| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in trenches of required width and gradient for laying and jointing of pipe line including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 Mtr. including taking out the excavated soil, and then returning the soil as required in layers not exceeding 20cm in depth including consolidating each deposited layer by ramming, watering etc. and disposal of surplus excavated soil as directed within a lead of 50 Mtr. including required all safety provisions etc.:All kinds of soil |
| 2 | Dismantling of cement concrete pavement for pipe line and chambers by mechanical means using pneumatic tools, cutting the peripheral edge by CC cutter, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 meters. Measurement for dismantled trench to be made as per standard trench width specified in tender document and no extra payment shall be made be made for trench width more than specified, re-handling of material/earth to complete the tasks as per technical specification and scope of work. |
| 3 | Dismantling of flexible pavement for pipe line and chambers by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 meters. Measurement for dismantled trench to be made as per standard trench width specified in tender document and no extra payment shall be made be made for trench width more than specified, re-handling of material/earth to complete the tasks per technical specification and scope of work. |
| 4 | Bituminous courses |
| 5 | Granular courses |
| 6 | Providing and laying in position cement concrete M10 grade nominal mix 1:3:6 (1 Cement : 3coarse sand : 6 graded stone aggregate 40 mm nominal size) in base course complete including all material, labour, machinery, lighting, guarding for road restoration work in trenches of pipe line and chamber work. Measurement for CC work to be made as per standard trench width specified in tender document and no extra payment shall be made be made for trench width more than specified, complete work as per technical specification and scope of work. |
| 7 | Providing and laying in position cement concrete in specified grade over prepared base course complete including finishing, curing, all material, labour, machinery, lighting, guarding for road restoration work in trenches of pipe line and chamber work. Measurement for CC work to be made as per standard trench width specified in tender document and no extra payment shall be made be made for trench width more than specified, complete work as per technical specification and scope of work. |
| 8 | Plain cement concrete pavement of M-30 Grade |
| 9 | Providing Household Tap Connection as per technical specification and approved drawing as per relevant IS code (amended up to date) from HDPE/uPVC/DI/AC/MS/GI pipe line up to consumer meter/premises by using PP mechanical Integrated saddle with inbuilt flow control valve made out of SS316 designed for 5 LPM discharge at 0.5 bar pressure , not exceeding the flow of 7 LPM at 2 bar and a compression elbow, moulded in single piece/ fusion welded (Complete job) including digging out suitable size of pits and trench for laying service line in all kinds of soil; depositing and refilling of pit & jhiri with watering & ramming /compacting in layers and disposal of surplus excavated soil as directed with in a lead of 100 meter ; providing & fixing of all fitting duly approved in accordance with specification for potable water including GM Full-way Valve (IS:778 Mark) or wheel valve and specials with 20 mm nominal dia MDPE pipe PE 80 PN 16 as per ISO 4427 / 20 mm nominal dia PPR-C (Three layered) pipe PN16 SDR 7.4 (IS:15801:2008) (ISI mark) and above ground level using PPR-C pipe with standard PPR fittings/ GI pipes in the premises for fixing a tap / meter box (excluding) ,including accessories with flushing, cleaning, disinfecting and testing of pipe line complete required for making of service connection complete in all respect including labour charges . The service line should be laid at least 45 cm below ground level.Note: Road cut and restoration is not part of this item and paid separately. |
| 10 | For connection with 20 mm dia MDPE/PPR-C pipe length up to 05 mtr. |
