|
| 1 | Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refilling of excavated trench/pit/road shall be done properly i.e. after a layer of 20cm with proper watering and ramming in layers. For entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) |
| 2 | In all type Soil AC/PVC/HDPE pipe |
| 3 | 50/63/75mm |
| 4 | 80/90mm |
| 5 | 100/110mm |
| 6 | 125/140mm |
| 7 | 150/160/180mm |
| 8 | 200/225mm |
| 9 | 250/280mm |
| 10 | 300/315mm |
| 11 | 350mm |
| 12 | 400mm |
| 13 | Add on above item no. 1.1 for B.T. Road |
| 14 | Add on above item no. 1.1 for C.C. Road . Pitin CC Road shall be cut in optimum size through CC cutter machine only. |
| 15 | Add on above no. 1.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 16 | Add on above no. 1.1 item if depth of pipeline is above 3.0 mtr. |
| 17 | Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost) |
| 18 | In all type Soil |
| 19 | 100mm |
| 20 | 125mm |
| 21 | 150mm |
| 22 | 200mm |
| 23 | 250mm |
| 24 | 300mm |
| 25 | 350mm |
| 26 | 400mm |
| 27 | Add on above item no. 1.2 for B.T. Road |
| 28 | Add on above item no. 1.2 for C.C. Road . Pitin CC Road shall be cut in optimum size through CC cutter machine only. |
| 29 | Add on above no. 1.2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 30 | Add on above no. 1.2 item if depth of pipeline is above 3.0 mtr. |
| 31 | Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) |
| 32 | In all type Soil |
| 33 | 50/63/75mm |
| 34 | 80/90mm |
| 35 | 100/110mm |
| 36 | 125/140mm |
| 37 | 150/160/180mm |
| 38 | 200/225mm |
| 39 | 250/280mm |
| 40 | 300/315mm |
| 41 | 350mm |
| 42 | 400mm |
| 43 | Add on above item no. 1.3 for B.T. Road |
| 44 | Add on above item no. 1.3 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only. |
| 45 | Add on above no. 1.3 item if depth ofpipeline is above 1.5 mtr and up to 3.0 mtr. |
| 46 | Add on above no. 1.3 item if depth ofpipeline is above 3.0 mtr. |
| 47 | Replacement of CI/ DI Double flange sluicevalves,non return valves,butter fly valves etc.in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) |
| 48 | In all type Soil |
| 49 | 80 mm |
| 50 | 100 mm |
| 51 | 125 mm |
| 52 | 150 mm |
| 53 | 200 mm |
| 54 | 250 mm |
| 55 | 300 mm |
| 56 | 350 mm |
| 57 | 400 mm |
| 58 | Add on above item no. 1.4 for B.T. Road |
| 59 | Add on above item no. 1.4 for C.C. Road . Pitin CC Road shall be cut in optimum size through CC cutter machine only. |
| 60 | Add on above item no. 1.4 if depth of pipeline is above 1.5 mtr to 3.0 mtr |
| 61 | Deduct on above item no. 1.4 if valve is fixedat plinth level / platform i.e. no excavation is required |
| 62 | Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. |
| 63 | In all type Soil |
| 64 | 75 mm |
| 65 | 90/80 mm |
| 66 | 110/100 mm |
| 67 | 140/125 mm |
| 68 | 180/160/150 mm |
| 69 | 225/200 mm |
| 70 | 250 mm |
| 71 | 300 mm |
| 72 | Add on above item no. 1.5 for B.T. Road |
| 73 | Add on above item no. 1.5 for C.C. Road . Pitin CC Road shall be cut in optimum sizethrough CC cutter machine only. |
| 74 | Add on above item no. 1.5 if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 75 | Add on above item no. 1.5 if depth of pipeline is above 3.0 mtr. |
| 76 | Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. |
| 77 | In all type Soil |
| 78 | 80 mm |
| 79 | 100 mm |
| 80 | 125 mm |
| 81 | 150 mm |
| 82 | 225/200 mm |
| 83 | 250 mm |
| 84 | 300 mm |
| 85 | Add on above item no. 1.6 for B.T. Road |
| 86 | Add on above item no. 1.6 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only. |
| 87 | Add on above item no. 1.6 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. |
| 88 | Add on above item no. 1.6 if depth of pipeline is above 3.0 mtr |
| 89 | Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour. |
| 90 | Add on above item no. 1.7 for B.T. Road |
| 91 | Add on above item no. 1.7 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only. |
| 92 | Add on above item no. 1.7 if depth of pipeline is above 1.5 mtr and up to 3.0 mtr |
| 93 | Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost) |
| 94 | In all type Soil |
| 95 | 80 mm dia pipe to 100mm |
| 96 | 125 mm dia pipe to 150mm |
| 97 | 200 mm dia pipe to 250mm |
| 98 | 300 mm dia pipe to 350mm |
| 99 | 400mm |
| 100 | Add on above item no. 1.8 for B.T. Road |
| 101 | Add on above item no.1. 8 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only. |
