| 1 | Dismentaling Reinforcement cement concrete including stacking of dismantled material with in 60M distance. as directed by Engineer-in-Charge |
| 2 | Dismentaling Brick work including stacking of material with in a distance of 60M as directed by Engineer-in-Charge |
| 3 | Dismantaling C.C. including base concreate and including stacking of dismentled material with in 60m distance. as directed by Engineer-in-Charge |
| 4 | E/W in foundation in all kind of soil with all lead and lift and including back filling, watering, ramming of excavated earth into the trenches and removal and disposal of surplus earth as directed by Engineer-in-charge within a distance of 30M from the foundation trenches. |
| 5 | Laying of C.C in (1:3:6) with stone ballast (20mm to 40mm) size and coarse sand FM not less than 2.0 including all cost of materials labour and T&P complete.as per direction by Engineer in charge. |
| 6 | Bending, binding ,cutting,placing in position steel reinforcement including materials with cost of binding wire and tack welding for proper completion of work. As per direction of Engineer in Charge. |
| 7 | Centering and shuttering for C.C/R.C.C. work including cost of all materials, labour and T&P etc for proper completion of work as per direction by Engineer-in-Charge |
| 8 | Reinforced cement concrete (1:1.5:3) in all RCC work with Coarse sand having F.M. Not less than 2, Crushed Stone Aggregate of size (4.75 mm to 20 mm) Mechanically mixed and properly compacted by Vibrator including cost of all materials labours T&P etc. as per direction of Engineer in charge. |
| 9 | Providing & Laying C.C. (1:1.5:3) with course sand and crushed aggregate with all cost of material, labour & T&P etc. as directed by Engineer-in-Charge |
| 10 | Providing and laying stone grite 4.75 mm to 10 mm with cost of all material,labour and T&P for proper completion of work as directed by Engineer-In-Charge as per drawing and I.D. specification. |
| 11 | Providing and laying 150 micron thick L.D.P.E film(first grade) with cost of all material,labour and T&P for proper completion of work as directed by Engineer-In-Charge as per drawing and I.D. specification. |
| 12 | Laying of C.C in (1:2:4) with stone ballast (12.5mm to 20mm) size and coarse sand FM not less than 2 including all cost of materials labour and T&P complete.as per direction by Engineer in charge. |
| 13 | Earth work in making Road Diversion for V.R.B. Construction including all lead , lift, labour and T&P etc.as per direction of engineer in charge |
| 14 | Supplying and laying PVC Pipe including material, labour,T&P etc. complete work directed by Engineer-in-charge. |
| 15 | Boring with 100 mm diameter casing pipe including lowering and extraction of assembly, loading, unloading and carriage including cost of all materials, labour and T&P etc. complete work approved by Engineer-in-charge as per drawing and I.D.Technical specification. |
| 16 | Running of 10 H.P generator set pump for dewatering including arangements of pump suction and delivery pipes and other accessories at site including cost of all material labour and T & P etc for complete work as directed by engineer in charge as per ID specification. |
| 17 | Earth work in Removing Road Diversion for V.R.B. Construction including all lead , lift, labour and T&P etc.as per direction of engineer in charge |
| 18 | Painting of wall with two coat water proofing cement paint of approved quality including preparation of surface on Structure including with all materials,labour and T&P etc. as directed by Engineer-in-Charge as per I.D. specification. |
| 19 | Dry brick on edge soling with 1st class brick including preparation of sub-grade to prescribed camber, filling joint with Local sand including cost of material, labour and T&P etc for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. Please Enable Macros to View BoQ information |