| 11 | Providing Household Tap Connection as per technical specification and approved drawing and as per relevant IS code (amended up to date) from HDPE pipe line up to consumer meter/premises by using electro fusion saddle piece (Complete job).This job includes digging out suitable size of pits and trench for laying service line in all kinds of soil; depositing and refilling of pit & jhiri with watering & ramming /compacting in layers and disposal of surplus excavated soil as directed with in a lead of 100 meter ; providing & fixing of all fitting duly approved in accordance with specification for potable water including electrofusion saddle piece, gunmetal ferrule 4.0 mm , GM Full-way Valve (IS:778 Mark) or wheel valve and specials, below ground level 20 mm nominal dia MDPE pipe PE 80 PN 16 as per ISO 4427 / 20 mm nominal dia PPR-C (Three layered) pipe PN16 SDR 7.4 (IS:15801:2008) (ISI mark) for and above ground level using 20 mm dia PPR-C pipe with standard PPR fittings/ 15 mm dia GI pipes with fittings in the premises for fixing a tap / meter box (excluding) ,including accessories with flushing, cleaning, disinfecting and testing of pipe line complete required for making of service connection complete in all respect including labour charges . The service line should be laid at least 45 cm below ground level.Note: Road cut and restoration is not part of this item and paid separately. |
| 12 | For connection with 20 mm dia MDPE/PPR-C pipe length up to 05 mtr |
| 13 | Add extra over item no 6.1 and 7.1 for providing 20 mm PE 80 PN 16 as per ISO 4427 MDPE pipe including excavation, providing, laying & jointing of service line above 5.00 mtr. |
| 14 | Providing and making house service connections from water supply distribution HDPE pipe line upto water meter chamber inside the property using HDPE (Class-PE 80) PN 6 composite pipes for upto 5 metre length. The item consisting of composite pipes of HDPE pipebelow the ground level and GI class B pipe above the ground level including supply and fixing of ferrules, electro fusion saddle, clamps, rubber sheets, tapping, compression fittings etc, complete including all material, labour, testing and commissioning as per Technical Specifications and as per direction of Engineer. |
| 15 | 25 mm Diameter HDPE below the ground & 20 mm GI pipe class B above the ground |
| 16 | 32 mm Diameter HDPE below the ground & 25 mm GI pipe class B above the ground |
| 17 | Providing, lowering, laying & jointing MDPE/ HDPE pipes (Class-PE 80) PN 12.5 composite pipes for extra length for house service connections as per drawing and specifications complete including all material, labour, testing and commissioning as per TechnicalSpecifications and as per direction of Engineer. |
| 18 | 25 mm dia service pipe |
| 19 | 32 mm dia service pipe |
| 20 | including supply and fixing of ferrules, electro fusion saddle, clamps, |
| 21 | rubber sheets, tapping, compression fittings etc, complete including |
| 22 | all material, labour, testing and commissioning as per Technical |
| 23 | Specifications and as per direction of Engineer |
| 24 | 25 mm size |
| 25 | 32 mm size |
| 26 | 50 mm size |
| 27 | Removing & Re-fixing of Precast concrete interlocking blocks for laying of pipe line by manual method, stacking of serviceable & non serviceable material separately, disposal of dismantled material lead up to 50 mtr. The C.C. interlocking paving blocks be laid on average 25 mm thick bed of coarse sand and the joints to be filled with fine sand. Laying procedure on compacted sub base as defined. Complete job is to be executed as per the directions of Engineer in charge. The rates to be inclusive of fixing of 70 percent reusable precast concrete interlocking block and cost of required new precast concrete interlocking block against damaged, including all lead and lift as per Technical specifications. (Interlocking block manufactured by fully computerized automatic stationery hydraulic vibro pressed machine & full computerized automatic batching plant of class A-1 as per BS:6717-2001. Tensile splitting strength and breaking load as per BS: 6717-2001 Colour: Grey cement natural colour. Variation in Dimension : Less than 1.6 mm Variation in thickness: Less than 3.2 mm) Note: If existing precast block used more than 70%, than for every 1% use above 70%, deduction of 1% in cost shall be done for every 1% use above 70%. |
| 28 | 60 mm thick. |
| 29 | 80 mm thick. |
| 30 | 100 mm thick |
| 31 | Horizontal directional drilling (by trenchless technology) of suitable dia hole minimum 1.0 mtr below natural ground level in all type of soil under CC/BT roads and pulling HDPE pipes of dia up to 110 mm, which are available in the form of a coil including excavation, shoring/ strutting, preparation, maintain the thrust and including, road dismantling, excavation and refilling of drive pit and exit pit, restoration of road cut as per technical specification and scope of work, but excluding the cost of pipe line. Please Enable Macros to View BoQ information |