| 1 | Sch 'A' Part-I (Building Work):-This Schedule is not Pre-Priced by MES and the Pre-Priced rate indicated as \\"Rs. 0.00\\" under col.5 signifies this fact only. |
| 2 | Construction of block of operator cum LT panel room complete all as shown on drawings and as specified. |
| 3 | Total Amount of Sch 'A' Part - II (Site Clearance and Development Work) |
| 4 | Total Amount of Sch 'A' Part - III (Internal Water Supply Work) |
| 5 | Total Amount of Sch 'A' Part - IV (Internal Electric Supply Work) |
| 6 | Total Amount of Sch 'A' Part - V (Plumbing Work) |
| 7 | Total Amount of Sch 'A' Part - VI (Area Drainage) |
| 8 | Total Amount of Sch 'A' Part - VII (Sewage Disposal (Sump Well, Sewer Line and House Connection etc,) Work) |
| 9 | Total Amount of Sch 'A' Part -VIII (Road, Path, Culvert And Hard Standing Work) |
| 10 | Total Amount of Sch 'A' Part -IX (External Water Supply and Staging for Treated Water Work) |
| 11 | Total Amount of Sch 'A' Part - X (External Electric Supply Work) |
| 12 | Total Amount of Sch 'A' Part - XI (Compound Wall Work) |
| 13 | Sch 'A' Part - XII (Misc Items of work) Note : This Schedule is not Pre-Priced by MES and the Pre-Priced rate indicated as \\"Rs. 0.00\\" under col.5 signifies this fact only. |
| 14 | Designing (Hydraulically . Structurally and aesthetically), Providing constructing hydraulic testing, commissioning of sewage treatment plant (450 KLD Capacity) consisting of coarse bar screening chamber (RCC) with steel screening (Manual), receiving sump RCC, Submersible pumps in receiving sump, stilling chamber in RCC, fine bar screen chamber ( Manual) RCC with steel screen, oil & grease remover (RCC), Grit separator equalization tank (two tank of 50% capacity each), air grid for equalization tank, feed pumps 02 No's, moving bed Bio reactor (s) with plastic media of appropriate density , size and quality to keep very high MLSS greater than 15000mg / litre). Air blowers for MBBR (02 No's), tube settlers assay, sludge pump screw type 02 No's Sludge dewatering centrifugal, sludge holding tank, Air grid for sludge holding, chlorine dozing system chlorine contact tank, foundation for all E/M equipment's, associated piping work with reqd valves, gates, drains, pathways, electrical control panel with inter connecting cable, spare parts for 2 years of operation, etc. complete as turned key job with all involved civil, electrical, digital and mechanical works as per detail specification for civil, electrical and mechanical components with all duties and taxes complete. Also refer important notes below:-) for Tertiary treatment it also include filter feed tank of RCC, Filter feed pump, Dual media filter, activated carbon filter, treated water tank in RCC. Treated water can also been used for irrigation, horticulture, fire fighting and MT wash. (Contd.../) |
| 15 | Tertiary treatment includes for one No chlorine contact cumfilter Feed tank in MS FRP construction, as per design specification of OEM with one set of chlorine dozing system comprising of solution tank and dozing pump with necessary connection for dozing solution in chlorine contact tanks 02 No's, filter feed centrifugal mono block pumps complete with motor and all accessories and fitting for feeding tertiary unit, level sensor for chlorine contact cum filter feed tank inter link with pumps for ON/Off operation as per level in the sump, one pressure gauge for each pump to provide to measure pressure at the outlet one No dual media filter complete with media, frontal pipe valve and pressure gauge to measure the pressure across the filter, one no of activated carbon filter, complete with media, frontal piping, valve and pressure gauge, one No treater water tank in MS FRP construction to receive super natant coming from tertiary treatment, 02 No sludge transfer self priming mono block pump complete with all necessary fittings and accessories incl one pressure gauge for each pump, one no sludge holding tank in MS FRP construction as per design specifically to receive sludge from tube settler, 02 No's sludge transfer self priming monoblock pump complete with motors and all accessories and fittings, level sensor in the sludge holding tank and inter link with pumps for ON-OFF operation as per level in the sump, (Contd.../) |
| 16 | pressure gauge for each pumps, one electrical control panel for operation for all electrum mechanical STP, power and control cables of suitable size to inter connect with varies drives late over suitable cable tray and instrumentation with STP panel etc. complete incl permission of civil auth for connecting outlet water into natural resources testing , commissioning etc.; Note:- (i) Rate shall include for permission for civil auth for the connection of out let etc. testing , commissioning and design complete including all as specified. (ii) Estamation has been done considering the MBBR tech, in accordance inlet parameters and outlet parameters to be achieved are given. However contractor is free to design, testing, commissioning of any approved Technology of E-in-C branch without any extra cost to the department. (iii) The size of pump, tank, channels etc. consider in schedule are indicative for estimation purpose. contractor need to design 450KLD plant and all component including E/M and B/R of any E-in-C's approved tech of STP and same shall be vetted from IIT/NIT. (Contd.../) Please Enable Macros to View BoQ information |
| 17 | pressure gauge for each pumps, one electrical control panel for operation for all electrum mechanical STP, power and control cables of suitable size to inter connect with varies drives late over suitable cable tray and instrumentation with STP panel etc. complete incl permission of civil auth for connecting outlet water into natural resources testing , commissioning etc.; Note:- (i) Rate shall include for permission for civil auth for the connection of out let etc. testing , commissioning and design complete including all as specified. (ii) Estamation has been done considering the MBBR tech, in accordance inlet parameters and outlet parameters to be achieved are given. However contractor is free to design, testing, commissioning of any approved Technology of E-in-C branch without any extra cost to the department. (iii) The size of pump, tank, channels etc. consider in schedule are indicative for estimation purpose. contractor need to design 450KLD plant and all component including E/M and B/R of any E-in-C's approved tech of STP and same shall be vetted from IIT/NIT. (Contd.../) Please Enable Macros to View BoQ information |