| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 5.1.2 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level 5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 7 | Supply and packing of stone boulder in GI wire crates apron complete as per design and technical specifications and including cost of wire |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for: |
| 9 | Foundations, footings, bases for columns |
| 10 | Suspended floors, roofs, landings, balconies and access platforms. |
| 11 | Edges of Slabs and breaks in floors and walls under 20 cm wide |
| 12 | Carriage of Material by Mechanical Transport including loading & unloading stacking at site complete. |
| 13 | Sand nominal size average lead 15 KM by MT. |
| 14 | Stone-Aggregates nominal size average lead 15 KM by MT. |
| 15 | Stone at an average lead 15 KM by MT. Please Enable Macros to View BoQ information |