| 1 | Supply, Erection, Testing and Commissioning of support 300 Kg, 11Mtr long 150x150mm G.I RS Joist pole as per the specification of TPWODL including handing over of the same to TPWODL complete in all respect. |
| 2 | Supply, Erection, Testing and Commissioning of support 300 Kg, 13Mtr long 150x150mm G.I RS Joist pole as per the specification of TPWODL including handing over of the same to TPWODL complete in all respect. |
| 3 | Supply, Erection, Testing and Commissioning of 11 KV 55mm2 AAAC as per the specification of TPWODL including handing over of the same to TPWODL complete in all respect |
| 4 | Supply, Erection, Testing and Commissioning of cost of 11 KV single pole pin point with 11 Mt RS Joist (G.I) (Excluding AAAC, pole & civil cost) as per the specification of TPWODL including handing over of the same to TPWODL complete in all respect |
| 5 | Supply, Erection, Testing and Commissioning of cost of 11 KV DP with AB switch on 13 Mt RS Joist (G.I) (Excluding cost of pole & civil cost) as per the specification of TPWODL including handing over of the same to TPWODL complete in all respect |
| 6 | Supply, Erection, Testing and Commissioning of cost of installing 11 KV DP on 13 Mt RS Joist (G.I) (Excluding cost of pole & civil cost) as per the specification of TPWODL including handing over of the same to TPWODL complete in all respect |
| 7 | Supply, Erection, Testing and Commissioning of cost of 3Ph 11 KV line single pole cut point tapping pole with 11 Mt RS Joist (G.I) (Excluding cost of pole & civil cost) as per the specification of TPWODL including handing over of the same to TPWODL complete in all respect |
| 8 | Supply, Erection, Testing and Commissioning of LT 11 KV guarding as per the specification of TPWODL including handing over of the same to TPWODL complete in all respect |
| 9 | Supply of labour, T&P and making Dismantling of existing L.T line as per specification of TPWODL including handing over the dismantled materials to TPWODL complete in all respect |
| 10 | Supply of labour & concreting materials for concreting of stay set with concreting ratio 1:1.5:3 (M-20 Grade) of size (500mm x 500mm x 800mm) = 0.2 cubic meter per stay as per the specification of TPWODL including handing over of the same to TPWODL complete in all respect |
| 11 | Supply of labour & concreting materials for concreting of Pole pit with concreting ratio 1:1.5:3 (M-20 Grade) of size (500mm x 500mm x 1500mm) = 0.375 cubic meter per pole as per the specification of TPWODL including handing over of the same to TPWODL complete in all respect |
| 12 | Supply of labour & concreting materials for couping of poles with concreting ratio 1:1.5:3 (M-20 Grade) of size (500mm x 500mm x 450mm) = 0.1125 cubic meter per pole as per the specification of TPWODL including handing over of the same to TPWODL complete in all respect |
| 13 | Construction of earthing chamber including installation of earthing pipe making earthing chamber including excavation, soil teratment with bentonide powder, calculation of earth resistance including installation of 3 mtr GI pipe 40mm/30mm including weilding of flat GI around pipe as per the specification of TPWODL including handing over of the same to TPWODL complete in all respect Please Enable Macros to View BoQ information |