| 1 | LABOUR |
| 2 | (124) Insertion of one HT PSC pole in existingOH line including digging & backfillingpit in ordinary soil, fitting cross arm,insulators, binding etc., drawingsufficient length of GI earth leads to theground for earthing (excluding provisionof earthing). |
| 3 | (128) Additional rate for excavation of one Pitfor HT Pole/HT Stay in Hard Laterite. |
| 4 | (119) Fitting and providing one HT Stay for11kV pole, including digging and backfilling pit in ordinary soil. |
| 5 | (163) Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns)including digging separate pit(0.45x0.45x1.5m) at standard distanceaway from the pole/structure in ordinarysoil & backfilling. |
| 6 | (204) Erecting one LT PSC Pole in positionincluding digging & back filling pit inordinary soil. |
| 7 | (205) Providing Stay for LT poles includingdigging & back filling pit in ordinarysoil. |
| 8 | (209) Additional rate for excavation of one Pitfor LT Pole/LT Stay in Hard Laterite. |
| 9 | (407) Renewal of existing damaged/broken oldLT stay in existing stay rod. |
| 10 | (327) Renewal of existing damaged/broken old11kV Stay to the existing stay rod. |
| 11 | (206) Providing Strut using LT PSC poleincluding digging and back filling pit inordinary soil. |
| 12 | (421) Straightening one slanted LT pole afterunbinding the line and binding the lineafter work. |
| 13 | (451) Disconnecting and lowering down thesingle phase WP service connection withguy wire from the OH line and reconnecting the same after completingthe line work. |
| 14 | (452) Disconnecting and lowering down thethree phase WP service connection withguy wire from the OH line andreconnecting the same after completingthe line work. |
| 15 | (554) Dismantling (without damage) one LTPSC/RCC pole after disconnecting stays,strut etc. attached thereon and stackingthe same. |
| 16 | (565) Dismantling (without damage) one kmLT single phase 2 wire OH lineconductor by dismantling cross arms,insulators and stacking the conductors inrolls properly. |
| 17 | (566) Dismantling (without damage) one kmLT three phase 4 wire OH line conductorby dismantling cross arms, insulatorsand stacking the conductors in rollsproperly. |
| 18 | (567) Dismantling (without damage) one kmLT additional conductor line bydismantling cross arms, insulators andstacking the conductors in rolls properly. |
| 19 | (610) Dismantling one ordinary streetlight/CFL/LED fitting from existing poleand refitting the same on newly erectedpole including disconnecting andreconnecting wires. |
| 20 | (702) Labour charges for loading HT PSC polefrom the stacking place and unloadingthe same at work site (transportation byany vehicle). |
| 21 | (706) Labour charges for loading LT PSC polefrom the stacking place and unloadingthe same at work site (transportation byany vehicle). |
| 22 | (726) Transporting poles by hired vehicle to adistance upto 5km and carrying upto 4numbers of poles excluding loading&unloading charges. |
| 23 | (1105) Stringing of 1.1 kV Aerial bunchedcable of size 3 x 70 + 1 x 16+1x 50sqmm with bare/insulated Messengerthrough existing poles |
| 24 | (1106) Stringing of 1.1 kV Aerial bunchedcable of size 1 x 25 + 1 x 25 sqmm withbare/insulated Messenger throughexisting poles |
| 25 | (1109) Erection of Anchor clamp / dead endclamp for LT ABC of any size |
| 26 | (1110) Erection of suspension clamp for LTABC of any size |
| 27 | (1114) Providing Cable Tie |
| 28 | (1115) Installing One No. Insulation piercingconnector of size Main :16 to 95,Tap:1.5 to 16 Sq.mm |
| 29 | (1116) Installation of Insulation piercingconnector for main to service line main:16-95 sqmm, Tap : 4-35 sqmm |
| 30 | (1117) Installation of Insulation piercingconnector for main to service line main:25-95 sqmm, Tap : 25-95 sqmm |
| 31 | (1126) Installation of Pre-insulated lugs for16sqmm |
| 32 | (1129) Installation of Pre-insulated lugs for70sqmm |
| 33 | (1132) Fitting of one No. pole top serviceconnection box of standard size (up to 4way) using ss strap/B&N of suitable sizein to the PSC/A poles at the standardheight excluding giving connections |
| 34 | (1134) Providing End Caps |
| 35 | (1141) Installing One No. 4 way SatelliteConnector of size Main :16 to 95, Tap:4to 35 Sq.mm to the LT AB cable ofStandard size |
| 36 | (2014) Transporting LT ABC by hired vehicleto a distance up to 5 km and carring upto 2 drum including loading and unloading using crane |
| 37 | (553) Dismantling one damaged LT PSC/RCCpole after disconnecting stays, strut etc.attached thereon and stacking the same. |
| 38 | (347) Straightening one slanted 11kV poleafter unbinding the line and binding theline after work. |
| 39 | (120) Fitting and providing one Strut using HTPSC pole including digging and backfilling pit in ordinary soil. |
| 40 | (157) Providing one Earth using GI earth pipeof size 38.1mm dia, 2.5m lengthincluding digging separate pit(0.45x0.45x2.5m) at a minimumdistance of 1.5m away from thepole/structure and maintaining standarddistance between different earth pipes inordinary soil & backfilling. |
| 41 | (161) Additional rate for excavation of oneEarth Pit (2.5m depth) in Hard Laterite. |
| 42 | Total of BoQ1 Please Enable Macros to View BoQ information |