| 1 | Earth work in excavation in foundation in ordinary soil including lift up or 1.50m and lead up to 30m and including lilling, watering and ramming excavated earth in to trenches or in to the space between the structure and sides of foundation SI No. 251 |
| 2 | Providing and Laying CC 1:3:6 with cement, Coarse sand, brick ballast (53-22.4) mm size including all cost of materials. T&P and Lab our etc SI. No. 280 |
| 3 | M-150 brick work in 1:3 cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work.SI NO-307 |
| 4 | M-150 brick work in 1:3 cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work.SI NO-307 As in item 302 to 307 above but in super structure including necessary cutting and moulding of bricks required and also including honey comb brick work, thickness of walls more than one brick and for extra lab our to above SINO-307+309 |
| 5 | Providing and laying R.C.C. slab (1:1:5:3) with cement, coarse sand and stone grit (25-10)mm size including all cost of materials T&P and lab our etc SI No. 284b |
| 6 | P/L Cement concreate Bed block & Wearing Coat 1:2:4 in slab all cost of materials. T&P and Lab our etc SI No. 279 a |
| 7 | Providing Cutting, Bending, Binding, Placing of reinforcement including all cost of material T&P and labour etc SI No 504 |
| 8 | Struck Deep pointing in 1:*2 cm, including cost of all materials and lab ours T&P etc SI No. 574 |
| 9 | Supplying and Fixing Drainage Pipe 110 mm i/c 12.5% cp |
| 10 | Class M-150 Brick Ballast 40mm gauge i/c 12.5% CP |
| 11 | E/W in cutting or filling embankment in ordinary soil complete in all respect |
| 12 | Earth work in excavation in foundation in ordinary soil including lift up or 1.50m and lead up to 30m and including lilling, watering and ramming excavted earth in to trenches or in to the space between the structure and sides of foundation. |
| 13 | Providing and Laying CC 1:4:8 with cement, Coarse sand, stone ballast (53-22.4)mm size including all cost of materials T&P and Lab our etc |
| 14 | Providing & constructing 1st class brick work with 1:4 cement mortar including all cost of materials, scaffolding T&P and labours etc. as per PWD SOR ch 6 item no 305 |
| 15 | Struck Deep pointing in 1:2 cm including cost of all materials and lab ours T&P etc |
| 16 | Providing and Laying of Rubber Moulded (Grey Colour) interlocking concrete Block pavement havings thicknes 80mm including leveling and dressing of surface to required level and slope spriding and moisting 30 mm thick local sand on bend filling joints with local sand etc. For proper complition of the work as per Drowing and Technical specification clause 1504 PWD. Sch. Ch Cement concrete Payment NS |
| 17 | S/F of Sign Board at site Please Enable Macros to View BoQ information |