| 1 | Site Clearance including labour and materials and including grass cutting and carriage of materials by Head load . of work. |
| 2 | E/W in Excavation in ordenery soil in foudation including labour and matrials and T/P with all com. Work SI No. 251 |
| 3 | C.C. Work in 1:4:8 in cement, Coarse sand and 40 mm Gauge Brick Ballast including labour and matrials , T/P with all com. Work SI No. 275 |
| 4 | R.C.C. Work in Column Footing in 1:1.5:3 in cement coarse sand and 20mm gauge including labour and matrials , T/P with all com. Work SI No.287 |
| 5 | R.C.C. Work in Column in 1:1.5:3 in cement coarse sand and 20mm gauge including labour and matrials , T/P with all com. Work SI No.289 |
| 6 | Laying C.C. Road slab Consisting of 1:1.5:3 in cement, Coarse sand and 20 mm GaugeStone grit over prepared subgrade including labour and matrials , T/P with all com. Work SI No. 773(a) |
| 7 | MS work in R.C.C. work including labour and matrials , T/P with all com. Work SI No.504 |
| 8 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Electric resistance or induction butt welded tubes [DSR-10.16.3 (2023) |
| 9 | Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 1.0 mm thick with zinc coating not less than 275 gm/m².DSR 12.1.1 (2023) |
| 10 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. DSR 13.8 |
| 11 | Finishing walls with Acrylic Smooth exterior paint of required shade for New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm) 13.46.1 |
| 12 | S/F of rolling shutter of approved make etc all. Comp . Work SI No.520 |
| 13 | P/F 27.5cm long wire spring grade no 2 for rolling shutter.Work SI No.521 |
| 14 | P/F top cover for rolling shutter 18 Gauge.Work SI No.522 |
| 15 | P/F Ball Bearing for rolling shutter .Work SI No.523 |
| 16 | Painting & Warnishing on wood work & Iron Work with approved Paint including material T &P etc all Comp. |
| 17 | Electrification Work. |
| 18 | S/F of Granite Sign Board including labour and materials T/P with all com. Work. Please Enable Macros to View BoQ information |