| 1 | Earth Work in cutting in ordinary soil excavation to be the form of regular pits not exceeding 1/2 meter (20\\") distance as directed by the E/I.as per si.no. 253 |
| 2 | Disposal of extra exvated(westage) earth up to 8.00 km.of distance from site i/c all. |
| 3 | Construction of granular sub-base by providing well graded material, spreeding in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheeled roller to achieve the desired density, complete as per technical specification clause 401. |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes 63-45 mm to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as Technical Specification Clause 405. |
| 5 | Providing and laying of Rubber moulded Interlocking concrete block pavement having thickness 80 mm including leveling and dressing of surface To required level and slope spreading and moisting 30 m.m thick local sand on bend filling joints with local sand etc. for proper completion of work as per drawing and T.S. clause 1504 |
| 6 | Red Colour |
| 7 | Grey Colour |
| 8 | Providing and applying tack coat with RS-1 using Emulsion distributor @ 0.30 kg /sqm on prepared bitumen surface cleaned with hydroulic broom as per T.S.clause-503. |
| 9 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects |
| 10 | M-150 Brick Work in 1:4 Cement and sand of 1.25 F.M.morter in Foundation and plinth including S/O all material labour T&P etc proper completion of work same as per S.I.No.305. |
| 11 | 12 mm. thick plaster in 1:4 Cement and Fine sand morter with supply of all materials labour T&P.As per SI.No-584 |
| 12 | Construction of K.C. drain with precast of C.C. Blocks size (370x250 mm) laid in flat position (37.5mm in length) & kerb stone (300mm in length Including cost of all material labour T&P etc,proper completion of work. |
| 13 | S/F of 110 mm dia pvc pipe ISI Mark for drainage work |
| 14 | SFRC Medium Duty Manhole Cover With Frame Size (600x600x75 mm.) |
| 15 | SFRC Medium Duty Gully Pit Cover Size (300x300x50 mm.) |
| 16 | Supply and Fixing of imformatory sign board Please Enable Macros to View BoQ information |