| 1 | Annexure-A (Supply of following material as per UPCL Norms.) |
| 2 | MS nuts and bolts of assorted (off) sizes. |
| 3 | Supply of X-arm clamp suitable for PCC pole including nuts and bolts. |
| 4 | Supply of LT clamp suitable for PCC pole including nuts and bolts. |
| 5 | Supply of stay insulator of size 75 × 90 mm. |
| 6 | “Supply of shackle insulator of size 100 × 115 mm including nuts and bolts. |
| 7 | Supply and laying of LT Aerial Bunched (AB) cable, 3×35 sqmm + 1×25 sqmm. |
| 8 | Supply of aluminium crimping type lugs suitable for 70 sqmm conductor. |
| 9 | Annexure-B (Following work as per UPCL norms) |
| 10 | Erection and installation of earthing rod with proper grounding. |
| 11 | Fabrication of steel structures including cutting, bending, welding, and finishing as per site requirement. |
| 12 | Excavation of pits for installation of stay set as per site requirement. |
| 13 | Erection and installation of LT stay set complete in all respects. |
| 14 | Erection and installation of 11 kV stay set complete in all respects. |
| 15 | Grouting of stay set with cement concrete for proper fixing and stabilization. |
| 16 | Excavation of pit for pole erection including all types of soil. |
| 17 | Erection of single PCC pole complete with setting, alignment and stabilization |
| 18 | Laying and stringing of 1-Phase 2-Wire LT line using Weasel conductor including necessary accessories. |
| 19 | Lopping and chopping of tree branches interfering with electrical lines as per site requirement. |
| 20 | Erection and making of section pole complete in all respect. |
| 21 | Cartage of PCC poles including loading, unloading and transportation for lead of 21–50 km. |
| 22 | Cartage of SP-21/23 poles including loading, unloading and transportation for lead distance of 21–50 km. |
| 23 | Cartage of petty materials including loading, unloading and transportation for lead distance of 21–50 km. |
| 24 | Head load transportation of PCC poles including loading and unloading for lead distance of 1–3 km. |
| 25 | Straightening and re-alignment of tilted steel tubular (STP) poles including necessary labor and tools. |
| 26 | Re-sagging of 11 kV overhead line including adjustment of conductor tension and clearance as per standard norms. |
| 27 | Re-sagging of LT Line overhead line including adjustment of conductor tension and clearance as per standard norms. |
| 28 | Laying of 3×25+25 sq.mm LT cable for jointing of LT network including proper handling. |
| 29 | Straightening and realignment of tilted PCC pole including necessary labour and tools. |
| 30 | Painting of poles complete in all respect including primer and finishing coats. Please Enable Macros to View BoQ information |