| 1 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.a) In ground floor including roof |
| 2 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75m. In ground floor including roof. (a) upto 150 mm. thick |
| 3 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. |
| 4 | Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). |
| 5 | On Bituminous Surface: (Using Bitumen Emulsion at the rate of 0.20 to 0.30 kg/sqm.) |
| 6 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in gound floor as per relevant IS codes.Pakur Variety |
| 7 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. Pakur Variety |
| 8 | Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth |
| 9 | Plaster (to wall, floor, ceiling etc.) with sand and cemen mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course scaffolding / staging where necessary (Ground floor). [Excluding cost of chipping over concrete surface] With 1:4 cement mortar 15 mm thick plaster |
| 10 | Hire charges of Earth mover / Excavator -cum -loader for 8 hours. including one no operator , one no. helper ,fuel etc. The rate inclusive of all expenses etc complete. |
| 11 | Transport of ready mix bituminous material from Hot Mix plant including loading and unloading. Screening, spreading and laying complete. |
| 12 | Supplying after procurement ready mix hot bituminous material [The rate is exclusive of carriage,loading & unloading laying roilling,tack coat etc. |
| 13 | Removal of rubbish, earth etc.from the working site and disposal of the same beyond the compound, in conformity with the Municipal/Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer –in-Charge. |
| 14 | Supplying and Laying in the specified pattern of Interlocking Concrete Block Pavements (ICBP) with concrete blocks (with concrete grade as specified as per Table 1 of IS 15658:C006) manufactured in steel mould clamped to a vibrating table by hydraulic pressure (as per cl. no. 6.30 of IRC:SP: 63 (2018), from BIS license manufacturer, with spacer nib (Small protruding profiles on the vertical face of a paver used as a device for keeping minimum joint gap in between the paving blocks, as per Cl.No.3.26 of IS 15658) and of a specified size and shape with aspect ratio (The ratio of length to thickness of a paver block, as per Cl.No.3.3 of IS: 15658) as per Table 2 of IS:15658 with flexural strength/breaking load as per Annexure G of IS:15658, on the prepared base course of specified CBR as per Table 1 of IRC SP 63 (2018) or else as mentioned in design and drawing with a cushion of compacted bedding sand of 25-33 mm thick (grading of the bedding sand as per clause 6.5.1 of IRC SP-63) and filling up the gaps in between paver blocks in joint filling sand will be as per clause 6.5.2 of IRC SP 63) and completing the edge of cut blocks as per Cl. No. 8.7 of IRC SP-63(2018) with proper confinement of bedding and joint filling sand, compaction, levelling and filling up of the edge gap. 100 mm thick. Grey |
| 15 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specifications Clause 202 for Rural Roads of MORD. By Mechanical Means, Bituminous Courses |
| 16 | Preparation and consolidation of sub-grade with power road roller of 8-12 tonne capacity after cutting existing road upto required depth, dressing to camber and consolidation with road roller including making good the undulation etc and re-rolling the sub-grade and disposal of surplus earth with lead upto 50 meters. |
| 17 | Urgent Providing & laying of Ready Mix Cat's instant Patch-Road repairing premix for Strand Bank Road , Brabourne Road Flyover, Howrah Bridge and other roads within jurisdiction of SE (RS) within Kolkata as per specification for sealing the joint between paver blocks/concrete surface & flexible pavement to prevent further damage of flexible pavements including cleaning, dressing & necessary preparation of bed or joints, sealing may be done manually or mechanically all completed as directed. The rate involves cost of bitumen primer, transportation, laying, handing, compaction, labours & machinery, surcharge cost for round the clock & urgent work including profit excluding GST etc. |
| 18 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). |
| 19 | (ii) 25 mm to 30 mm shuttering without staging in foundation. |
| 20 | Picking up and removing old bituminous layer or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as directed.By mechanical means (i) From 25 mm to 50 mm thick. |
| 21 | Loading, unloading and carriage of old taken out paver blocks/ sand/ rubbish from any location a distance of 5km by trucks as directed.. |
| 22 | Supplying, fitting fixing regulatory/symbol/road sign/ direction board sign with Vinyl sticker of approved quality for lettering/ figuring direction, arrow, symbol etc. pasted on 4mm thick plastic board having necessary holes at all corners and edges fixing with necessary bolting etc. with the existing steel/ other structures as per direction. The rate including cost of Vinyl sticker, plastic board, lettering/ figuring etc. Fitting, fixing, hoisting & placing in position on steel frame work with necessary bolting and transport charges complete as per approved drawing etc & direction of Engineer-in-charge but excluding the cost of required steel frame. |
| 23 | Hire Charges of Tata ACE including driver, fuel and other tools & tackles but excluding the labour cost of loading and unloading for shifting job at various place of SMP, Kolkata. For the Period of 8 hr. As directed by EIC. Please Enable Macros to View BoQ information |