| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.si no 2.5,i,(c) |
| 2 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by Engineer-in-charge within a distance of 60 meter (200 feet).17.2.2 |
| 3 | Earth work in excavation in foundation in ordinary soil including lift up or 1.50m and lead up to 30m and including lilling, watering and ramming excavated earth in to trenches or in to the space between the structure and sides of foundation SI No. 251 |
| 4 | Concrete with 4cm. gauge approved stone ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials labour and tools and plants etc. required for proper completion for the work.SI NO. 280 |
| 5 | Providing & constructing 1st class brick work with 1:3 cement mortar including all cost of materials, scaffolding. T&P and labours etc as per PWD SOR ch 6 item no 307 |
| 6 | Providing & constructing 1st blass brick work with 1:3 cement mortar in superstructre including all cost of materials. scaffolding. T&P and labours etc as per PWD SOR ch 6 item no 307+309 |
| 7 | Providing and laying R.C.C. slab (1:1:5:3) with cement, coarse sand and stone grit (25-10)mm size including all cost of materials T&P and lab our etc SI No. 284b |
| 8 | Cement concrete with 2cm. gauge approved stone ballast, approve coarse sand and cement in the proportion of 4:2:1 including supply of all materials, labour and T&P etc. required for proper completion of the work 279b |
| 9 | Providing Cutting, Bending, Binding, Placing of reinforcement including all cost of material T&P and labour etc SI No 504 |
| 10 | Struck pointing with cement mortar consisting 1 part cement and 2 parts of sand of 1.25 fineness modulus including supply of all materials labour and T&P etc. required for proper completion of the work.SI NO-574 |
| 11 | Supplying and Fixing Drainage Pipe 110 mm i/c 12.5% cp |
| 12 | Class M-150 Brick Ballast 40mm gauge i/c 12.5% CP |
| 13 | E/W in cutting or filling embankment in ordinary soil complete in all respect |
| 14 | Earth work in excavation in foundation in ordinary soil including lift up or 1.50m and lead up to 30m and including lilling, watering and ramming excavted earth in to trenches or in to the space between the structure and sides of foundation. |
| 15 | Providing and Laying CC 1:4:8 with cement, Coarse sand, stone ballast (53-22.4)mm size including all cost of materials T&P and Lab our etc |
| 16 | Providing & constructing 1st class brick work with 1:4 cement mortar including all cost of materials, scaffolding T&P and labours etc. as per PWD SOR ch 6 item no 305 |
| 17 | Struck Deep pointing in 1:2 cm including cost of all materials and lab ours T&P etc |
| 18 | Providing and Laying of Rubber Moulded (Grey Colour) interlocking concrete Block pavement havings thicknes 80mm including leveling and dressing of surface to required level and slope spriding and moisting 30 mm thick local sand on bend filling joints with local sand etc. For proper complition of the work as per Drowing and Technical specification clause 1504 PWD. Sch. Ch Cement concrete Payment NS |
| 19 | S/F of Sign Board at site Please Enable Macros to View BoQ information |