| 102 | Add on above item no. 1.8 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 103 | Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). |
| 104 | In all type Soil |
| 105 | 80 mm to 110 mm |
| 106 | 125 mm to 165 mm |
| 107 | 200 mm to 300 mm |
| 108 | Add on above item no. 1.9 for B.T. Road |
| 109 | Add on above item no. 1.9 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only. |
| 110 | Add on above item no. 1.9 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 111 | Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). |
| 112 | In all type Soil |
| 113 | 80 mm to 100 mm |
| 114 | 125 mm to 150 mm |
| 115 | 200 mm to 300 mm |
| 116 | 350 mm to 450 mm |
| 117 | 500 mm to 600 mm |
| 118 | Add on above item no. 1.10 for B.T. Road |
| 119 | Add on above item no. 1.10for C.C. Road .Pit in CC Road shall be cut in optimum size through CC cutter machine only. |
| 120 | Add on above item no. 1.10 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 121 | Labour charges for removal of complaint of polluted water supply to the consumers |
| 122 | Survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours |
| 123 | Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size |
| 124 | In all type Soil |
| 125 | 50 to 75 mm |
| 126 | 80-110 mm |
| 127 | 125 to 165 mm |
| 128 | 200 to 300 mm |
| 129 | 350 to 400 mm |
| 130 | Add on above item no.1.12 for B.T. Road |
| 131 | Add on above item no. 1.12 for C.C. Road .Pit in CC Road shall be cut in optimum size through CC cutter machine only. |
| 132 | Add on above item no. 1.12 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 133 | Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution CI/DI/MS pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges tocomplete the work for pipe size |
| 134 | In all type Soil |
| 135 | 80-100 mm |
| 136 | 125 to 150 mm |
| 137 | 200 to 300 mm |
| 138 | 350 to 400 mm |
| 139 | Add on above item 1.13 for B.T. Road |
| 140 | Add on above item no. 1.13 for C.C. Road .Pit in CC Road shall be cut in optimum size through CC cutter machine only. |
| 141 | Add on above item no.1.13 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 142 | Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal & tack coat as per site condition by using ready cold mix up to the satisfaction of engineer in charge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job. |
| 143 | Restoration of cement concrete road including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compacting cement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction of engineer incharge. The rate includes the making of pit in regular shape, all labour, material and T&P chargecomplete job. |
| 144 | Replacing pipes / pipe piece - removing leakages from CI Pipe Line with care by excavating trench to required length and depth with dewatering and filling of trenches with earth up to original level after testing the system. This includes the earth work in excavation in saturated soil up to a depth of 0.30 m ( 1 ft ) including pumping of water etc complete as per specifications. Also this includes the extra for earth work in excavation in saturated soil for every 25 cm depth of part thereof over 0.30 m depth including pumping or bailing out of water, labour charges for dewatering, carriage ( Loading / Unloading ) of pipe and other jointing materials etc from store of Junior Engineer concern to required site, cutting of pipes and making CI Det joints in all respect for ( Rates are inclusive of earth work and exclusive of WBM / Chap / Cement Concrete/ Bituminous road cutting ) |
| 145 | CI Pressure Pipe Line ( 450 mm) |
| 146 | For Length up to 1.0 m |
| 147 | For Length up to 2.0 m |
| 148 | For Length up to 3.0 m |
| 149 | Providing and fixing of flanged/ plain ended MS Specials made from MS sheet strips of relevant IS specification of approved thickness by welding, lowering, laying, aligning, fixing in positionat all level/depths in trenches complete including all taxes, material, labour, inside lining, outside coating testing and commissioning along with pipe line as per technical specifications and direction of Engineer in-charge. |
| 150 | MS pipe specials up to 600mm dia (with minimum 5mm thicknesssheet) |
| 151 | Welding on M.S. / G.I. Pipes and other material by Electric Welding, this includes all the material like welding rods/ equipment like welding machine/ generator, if required for job. |
| 152 | On Site |
| 153 | G. Total Please Enable Macros to View BoQ information |