| 1 | Earth work in silt clearence of internal section of jahagirganj dy including initial all lead and lift with proper dressing from Km.- 0.000 to Km.- 40.200 |
| 2 | Earth work by Power transport for a lead of upto 1 Km including excavation loading ,unloading ,manual compaction and dressing including all lifts etc. |
| 3 | Earth work for clearence of Bridges and Culverts on channels in all types of soil ( wet / submerged) including all lead and lift up etc.from Km.- 0.000 to Km.- 40.200. |
| 4 | Earth work in correcting internal section of jahagirganj dy from Km.-40.200 to Km.- 63.000 with all lead and left with proper dressing and compaction etc. |
| 5 | Earth work in repairing and strenghtening R/B of jahagirganj dy from Km.-40.200 to Km.- 63.000 with all lead and left with proper dressing and compaction etc . |
| 6 | Ist class brick work in 1:4 C.M. with coarse sand including cost of all material, labour and T&P. |
| 7 | Deep struck cement pointing in 1:2 cement morter (per M²) for parapet Wall. |
| 8 | R.C.C. 1:1.5:3 (M-20) with dala stone grit 10 mm to 20 mm gauge & coarse sand including cost of all material, labour and T&P etc. |
| 9 | C.C. 1:1.5:3 (M-20) with dala stone grit 4.75 mm to 20 mm gauge & coarse sand including cost of all material, labour and T&P etc. |
| 10 | Painting one coat of white cement on parapet wall and painting two coat of surface weather coat enamel paint on new surface. |
| 11 | Supplying & Laying Reinforcement of steel including cutting, bending, proper placing and binding with binding wire with cost of all material labour and T&P. |
| 12 | Centering & Shuttering for R.C.C work including cost of all material labour and T&P |
| 13 | Costing & fixing RCC wheel guard in parapet corner. |
| 14 | Making sub grade for lining work including watering and compaction for perparation of sub grade. |
| 15 | Repairing of C.C. Lining with dowla after silt clearence of canal internal section. |
| 16 | Laying C.C. 1:2:4 (M-15) in foundation with hard stone ballast 10-20 mm size with coarse sand including cost of all material, labour and T&P etc. |
| 17 | 12 mm thick cement plaster in daula work in 1:4 C.M. with coarse sand including cost of all material, labour and T&P. |
| 18 | Repairing of damaged Head Regulator of dy./ minor in Jahagirgang dy.from km.0.000 to 62.760 |
| 19 | Repairing of damaged outlet of Jahagirgang dy.from km.0.000 to km 40.200. Please Enable Macros to View BoQ information |