE E/M / Engineer in charge to collect the complaints in working days and complete the same complaint within 24 Hrs. 4. The complaints shall be rectified with in 24 Hrs if the complaints is/ are not attended / not completed with in 24 Hrs ( except repair/ replacement of major items) recovery will be done Rs 500 per complaint per day. 5 For major parts like rplacement of MCB Dbs, MCCBs should be rectified within 5 working days, if the contractor not rectify within time then recovery will be done Rs 1000 per complaint per day. 6 If contractor failed to provide their electrician or attend the complaints then recovery will be doneRs 1000 per day. |
| 2 | Material and Labour in replacement of old unserviceable sub main wiring using 4 runs of 10 sq mm FRLS PVC insulated copper conductor 1100 Volts grade conforming to IS specification drawn through in and including PVC casing and caping surface on wall along with 1 runs of 10 sq mm PVC insulated copper conductor FRLS cable as earth lead connected to common earth dolly and including taking down old unserviceable wiring and including making good the existing disturbed surface using wall care putty and matching colour emulsion paint. complete all as specified and directed by Engr-in-charge. |
| 3 | All as per item no 02 here in before but of size 4 run of 6 sqmm and 1 run of 6 sqmm for earth lead complete all as specified and directed by EIC. |
| 4 | All as per item no 02 here in before but of size 4 run of 4 sqmm and 1 run of 4 sqmm for earth lead complete all as specified and directed by EIC. |
| 5 | All as per item no 02 here in before but in of size 2 run of 2.5 sqmm and 1 run of 2.5 sqmm for earth lead Note for item No. 2 to 5:-(i) One run of PVC casing and caping along with 5 runs / 3 runs of respective size of PVC insulated copper conductor cable will be measured as one unit.(ii) Strictly follow the proper colour code red/yellow/blue for phase ,black for neutral and green for earth. |
| 6 | Material and Labour in replacement of old unserviceable sub main wiring using 2 runs of 10 sq mm FRLS PVC insulated copper conductor 1100 Volts grade conforming to IS specification drawn through in existing conduit surface on wall along with 1 run of 10 sq mm PVC insulated copper conductor FRLS cable as earth lead connected to common earth dolly and including taking down old unserviceable wiring and including making good the existing disturbed surface using wall putty and matching colour emulsion paint. complete all as specified and directed. |
| 7 | All as per item No.06 here in before but in size 2 runs of 6 sqmm and 1 run of 6 sqmm as earth |
| 8 | All as per item No.06 here in before but in size 2 runs of 4 sqmm and 1 run of 4 sqmm as earth |
| 9 | All as per item No.06 here in before but in size 2 runs of 2.5 sqmm and 1 run of 2.5 sqmm as earthNote for Srl item no 06 to 09 1. Wire shall be drawn though existing conduict.2. 3 run of cables shall be measured as one unit.3. Colour code shall be followed. |
| 10 | Supply and fix in replacement old unserviceable wall mounted 10 W 2 ft LED batten, making connection to ceiling rose to fitting with 3 core 1 sqmm copper conductor complete all as specified and directed. |
| 11 | Supply and fix in replacement of old unserviceable wall mounted 20 W LED 4ft white batten and including connecting up 3 core flexible copper conductor cable suitable size from fitting to ceiling rose/connection terminals all as specified and directed |
| 12 | Supply and fix in replacement 9W LED spot light ideal for wardrobes, furniture lighting, displays & interior decorations including connecting up 3 core copper conductor cable of suitable size from fitting to ceiling rose/connection terminals all as specified and directed |
| 13 | Supply and fix in replacement LED flat downlighter 18W white in round including connecting up 3 core 1 sqmm copper conductor cable from fitting to ceiling rose/connection terminals all as specified and directed. |
| 14 | Supply and fix in replacement LED flat downlighter 12W white in round profile including connecting up 3 core 1 sqmm copper conductor cable from fitting to ceiling rose/connection terminals all as specified and directed. |
| 15 | Supply and fix in replacement square recess mounted LED edge lit slim downlight 6W white luminous including connecting up 3 core 1 sqmm copper conductor cable from fitting to ceiling rose/connection terminals all as specified and directed. |
| 16 | Supply and fix in replacement slim design LED 9W white recessed square including connecting up 3 core 1 sqmm copper conductor cable from fitting to ceiling rose/connection terminals all as specified and directed |
| 17 | Supply and fix in replacement slim design LED 9W white recessed round polycarbonate housing down lighter including connecting up 3 core 1 sqmm copper conductor cable from fitting to ceiling rose/connection terminals all as specified and directed. |
| 18 | Supply and fix in replacement 9/10 W white/warm white energy saving, surface mounted, decorative bulk head LED luminaire , making connection to ceiling rose to fitting with 3 core 1 sqmm copper conductor complete all as specified and directed. |
| 19 | Supply and fix in replacement Recess/Surface full 36 W (2' x 2') with all accessories pre-wired and including connecting up with three core twisted flexible copper conductor cable with suitable size from fitting to ceiling rose/ connection terminals complete all as directed. |
| 20 | Supply & fix in replacement High efficacy 1'x1' LED 18 watt recess type/surface full lit with suitable size from fitting to ceiling rose/connection all connected accessories with all accessories pre-wired and including connecting up with three core twisted flexible copper conductor cable with suitable size from fitting to ceiling rose/connection terminals and adjusting rings for fix etc. |
| 21 | Taking down carefully copper/ aluminium point wiring (light, fan and power socket etc) complete including fittings such as switches ceiling roses, pendent, regulators, sockets, MCB/ MCCB/ MCB DB/ earth plug and socket etc and making good matching to the existing colour to the disturbed surface. Please Enable Macros to View BoQ information |
| 22 | Taking down carefully copper/ aluminium point wiring (light, fan and power socket etc) complete including fittings such as switches ceiling roses, pendent, regulators, sockets, MCB/ MCCB/ MCB DB/ earth plug and socket etc and making good matching to the existing colour to the disturbed surface. Please Enable Macros to View BoQ information |